Line 2 (Suzhou Rail Transit)

Line 2 is the main north-south line of Suzhou Rail Transit. It passes through five districts of Suzhou, and has 22 stations, 17 underground and 5 elevated. It began operations on December 28, 2013.

Line 2
 2 
Overview
StatusIn operation
OwnerSuzhou Rail Transit Co., Ltd
TerminiQihe
Sangtiandao
Stationstotal 35 stations, first phase are 22 stations (6 Elevated Stations, 16 Underground Stations), second phase are 13 stations.
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
History
OpenedDecember 28, 2013 (2013-12-28)
Technical
Line length40.4 kilometres (25.1 mi)
Track length79.2m
Number of tracks2
CharacterElevated and Underground
Track gauge1,435 mm (4 ft 8 12 in)
Electrificationoverhead wire
Shihu Road station under construction

History

The line was opened in two phases, with the 26.557 km (16.502 mi) long first phase from Suzhou North Railway Station to Baodaiqiao South near Baodai Bridge (宝带桥) started operations on December 28, 2013. This section consisted of 6.57 km (4.08 mi) of elevated track and 19.146 kilometres (11.897 mi) of underground track.[1]

The 14.347 km (8.915 mi) second phase, running from Qihe to Fuxiang Lu in the north, and from Yinzhong Lu (尹中路站) to Sangtiandao (桑田岛站) in the east, commenced trial operations on September 24, 2016.[2]

Opening timeline

SegmentCommencementLengthStation(s)Name
Suzhou North Railway Station — Baodaiqiao South 28 December 2013 26.557 km (16.50 mi) 22 Phase 1
Qihe — Suzhou North Railway Station 24 September 2016 2.2 km (1.37 mi) 2 Phase 2
Baodaiqiao South — Sangtiandao 11.643 km (7.23 mi) 11

Stations

Interchange signage in Guangji Nanlu Station
Station name Connections Distance
km
Location
English Chinese
Qihe 骑河 0.00 0.00 Xiangcheng
Fuxiang Lu 富翔路 0.88 0.88
Suzhou North Railway Station 高铁苏州北站  7  OHH 1.08 1.96
Dawan 大湾 1.51 3.47
Fuyuan Lu 富元路 1.98 5.45
Likou 蠡口 1.70 7.15
Xutu Gang 徐图港 1.40 8.55
Yangchenghu Zhonglu 阳澄湖中路  8  1.00 9.55
Lumu 陆慕 1.93 11.48
Pinglonglu East 平泷路东 1.64 13.12
Pinghe Lu 平河路  6  0.81 13.93 Gusu
Suzhou Railway Station 苏州火车站  4  SZH 1.06 14.99
Shantang Jie 山塘街 1.62 16.61
Shi Lu 石路 0.96 17.57
Guangji Nanlu 广济南路  1  0.81 18.38
Sanxiang Square 三香广场 0.88 19.26
Laodong Lu 劳动路  5  0.62 19.88
Xujiang Lu 胥江路 0.77 20.65
Tongjing Park 桐泾公园 0.73 21.38
Youlian 友联 1.24 22.62 Wuzhong
Panli Lu 盘蠡路  3  1.10 23.72
Xinjia Qiao 新家桥 1.08 24.80
Shihu Donglu 石湖东路  4  1.62 26.42
Baodaiqiao South 宝带桥南 1.88 28.30
Yinzhong Lu 尹中路  7  1.50 29.80
Guoxiang 郭巷 0.90 30.70
Guoyuan Lu 郭苑路 1.02 31.72
Yinshan Lake 尹山湖 1.07 32.79
Dushuhu South 独墅湖南 0.89 33.68 Gusu
Dushuhu Neighbor Center 独墅湖邻里中心 2.03 35.71
Moon Bay 月亮湾 0.91 36.62
Songtaojie 松涛街  8  1.23 37.85
Jingu Lu 金谷路 1.75 39.60
Jinshang Lu 金尚路  6  1.33 40.93
Sangtiandao 桑田岛  6  1.07 42.00

Operations

Line 2 train

Intervals

Weekdays & Weekends
PeriodTimeIntervals
weekdays morning rush hours(Peak)7:45 — 9:006m10s
weekdays evening rush hours(Peak)17:00 — 19:006m10s
weekends daily rush hours(Peak)11:00 — 20:406m10s
Other hours(Normal)Exclude above rush hours6m50s

[3]

References

  1. "Archived copy" 2号线施工6月底结束 12月28日试营运. 扬子晚报 (in Chinese). March 25, 2013. Archived from the original on February 25, 2013. Retrieved February 22, 2013.CS1 maint: archived copy as title (link)
  2. "终于定了!苏州轨交2号线延伸线明天正式开通". 新华报业网. September 23, 2016.
  3. "轨交二号线运输方案昨发布一号线将适当调整" (in Chinese). 搜狐. Retrieved December 26, 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.