Line 7 (Suzhou Rail Transit)

Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019.[1] The line will be 29.6 kilometers long.[1]

Line 7
 7 
Overview
StatusUnder construction (one segment is operational)
OwnerSuzhou Rail Transit Co., Ltd
TerminiMoyang
Muli
Stations33
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
Technical
Line length29.6 km
Track gauge1,435 mm (4 ft 8 12 in)

According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7.[2]

It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.[3]

Stations

Station name Connections Distance
km
Location
English Chinese
Moyang 莫阳 0.000 0.000 Xiangcheng
Xiangchengdadao North 相城大道北
Suzhou North Railway Station 高铁苏州北  2 
Huizhanzhongxin 会展中心
Qinglonggang 青龙港
Fuyuanlu 富元路
Litanghelu 蠡塘河路
Chunshenhulu East 春申湖东路
Xiangcheng Administrative Center North 相城区行政中心北
Xiangcheng Administrative Center South 相城区行政中心南  8 
Baidang South 白荡南 SIP
Yangdonglu 扬东路
Yanghualu 扬华路
Xiandaidadao West 现代大道西
Central Park 中央公园  1 
Zhongxindadao West 中新大道西  6 
Huangtiandang 黄天荡  5 
Loufeng 娄葑
Dongxinglu West 东兴路西  8 
Tongyuanlu South 通园路南  3 
Linjiatanlu 林家潭路 Wuzhong
Guoxiang 郭巷  2 
Yinzhonglu South 尹中路南
Chenghudonglu 澄湖东路
Fengjinlu 枫津路
Hongzhuang 红庄  4 
Lishu 蠡墅
Shihu Moshe 石湖莫舍
Yuexi 越溪
Wenxi Lu 文溪路
Tian'edang Lu 天鹅荡路
Suzhouwan North 苏州湾北
Muli 木里

References

  1. "苏州轨道交通7号线开工建设". 2019-12-25.
  2. "Archived copy". Archived from the original on 2012-07-13. Retrieved 2012-06-29.CS1 maint: archived copy as title (link) (Website of the subway operator "SZ-Transit" (苏州轨道交通/Suzhou Guidao Jiaotong) (information retrieved on Oct. 16th, 2010))
  3. 顾蕾 (2012-02-10). 苏州轨交4号线及支线今年6月动工. 苏州日报 (in Chinese). Archived from the original on 2012-07-14. Retrieved 2012-06-19.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.