Tengah Park MRT station
Tengah Park MRT station is a proposed Mass Rapid Transit (MRT) station on the Jurong Region Line located along the boundary of Tengah and Bukit Batok planning areas, Singapore.[1][2][3]
JE2
Tengah Park 登加公园 தெங்கா பூங்கா Tengah Park | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) station | ||||||||||||||||
Coordinates | 1°21′08″N 103°44′12″E | |||||||||||||||
Owned by | Land Transport Authority | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | Island | |||||||||||||||
Tracks | 2 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated | |||||||||||||||
Platform levels | 1 | |||||||||||||||
Parking | Yes | |||||||||||||||
Bicycle facilities | Yes | |||||||||||||||
Disabled access | Yes | |||||||||||||||
History | ||||||||||||||||
Opening | 2027 | |||||||||||||||
Electrified | Yes | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
Location | ||||||||||||||||
Tengah Park Tengah Park station in Singapore |
History
On 9 May 2018, LTA announced that Tengah Park station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 2, JRL (East), consisting of 7 stations between Tengah and Pandan Reservoir, and is expected to be completed in 2027.[4]
Contract J108 for the design and construction of Tengah Park Station and associated viaducts was awarded to John Holland Pty Ltd – McConnell Dowell South East Asia Pte Ltd Joint Venture (JV) at a sum of S$265.4 million in March 2020. Construction will start in 2020, with completion in 2026.[5][6] Contract J108 also includes the design and construction of Tengah Plantation Station and Bukit Batok West Station, and associated viaducts.[7][8]
Location
The station complex will be situated next to Bukit Batok Road, before the junction with Bukit Batok West Avenue 3. It is located at the boundary between the Tengah and Bukit Batok planning area in the Brickworks Subzone,[9] opposite Dulwich College (Singapore).
Access to the station will be via 5 exits on each side of Bukit Batok Road.[10]
References
- "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Residents and students welcome Jurong Region Line but find it confusing". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "LTA | News Room | news-releases | LTA Awards Civil Contract to Construct Three Stations for the Jurong Region Line". www.lta.gov.sg. Archived from the original on 18 March 2020. Retrieved 2020-03-18.
- hermesauto (2020-03-17). "Aussie joint venture lands $265 million deal to build three Jurong Region Line stations". The Straits Times. Archived from the original on 17 March 2020. Retrieved 2020-03-17.
- "Land Transport Authority – We Keep Your World Moving". www.facebook.com. Archived from the original on 17 March 2020. Retrieved 2020-03-17.
- "LTA awards $265.4m contract for three Jurong Region Line stations". Singapore Business Review. Archived from the original on 17 March 2020. Retrieved 2020-03-17.
- "Singapore's Bukit Batok Planning Area". Key Location. Retrieved 2019-09-21.
- "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.