Corporation MRT station
Corporation MRT station is a proposed Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong West, Singapore.[1][2][3]
JS5
Corporation 企业 கார்ப்பரெஷன் Corporation | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) station | ||||||||||||||||
Coordinates | 1°21′11″N 103°42′50″E | |||||||||||||||
Owned by | Land Transport Authority | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | Island | |||||||||||||||
Tracks | 2 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated | |||||||||||||||
Platform levels | 1 | |||||||||||||||
Bicycle facilities | Yes | |||||||||||||||
Disabled access | Yes | |||||||||||||||
History | ||||||||||||||||
Opening | 2026 | |||||||||||||||
Electrified | Yes | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
Location | ||||||||||||||||
Corporation Corporation station in Singapore |
History
On 9 May 2018, LTA announced that Corporation station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 1, JRL (West), consisting of 10 stations between Choa Chu Kang, Boon Lay and Tawas, and is expected to be completed in 2026.[4]
Contract J103 for the design and construction of Corporation Station and associated viaducts was awarded to Eng Lee Engineering Pte Ltd - Wai Fong Construction Pte Ltd Joint Venture (JV) at a sum of S$274.3 million. Construction will start in 2020, with completion in 2026.[5] Contract J103 also includes the design and construction of Hong Kah station, and associated viaducts.[6]
Location
The station will be straddled over the existing Jurong West Avenue 2, just east of the junction with Bulim Avenue and Corporation Road, and west of the PIE expressway exit. It is located within the Jurong West planning area between the Hong Kah and Wenya Subzones,[7] with a housing estate and the former site of Jurong Junior College to the south, and the Bulim district of the future Jurong Innovation District to the north.[8]
Access to the station will be via 4 exits, 2 of each side of Jurong West Avenue 2.[9]
References
- "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Residents and students welcome Jurong Region Line but find it confusing". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "LTA Awards Civil Contracts to Construct Five Stations for the Jurong Region Line | Press Room | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Tender information | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Singapore's Jurong West Planning Area". Key Location. Retrieved 2019-09-21.
- "JTC | Jurong Innovation District". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.