Line 5 (Suzhou Rail Transit)

Line 5 is a planned west–east line of Suzhou Rail Transit. Construction is expected to finish in 2021, and the line will be 44.1 kilometers long.[1] Its western terminus will be at Taihu Xiangshan station[2] in Wuzhong District, with its eastern terminus at Yangchenghu South station[2] in Suzhou Industrial Park.[3] 50 six car type B fully automated subway trains were ordered for the line.[4]

Line 5
 5 
Overview
StatusUnder construction
OwnerSuzhou Rail Transit Co., Ltd
TerminiTaihu Xiangshan
Yangchenghu South
Stations34
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
Technical
Line length44.1 km[1]
Track gauge1,435 mm (4 ft 8 12 in)

Stations

Station name[2] Connections Distance
km
Location
English Chinese
Taihu Xiangshan 太湖香山 0.00 0.00 Wuzhong
Huadun 花墩
Jinqiao 津桥
Xukou 胥口
Maopenglu East 茅蓬路东
Xujiaqiao 许家桥
Lingyanshan 灵岩山
Duchuanqiao 渎川桥
Dazhiqiao 大治桥
Xikuatang 西跨塘
Shicheng 石城 Huqiu
Luoxingqiao 落星桥
Suoshanqiao West 索山桥西  3 
Shuangqiao 双桥 Gusu
Laodonglu 劳动路  2 
Xinshiqiao 新市桥
Nanmen 南门  4 
Nanyuanbeilu 南园北路
Zhuhuiqiao 竹辉桥
Hehuadang 荷花荡 SIP
Huangtiandang 黄天荡  7 
Jinsheqiao 金厍桥  3 
Xingbojie 星波街
Ligongdi South 李公堤南
Jinhu 金湖
Hualian 华莲
Xietang 斜塘  8 
Suzhou Olympic Sports Centre 苏州奥体中心  6 
Fangzhougongyuan 方洲公园
Xingtangjie 星塘街  1 
Longdun 龙墩
Dongshahu 东沙湖
Fengtingdadao 葑亭大道  3 
Yangchenghu South[lower-alpha 1] 阳澄湖南[lower-alpha 1]
  1. The station is not the same station as another Yangchenghu South station on Line S1.

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.