Bukit Panjang LRT line
The Bukit Panjang LRT line (BPLRT) is a 7.6-kilometre (4.7 mi) automated guideway transit line in the residential town of Bukit Panjang, Singapore. The BPLRT is the only LRT line operated by SMRT Trains.[2] As the name suggests, it serves 13 stations in the neighbourhood of Bukit Panjang and Choa Chu Kang.
Bukit Panjang LRT line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | Laluan LRT Bukit Panjang (Malay) 武吉班让轻轨线 (Chinese) புக்கிட் பஞ்சாங் வரிரயில் (Tamil) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Land Transport Authority | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | Choa Chu Kang | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 13 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Automated guideway transit/People mover | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Light Rail Transit (Singapore) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | SMRT Trains Ltd (SMRT Corporation) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Ten Mile Junction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Bombardier Innovia APM 100 C801 Bombardier Innovia APM 100 C801A Bombardier Innovia APM 300 C801B (future) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 64,781 (July 2020)[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 6 November 1999 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 7.6 km (4.7 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Elevated | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 600V 3-phase AC Third rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The line is the first LRT line in Singapore, and was opened on 6 November 1999 by then Deputy Prime Minister and Defence Minister Tony Tan who later became Singapore's 7th President. As an elevated people mover system, it is fully automated. The line uses Innovia APM 100 C801 and C801A rolling stock supplied by Bombardier, running in a two-car formation.
History
The idea of Bukit Panjang LRT was first pitched in 1991 before the government announced (in 1994) that it would pilot the system there. Two years later, in 1996, construction began for the Bukit Panjang LRT, along which a few changes were distinguished from the MRT lines:
- It became the first (and at the time, the only) line with a fully automated train with no drivers (driverless trains would later become a prominent role starting from North East MRT line in 2003)
- There are 13 stations, a loop will be formed between stations for Bukit Panjang
- There was an integrated development at the Ten Mile Junction LRT station, comprising a station, depot and shopping centre. The station was decommissioned in 2019.
The LRT was planned to run above ground to avoid the road safety issues of trams, and because to avoid obstructing the KTM railway tracks, according to Low Seow Chay. Recalling "terrible" traffic jams at the junction of Woodlands Road and Choa Chu Kang Road during the early 90s, he explained: "The Bukit Panjang residents had trouble accessing the Choa Chu Kang MRT station and bus interchange including towards the city due to the poor traffic flow." The KJE was opened in 1994, diverting most of the heavy traffic and solving the problem. He also asked for a dedicated bus viaduct to be built to relieve congestion, but the request was rejected since LRT became the only main option.
Back in 1994, then-Transport Minister Mah Bow Tan, told Parliament of the need for "efficient and affordable" public transport, and that the potential of LRT as an internal feeder service was being studied. There are other intentions of the LRT to replace all the feeder buses. Today, residents have LRT and few feeder bus services.
The project, which was contracted to Adtranz, Keppel Corporation and Gammon Construction, was completed on 6 November 1999.[3]
On 5 August 1997, the Land Transport Authority awarded SMRT a licence to operate the LRT due to its experience with the MRT system.[4]
On 10 December 2010, the Ten Mile Junction LRT Station closed due to retrofitting of station, and reopened on 30 December 2011; however, due to the low demand, on 13 January 2019, the LRT station became the first-ever operational train station in Singapore to be permanently closed. Due to this, LRT Service C, which ran from Ten Mile Junction LRT station to loop via Senja, ceased operations.
Services
There are two services on the line: A and B terminate at Choa Chu Kang.
Service | Terminal | via | Notes |
Currently Operational | |||
---|---|---|---|
A | Choa Chu Kang | Senja | Senja to Petir Clockwise direction Operates during peak hours (Weekdays) only |
B | Choa Chu Kang | Petir | Petir to Senja Anti-clockwise direction |
Defunct | |||
C | Ten Mile Junction | Senja | Clockwise direction |
Stations
All stations, except Choa Chu Kang, have two facing side platforms. Choa Chu Kang has an island platform, similar to most Singapore MRT stations. All the stations on the LRT have half-height platform barriers, installed between 2016 and 2017. Choa Chu Kang station also has two additional platforms and a new set of fare gates to ease crowding during peak hours.
Number | Name | Image | Interchange/notes |
BP1 NS4 JS1 | Choa Chu Kang | Interchange with the North South line and the Jurong Region line (2026) Terminus for Services A & B | |
BP2 | South View | ||
BP3 | Keat Hong | ||
BP4 | Teck Whye | ||
BP5 | Phoenix | ||
BP6 – DT1 | Bukit Panjang | Connected to the Downtown line | |
BP7 | Petir | ||
BP8 | Pending | ||
BP9 | Bangkit | ||
BP10 | Fajar | ||
BP11 | Segar | ||
BP12 | Jelapang | ||
BP13 | Senja | ||
BP14 | Ten Mile Junction | Permanently closed since 13 January 2019 | |
Rolling stock
The line uses Bombardier Innovia APM 100 "people-movers", similar to the ones used by the Changi Airport Skytrain until 2006, coded C801 and C801A. C801s have been in operation ever since the start of service on the line in 1999, while C801As were delivered and started operations in late 2014. Each unit is 12.8 metres (41 ft 11.9 in) long.
Train formation
Since 2015, the majority of trains are in two-car (M-M) formations. Two-car formations are no longer limited to peak hours only and are now used at all times. This is due to the increase in ridership and the large number of apartments around Bukit Panjang. The units are limited to a two-car train formation because of station length.
Coupling is usually done in Ten Mile Junction Depot and the trains are coupled with the same car type: C801+C801 or C801A+C801A. Occasionally units are mixed for reasons such as rescue operations or testing.
Train control
The line is equipped with Bombardier's CITYFLO 550 fixed block signalling system for Automatic train control (ATC) under Automatic train operation (ATO) GoA 4 (UTO).[5] The subsystems consist of Automatic train protection (ATP) to govern train speed, Automatic Train Supervision (ATS) to track and schedule trains, and a computer-based interlocking (CBI) system that prevents incorrect signal and track points settings.
Incidents
- An LRT train with 20 passengers crashed into an empty one at Phoenix station on 19 November 2000 after an operations officer failed to do a manual check of the lines before restarting the network system. The impact threw seated and standing passengers to the floor of the train, injuring five of them. The service was disrupted for seven hours but it was restored in stages and was fully functional again by 2.30 pm the same day. Then Communications and Information Technology Minister Yeo Cheow Tong visited the site soon after being told of the accident. However, the cause of the accident was never uncovered to this day.[6]
- On 9 March 2015, during the evening peak hours, the Bukit Panjang LRT was suspended from service for a full 24 hours due to a power trip which was caused by a fire at Senja station. The fire was caused due to a sudden power surge and the fuse box failed to handle the surge. Usually the fuse box will trip the system and activate safety measures, but on that day the fuse box failed to do so and instead burst into flames. The problem was identified as arcing problem which was why the power "jumped". The reason for how the fire started, however, is still a mystery to this day.[7]
- On the late morning of 28 July 2016, a train departed Segar for Jelapang on Service B. However, the train sped past Jelapang, Senja and Bukit Panjang stations. One of the passengers said that the Emergency Stop Button was not working, and there was no response on the Emergency phone. According to a passenger, the train finally stopped before Phoenix station after another passenger managed to make a call on her mobile phone. Subsequent investigations showed that the train had a faulty antenna which resulted in the stations not being able to receive information about the train and thus did not stop the train at the stations.[8][9]
- In the wee hours of 24 March 2017, a man was killed in a train accident after the last train left Fajar LRT station. Residents, however, reported nothing unusual around the time of incident, and the body was found when a staff went to the platform levels to do routine checks. Straits Times revealed that in the past there were 2 cases of accidents along the same line. In 2000, Mr See Chau Lai, a hawker assistant, died after he was hit by a train near Jelapang LRT station of the same LRT line. A coroner's inquiry found that he walked along the tracks after having too much to drink. That was the first fatality since the Bukit Panjang LRT started operations. In 2010, a LRT technician died of injuries sustained after being hit by a train at Phoenix LRT station. Mr Chia Teck Heng was checking the power rail between Phoenix and Bukit Panjang stations.[10]
Future plans
SMRT and LTA announced for plans to completely overhaul the BPLRT system as the system is reaching its lifespan of 20 years. A few reasons for the overhaul of the system was due to the fact that the system has been plagued with problems since its first operation in 1999 and it is one of the two systems in the world that still uses the CX-100 train cars (the other being Miami MetroMover).[11] On 8 March 2017, The Bukit Panjang LRT will be upgraded to a new conventional LRT system like power supply, signalling, rolling stock, track, stations, new signalling system and upgrading, including ruling out of the scrapping of the entire system or changing to an automated guided vehicles that is drawn on self-power, as it will cause major traffic congestion.[12]
On 3 October 2017, A tender for the revamp of the Bukit Panjang LRT was announced and was to be awarded in early 2018.[13]
On 16 October 2017, Transport Minister Khaw Boon Wan has announced plans to shut the Bukit Panjang LRT down for a small number of years to pave the way for the system's overhaul.[14] "If we want to do serious upgrading — essentially to close it down so that we can re-do the whole tracks and so on, so that we don’t have these ups and downs. And we’re evaluating that proposition," he told reporters at a press briefing.[15]
On 23 October 2017, SMRT announced that the Bukit Panjang Light Rail Transit (BPLRT) system will begin operations at 7am, instead of 5.30am, on all Sundays from 12 November 2017 until the end of that year, to allow more time for works to improve service reliability.[16] "With the later opening on Sundays, our maintenance teams will have 1.5 more hours on top of the existing 2 hours every night. This is crucial as it allows our engineers to undertake heavy maintenance works and expedites scheduled replacement works," SMRT said in a Facebook post on 5 November 2017.[17]
On 7 March 2018, the Land Transport Authority awarded the contract to Bombardier Transportation for $344 million on upgrading the system. This includes replacing the line's signalling system with the new Communications-Based Train Control system for a tighter headway between each trains and thus, reducing waiting time. 19 first-generation trains will be replaced while 13 second-generation trains will be refurbished.[18] The upgrade is slated to be completed by 2024.[19]
On 23 March 2018, SMRT said that the Bukit Panjang LRT line will be closed on 11 Sundays from 15 April to 24 June that year as part of maintenance works aimed to improving the reliability of the beleaguered system.[20][21][22][23]
On 21 June 2018, SMRT said from 1 July to 28 October that year, all BPLRT stations will open on Sundays at 8am, instead of the usual 5.30am.[24][25][26]
From 13 January 2019, the BPLRT network will close earlier at 11.30pm daily to enable SMRT to intensify and accelerate maintenance and system renewal works.[27] Ten Mile Junction LRT station was closed due to low demand, and reused as a testing station for the new C801Bs.
From 1 December 2019, Service A on the BPLRT will only operate during weekdays peak hours while Service B will continue to operate as usual.[28]
On the Sundays between 4 October 2020 to 25 October 2020, train services on both directions will not be available as the authorities will undergo CBTC signalling tests.[29]
Controversy
On 12 September 2017, speaking at an event commemorating the completion of a power-rail upgrading project for the NSEW MRT lines, Minister for Transport, Khaw Boon Wan suggested that the Bukit Panjang LRT was built as an "afterthought" due to "political pressure".[30] Mr Khaw said that the trains were designed in a "masochistic" manner, forcing commuters to go up and down with the twists and turns. He also compared the ride to a roller coaster, saying that it caused him dizziness.[31] According to one commentator, his comment implies that his predecessor Mah Bow Tan erred in approving the LRT system. It also trivialises the work and contribution of railway engineers. Most critically, it implies that the PAP government had succumbed to pressure and spent hundreds of millions of dollars without serious consideration and robust planning.[32]
References
- "Land Transport DataMall". mytransport.sg. Archived from the original on 21 August 2020. Retrieved 20 August 2020.
- "About SMRT: Business and Subsidiaries". Archived from the original on 2 November 2017. Retrieved 4 November 2017.
- "Built at a cost of $285 million, Bukit Panjang LRT may be scrapped". The Independent. 7 October 2016. Archived from the original on 15 December 2019. Retrieved 15 December 2019.
- "SMRT 10th Anniversary Dinner". NAS. 5 August 1997. Retrieved 18 August 2019.
- "CITYFLO 550 - Singapore". Archived from the original on 4 July 2015. Retrieved 28 June 2015.
- Foo, Author Joey (4 January 2012). "Bukit Panjang LRT: Vehicle collision of 19 November 2000". Archived from the original on 14 July 2015. Retrieved 21 August 2016.
- "Bukit Panjang LRT services disrupted". TODAYOnline. Archived from the original on 11 June 2017. Retrieved 21 August 2016.
- hermesauto (1 August 2016). "Antenna fault causes Bukit Panjang LRT train to skip 3 stations: SMRT". The Straits Times. Archived from the original on 2 May 2019. Retrieved 2 May 2019.
- "Fault on antenna caused train to skip stations on BPLRT line: SMRT". CNA. Archived from the original on 2 May 2019. Retrieved 2 May 2019.
- "BPLRT Accident 2017". The Straits Times. Archived from the original on 25 March 2017. Retrieved 24 March 2017.
- "SMRT reveals options to overhaul ageing Bukit Panjang LRT System". Archived from the original on 28 November 2016. Retrieved 8 March 2017.
- "Bukit Panjang LRT to be Upgraded to a New Conventional and Reliable LRT line". The Straits Times. Archived from the original on 9 March 2017. Retrieved 8 March 2017.
- "Tender to be called for Bukit Panjang LRT overhaul". 3 October 2017. Archived from the original on 15 November 2017. Retrieved 15 November 2017.
- "Govt may shut down Bukit Panjang LRT for at least 3 years: Khaw Boon Wan". The Independent. Archived from the original on 19 October 2017. Retrieved 19 October 2017.
- "Govt mulling years-long shutdown to overhaul Bt Panjang LRT: Khaw Boon Wan". Today. Archived from the original on 17 October 2017. Retrieved 17 October 2017.
- Cheng, Kenneth (23 October 2017). "BPLRT to start running later on Sundays from Nov 12 for renewal works". TODAY Online. Archived from the original on 24 October 2017.
- "Bukit Panjang LRT to start at 7am every Sunday till year end". 11 November 2017. Archived from the original on 12 November 2017. Retrieved 12 November 2017.
- Land Transport Authority (7 March 2018). "Awarding of contract to renew BPLRT". Archived from the original on 8 March 2018. Retrieved 10 March 2018.
- hermesauto (7 March 2018). "Parliament: $344m overhaul of Bukit Panjang LRT; smoother rides expected from 2022". The Straits Times. Archived from the original on 2 May 2019. Retrieved 2 May 2019.
- hermesauto (23 March 2018). "Bukit Panjang LRT to close for 11 Sundays for maintenance works starting April 15". The Straits Times. Archived from the original on 2 May 2019. Retrieved 2 May 2019.
- "Reliability on Bukit Panjang LRT to 'improve significantly', but works won't solve bumpiness issues". CNA. Archived from the original on 24 August 2019. Retrieved 2 May 2019.
- "Bukit Panjang LRT to close on Sundays from 15 April-24 June for maintenance". sg.news.yahoo.com. Archived from the original on 2 July 2018. Retrieved 2 May 2019.
- "Bukit Panjang LRT to close on 11 Sundays, renewal contract signed". TODAYonline. Archived from the original on 24 March 2018. Retrieved 2 May 2019.
- "Bukit Panjang LRT to resume service on Sundays, but with shorter operating hours". CNA. Archived from the original on 24 August 2019. Retrieved 2 May 2019.
- hermesauto (21 June 2018). "Bukit Panjang LRT to resume Sunday operations in July with later opening time". The Straits Times. Archived from the original on 7 June 2019. Retrieved 2 May 2019.
- "Bukit Panjang LRT to resume operations on Sunday on July 1, but with later opening time". TODAYonline. Archived from the original on 24 August 2019. Retrieved 2 May 2019.
- "Joint News Release by the Land Transport Authority (LTA) & SMRT - New Operating Hours for the Bukit Panjang LRT from January 2019 as Planned Renewal Works Commence | Press Room | Land Transport Authority". www.lta.gov.sg. Archived from the original on 12 January 2019. Retrieved 2 May 2019.
- "LTA | News Room | 1 | Joint News Release by the Land Transport Authority (LTA) and SMRT - Progress Update on Renewal of Bukit Panjang LRT". www.lta.gov.sg. Archived from the original on 9 November 2019. Retrieved 9 November 2019.
- "Bukit Panjang LRT network to be closed on Sundays in October to facilitate renewal works". Archived from the original on 20 September 2020. Retrieved 18 September 2020.
- "Behind the 'political pressure' that led to the 'afterthought' of Bukit Panjang LRT". Channel Newsasia. 16 September 2017. Archived from the original on 21 November 2017. Retrieved 16 September 2017.
- Sean Chan Kit Whye (13 September 2017). "Transport Minister Khaw Boon Wan Admits Bukit Panjang LRT Was Built Under Political Pressure, Calls It An "Afterthought"". Must Share news. Archived from the original on 16 September 2017. Retrieved 16 September 2017.
- Don Ho Jia Hao (15 September 2017). "Hard to reconcile claim that Bukit Panjang LRT was an afterthought". Today. Archived from the original on 16 September 2017. Retrieved 16 September 2017.