LRT Line 1 (Greater Jakarta LRT)

The Greater Jakarta LRT Line-1 (Indonesian: Lintas pelayanan 1 LRT Jabodebek) or Cawang–Cibubur LRT is one of the three light rail line of the Greater Jakarta LRT which will connect trips from Cawang to Baranangsiang, Bogor. At the first phase it will connect Cawang to Harjamukti station, which is about 13.7 km length.

Trial run at Harjamukti Station
Overview
Other name(s)Cawang–Cibubur LRT
Native nameLintas pelayanan 1 LRT Jabodebek
StatusUnder construction
OwnerDJKA
LocaleJakarta, West Java
TerminiCawang
Harjamukti
Baranangsiang (phase 2)
Stations5
Service
TypeLight rail transit
SystemGreater Jakarta LRT
Services1
Operator(s)Kereta Api Indonesia
Depot(s)Harjamukti (pit stop)
History
Planned opening2022 [1]
Completed2022 [1]
Technical
Line length13.7 km (8.5 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification750 V DC Third rail system
Route map

Dukuh Atas
Setiabudi
Rasuna Said
Kuningan
Pancoran
Cikoko
Cawang
Ciliwung
Cawang
to Jatimulya
Taman Mini
Jagorawi Toll Road│JORR
Kampung Rambutan
Ciracas
Harjamukti
Phase 1: opening 2022
Phase 2: opening TBA
Cimanggis
Cibinong
Sentul Circuit
Sentul City
Baranangsiang
Baranangsiang Depot

The Greater Jakarta LRT Line-1 adopts elevated construction and runs along the Jagorawi Toll Road. From Cawang to Pasar Rebo, this lane is on the east side of the Jagorawi toll road. While from Pasar Rebo to Cibubur the route moves to the west side of Jagorawi. This line has five station stops. The next stage, this route will continue to Bogor.[2]

Stations

Station Transfer/Notes Location
Cawang  L2  Terminal station.

Planned interchange station to  L2 

Transjakarta (planned at K7-10 Cawang BNN)

East Jakarta Jakarta
Taman Mini Access to Taman Mini Indonesia Indah.
Kampung Rambutan Connected with Kampung Rambutan Terminal.
Ciracas
Harjamukti Terminal station (phase 1). Depok West Java

References

  1. "Proyek LRT Jabodebek Molor ke 2022" (in Indonesian). 5 June 2020. Retrieved 27 June 2020.
  2. Dewi Rina Cahyani (ed.). "Proyek LRT Cibubur - Bogor Ditargetkan Rampung 3 Tahun" (in Indonesian). Retrieved 11 November 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.