Soekarno–Hatta Airport Skytrain

The Soekarno–Hatta Airport Skytrain (Indonesian: Kalayang Bandara Soekarno–Hatta) is the driverless 3.05 kilometres Automated People Mover System (APMS) serves to connect Soekarno-Hatta Airport Terminals 1, 2, 3 and SHIA railway station, free of charge.[1] Skytrain takes 5 minutes from one terminal to another, with 7 minutes needed to get from Terminal 2 to Terminal 3.[2][3]

Soekarno–Hatta Airport Skytrain
Soekarno-Hatta Airport Skytrain used for airport terminals shuttle service
Overview
Native nameKalayang Bandara Internasional Soekarno-Hatta
StatusOperational
OwnerAngkasa Pura II
LocaleSoekarno–Hatta International Airport serving Jakarta
Stations4
Service
TypeAutomated people mover (APM)
Operator(s)Angkasa Pura II
Rolling stockWoojin Automated People Mover System
History
Opened17 September 2017[1]
Technical
Line length3.05 km (1.90 mi)
ElectrificationThird rail
Route map

Soekarno–Hatta Terminal 3
Soekarno–Hatta Terminal 2
Soekarno–Hatta Terminal 1
Integrated Terminal Building
SHIA
Skytrain Depot
to Batu Ceper & BNI City

Rolling stock

Automated People Mover System at Terminal 1 Station

The system uses Airport Automated People Mover System rubber-tyred metro manufactured by state-owned enterprise PT LEN Industri in cooperation with South Korean Woojin Industries.[4] Three train units operate with each train unit consisting of two cars. They are capable to transport 176 passengers in one trip. The train travels at a speed of 60 kilometers per hour and is equipped with automated guide-way transit (AGT) technology.

Stations

Skytrain Terminal 3 Station

There are 4 stations served by Airport Skytrain; Terminal 1, 2 and 3 each has one station. The airport shuttle Skytrain is integrated to SHIA railway station, from where passengers can conveniently travel to–and from–Jakarta city center by Soekarno–Hatta Airport Rail Link.

Skytrain operating schedule is accessible online and through the Indonesia Airport website and smartphone application. All Skytrain stations are equipped with platform screen doors and have plasma screens displaying real-time arrival time of the next train. Skytrain has been operational since 17 September 2017.[5]

Future expansion

Skytrain passengers

The Skytrain will be extended to planned new Terminal 4 and Sky Hub (commercial area) in Phase 2. Then it will be connected to Integrated Building Terminal, Terminal 1, 2 and 3.[6]

References

  1. Post, The Jakarta. "Soekarno–Hatta International Airport Skytrain is officially launched". The Jakarta Post. Retrieved 2018-05-04.
  2. "Skytrain Trials at Soekarno Hatta Airport to Begin in Mid August". Tempo. Retrieved 30 August 2017.
  3. "Skytrain to connect terminals at Soekarno–Hatta Airport". The Jakarta Post. Retrieved 30 August 2017.
  4. Post, The Jakarta. "Airport skytrain to be operated by crew for first six months". The Jakarta Post. Retrieved 2018-05-04.
  5. "Skytrain to link with Dukuh Atas in December". The Jakarta Post. Retrieved 18 September 2017.
  6. "Soekarno-Hatta Airport Airport Train officially operated for public". angkasapura2.co.id. Retrieved 29 December 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.