The Jakarta Light Rail Transit (Jakarta LRT) (Indonesian: Lintas Rel Terpadu Jakarta) is one of the light metro systems in Jakarta, the capital city of Indonesia. It is being implemented by the Jakarta provincial government.[3] The first phase of the LRT, from Velodrome to Pegangsaan Dua, began commercial operations on 1 December 2019.[4]
Jakarta LRT at Boulevard Utara station | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Owner | Government of Jakarta | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Jakarta, Indonesia | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Transit type | Light metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of lines | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of stations | 6 (first phase) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | www | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Began operation | 1 December 2019 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | PT LRT Jakarta | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of vehicles | Eight two-car trainsets | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Headway | 10 minutes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System length | 5.8 km (3.6 mi) (first phase)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750V (DC) third rail[2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Top speed | 80 km/h | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Background
The Jakarta light rail transit project aims to tackle Jakarta's high road traffic congestion.[5] The rolling stock comes from Hyundai Rotem from South Korea. Each trainset consists of two cars and will be able to carry 270 to 278 passengers. There will be a total of 16 cars.[1] Platform screen doors by ST Engineering Electronics will be installed at all stations.
A public trial run began on 11 June 2019 between Boulevard Utara and Velodrome stations, with free admission to registered ticket holders.[6]
Network
- Phase 1 - Pegangsaan Dua - Velodrome, along 5.8 km[7]
- Phase 2A - Pegangsaan Dua - Jakarta International Stadium, along 7.5 km
- Phase 2B - Velodrome - Manggarai
Station Number | Station Name | Interchange/Notes | City |
Phase 1 | |||
---|---|---|---|
S-01 | Pegangsaan Dua | Terminal station | North Jakarta |
S-02 | Boulevard Utara | ||
S-03 | Boulevard Selatan | ||
S-04 | Pulomas | Transjakarta (K2-3 Pulomas)
M2 Jakarta MRT (planned at Pulomas) |
East Jakarta |
S-05 | Equestrian | ||
S-06 | Velodrome | Terminus until the completion of Phase 2 | |
Construction of Route 1 started on 22 June 2016. The first six kilometers of the route connecting the Kelapa Gading Depot to Velodrome Station was 29.61% complete by 26 June 2017. It was expected to be operational before the 2018 Asian Games.[8] However, this did not happen as construction is not yet finished and the Indonesia Asian Games Organizing Committee (INASGOC) considered that buses would be more effective in transporting the athletes.[9][10]
The test run for the LRT was initially scheduled for 10 August, however was delayed to 15 August 2018. Phase 1 was planned to begin operation in February, 2019.[11] After several delays, the line opened for free public trial run from July to late November 2019. Commercial operations began on 1 December 2019.[12][13]
Planned Line
- Kemayoran - Kelapa Gading along 21.6 km
- Joglo - Tanah Abang along 11 km
- Puri Kembangan - Tanah Abang along 9.3 km
- Pesing - Kelapa Gading along 20.7 km
- Pesing - Soekarno-Hatta Airport along 18.5 km
- Cempaka Putih - Ancol along 10 km.
References
- Ramadhan, Ardito (14 April 2018). "Ini Spesifikasi Kereta LRT yang Tiba di Jakarta". KOMPAS.com (in Indonesian). Retrieved 2 November 2018.
- Fahd, Zacky (3 December 2017). "Eksklusif: Ini Dia Foto Sarana Kereta LRT Jakarta Kelapa Gading – Velodrome!". KAORI Nusantara (in Indonesian). Retrieved 2 November 2018.
- "Rencana LRT di Jakarta". Kompas (in Indonesian). Jakarta. 11 September 2015. Archived from the original on 11 October 2015. Retrieved 21 September 2015.
- "LRT Jakarta Fare to be Valid per December 1". Tempo. Retrieved 22 November 2019.
- Eka, Aditya (13 September 2018). "Laporan Perjalanan: Inilah Kesan Pertama Kereta LRT Jakarta - KAORI Nusantara". KAORI Nusantara (in Indonesian). Retrieved 2 November 2018.
- "LRT Jakarta starts free public trial on Tuesday". 10 June 2019.
- Media, Kompas Cyber (24 August 2018). "Kemenhub Lakukan Operasional Terbatas untuk LRT Kelapa Gading - Kompas.com". KOMPAS.com (in Indonesian). Retrieved 7 September 2018.
- "In August 2018, Kelapa Gading-Rawamangun LRT to Commence Operation".
- Wuragil, Zacharias (12 August 2018). "Duh, LRT Jakarta Akhirnya Gagal Ikut Asian Games". Tempo (in Indonesian). Retrieved 26 August 2018.
- "LRT gagal beroperasi saat Asian Games Jakarta" (in Indonesian). Antara. 11 April 2018. Retrieved 26 August 2018.
- Manurung, M Yusuf (15 August 2018). "Kantongi Izin dari Kemenhub, Hari Ini LRT Uji Operasi". Tempo (in Indonesian). Retrieved 26 August 2018.
- Kartika, Mimi (3 June 2019). "Peresmian LRT Jakarta Diundur, Ini Penjelasan Anies". Republika Online. Republika Online. Retrieved 3 June 2019.
- Agung Sandy Lesmana and Stephanus Aranditio (21 June 2019). "Skybridge Rampung, Stasiun LRT Velodrome Resmi Terintegrasi Halte Busway".