Tengah MRT station
Tengah MRT station is a proposed Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.[1][2][3]
JS3
Tengah 登加 தெங்கா Tengah | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) station | ||||||||||||||||||||||||||
Coordinates | 1°21′59″N 103°43′48″E | |||||||||||||||||||||||||
Owned by | Land Transport Authority | |||||||||||||||||||||||||
Line(s) | ||||||||||||||||||||||||||
Platforms | Stacked Island | |||||||||||||||||||||||||
Tracks | 4 | |||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||
Structure type | Elevated | |||||||||||||||||||||||||
Platform levels | 2 | |||||||||||||||||||||||||
Bicycle facilities | Yes | |||||||||||||||||||||||||
Disabled access | Yes | |||||||||||||||||||||||||
History | ||||||||||||||||||||||||||
Opening | 2026 | |||||||||||||||||||||||||
Electrified | Yes | |||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
Location | ||||||||||||||||||||||||||
Tengah Tengah station in Singapore |
It will be the northern terminus of the East Branch of the Jurong Region line, allowing passengers on the East Branch to change trains for Main Branch train services. Trains entering service at this station will terminate at Pandan Reservoir.
History
On 9 May 2018, LTA announced that Tengah station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 1, JRL (West), consisting of 10 stations between Choa Chu Kang, Boon Lay and Tawas, and is expected to be completed in 2026.[4]
Contract J102 for the design and construction of Tengah Station and associated viaducts was awarded to Shanghai Tunnel Engineering Co. (Singapore) Pte Ltd at a sum of S$465.2 million. Construction will start in 2020, with completion in 2026.[5] Contract J102 also includes the design and construction of Choa Chu Kang station and Choa Chu Kang West station, and associated viaducts and A&A works to the existing Choa Chu Kang Station complex.[6]
References
- "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Residents and students welcome Jurong Region Line but find it confusing". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "LTA Awards Civil Contracts to Construct Five Stations for the Jurong Region Line | Press Room | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Tender information | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "A peek into Tengah, the next new HDB town the size of Bishan". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
- "Singapore's Tengah Planning Area". Key Location. Retrieved 2019-09-21.