Kolkata Metro rolling stock
The rolling stock of Kolkata Metro, India consists of seven classes. Five classes for Line 1 and two classes for Line 2.
Part of a series of articles on the |
Kolkata Metro |
---|
Commons |
All trains receive 750 V DC using third rail electrification system. Trains can operate up to eight six cars in length.
Since Kolkata Metro was constructed in 1970s, there were some technical limitations. Due to the tunnel dimensions, and being under Indian Railways, Kolkata Metro opted Indian metre gauge shell (22.7m) with 1676 mm broad gauge tracks. So the options of rake manufacturers for Kolkata Metro Line 1 are very limited. While, the Kolkata Metro Line 2, being modern, uses the 1435 mm Standard Gauge tracks.[1]
Line 1
The Kolkata Metro Line 1 has five classes of trains, out of which four are operational and one is under trial.
ICF/BHEL rake | |
---|---|
In service | 1984–present |
Manufacturer | Bharat Heavy Electricals Limited and Integral Coach Factory |
Designer | Integral Coach Factory |
Assembly | Chennai, India |
Built at | Integral Coach Factory |
Family name | ICF 1000 series |
Entered service | 1984–1988 |
Number built | 9 |
Number in service | 2 |
Number preserved | 1 |
Number scrapped | 6 |
Successor | 3000 series |
Formation | 6 MC + 2 TC |
Design code | Bn |
Capacity | 2,400 passengers |
Operator(s) | Metro Railway, Kolkata |
Depot(s) | Noapara depot, Tollygunge depot and New Garia depot |
Line(s) served | Line 1 |
Specifications | |
Train length | 156 m |
Car length | 19.5 m |
Width | 2.74 m |
Height | 3.7 m |
Doors | Sliding doors |
Maximum speed | 80 kmph |
Power output | 3036 HP |
Acceleration | 1.1 m/s2 |
Deceleration | 1.3 m/s2 |
Power supply | 750 V DC |
Train heating | Non AC, forced ventilation with washed and cooled air |
Electric system(s) | Third rail |
Current collection method | Contact shoe |
Bogies | ICF bogie |
Braking system(s) | Eddy current and electro-pneumatic brakes |
Track gauge | 5 ft 6 in (1,676 mm) Indian gauge |
Seating | Longitudinal facing seats |
ICF/BHEL rake
9 rakes were manufactured by Integral Coach Factory (ICF), Chennai and were passed into service in the first phase when the metro initially ran from Esplanade to Bhawanipur.[2] These trains were dark green in colour and had a yellow stripe at the bottom. Later the colour was changed to white with a dark blue stripe. Presently they are yellow with a wide brown band at the bottom. These rakes are numbed Bn (where n is the rake no.; 1, 2,...., 9)[3][4][5][6]
Operating from | October 1984 – present |
Total fleet size | 9 |
Length per coach | 19.5 m |
Length per train | 156 m |
Width per coach | 2.74 m |
Maximum speed | 55 km/h |
Average operating speed | 30–31 km/h |
Capacity per coach | 300 approx. |
Capacity per train | 2400 approx. |
Total horse power of rake | 3036 HP |
Rake Composition | 6 MC + 2 TC |
ICF/NGEF rake | |
---|---|
In service | 1988–present |
Manufacturer | NGEF and Integral Coach Factory |
Assembly | Chennai |
Family name | ICF 2000 series |
Entered service | 1988–1992 |
Number built | 9 |
Number in service | 7 |
Number scrapped | 2 |
Successor | 3000 series |
Formation | 6 MC + 2 TC |
Design code | 8N |
Capacity | 2,400 passengers |
Operator(s) | Metro Railway, Kolkata |
Depot(s) | Noapara depot, Tollygunge depot and New Garia depot |
Line(s) served | Line 1 |
Specifications | |
Train length | 156 m |
Car length | 19.5 m |
Width | 2.74 m |
Doors | Sliding doors |
Wheel diameter | 860 mm (0.86 m) |
Wheelbase | 2.45 m |
Maximum speed | 80 kmph |
Axle load | 20.32 MT |
Traction motors | 566 kW |
Power output | 5221 HP |
Acceleration | 1.1 m/s2 |
Deceleration | 1.3 m/s2 |
Power supply | 750 V DC |
Train heating | Non AC, forced ventilation with washed and cooled air |
Electric system(s) | Third rail |
Current collection method | Contact shoe |
Bogies | ICF bogie |
Braking system(s) | Eddy current and electro-pneumatic brakes |
Track gauge | 5 ft 6 in (1,676 mm) Indian gauge |
Seating | Longitudinal facing seats |
ICF/NGEF rake
By 1988–90, 9 more rakes manufactured by ICF were procured and put in service when the system expanded. These rakes were tougher and had higher acceleration than the previous ones. The colors of these trains were dark yellow with a maroon stripe at the bottom, later they were repainted in white with a maroon stripe and now they are white with a blue band at the bottom. In 2017–18, these were refurbished and put into service in a phased manner. The rakes are marked with 8N symbols.[7][8][5]
Operating from | February 1995 – present |
Total fleet size | 9 |
Length per coach | 19.5 m |
Length per train | 156 m |
Width per coach | 2.74 m |
Maximum speed | 80 km/h |
Average operating speed | 30–31 km/h |
Capacity per coach | 300 approx. |
Capacity per train | 2400 approx. |
Total horsepower of rake | 5221 HP |
Rake Composition | 6 MC + 2 TC |
ICF/BHEL/Knorr-Bremse rake | |
---|---|
In service | 2010-present |
Manufacturer | Bharat Heavy Electricals Limited, Integral Coach Factory and Knorr-Bremse |
Designer | Integral Coach Factory |
Assembly | Chennai |
Family name | ICF 3000 series |
Number built | 13 |
Number in service | 13 |
Successor | 4000 series |
Design code | Old: ACn/n+1 New: MR-30n |
Capacity | 3,136 passengers |
Operator(s) | Metro Railway, Kolkata |
Depot(s) | Noapara depot, Tollygunge depot and New Garia depot |
Line(s) served | Line 1 |
Specifications | |
Doors | Sliding doors |
Power supply | 750 V DC |
Train heating | Air conditioned |
Electric system(s) | Third rail |
Current collection method | Contact shoe |
Bogies | ICF bogie |
Track gauge | 5 ft 6 in (1,676 mm) Indian gauge |
Seating | Longitudinal facing seats |
ICF/BHEL/Knorr-Bremse rake
These are the first AC trains that were passed into service in 2010, after the elevated corridor from Mahanayak Uttam Kumar to Kavi Nazrul was completed. Later, as the last extension from Kavi Nazrul to Kavi Subhash was finished, more 3000 series rakes were introduced. These trains are manufactured by ICF in collaboration with BHEL and Knorr-Bremse, Germany. They have microprocessor controlled temperature and humidity, LCD displays inside the motorman's cabins and multilingual electronic LED sign boards both inside and outside the train. Presently there are 13 (3000 series) rakes, which are operating on Line 1. These rakes are numbed ACn/n+1 (where (n+1)/2 is the rake number). The rolling stocks numbers are now being changed to MR-30n (where n is the rake no.; 1, 2, 3....13) as they are being gradually repainted to white and violet.[5]
Operating from | October 2010 – present |
Total fleet size | 13 |
Length per coach | 20.3 m |
Length per train | 162.4 m |
Width per coach | 2.74 m |
Maximum speed | 80 km/h |
Average operating speed | 35 km/h |
Capacity per coach | 392 |
Capacity per train | 3136 approx. |
Total horse power of rake | 5449 HP |
Rake Composition | 6 MC + 2 TC |
ICF/MEDHA rake | |
---|---|
In service | 2019-present |
Manufacturer | Integral Coach Factory and Medha Servo Drives Private Limited |
Designer | Integral Coach Factory |
Assembly | Chennai, India |
Family name | ICF 4000 series |
Number built | 10 |
Number in service | 6 |
Formation | 2DTC+4MC+2TC |
Design code | MR-40n |
Capacity | 3,520 passengers |
Line(s) served | Line 1 |
Specifications | |
Car length | 19.5 m |
Width | 2.74 m |
Height | 3.625 m |
Doors | Sliding doors |
Maximum speed | 90 kmph |
Traction motors | 204 kW |
Power output | 3264 HP |
Acceleration | 0.85 m/s2 |
Deceleration | 1.1 m/s2 |
Train heating | Air conditioned |
Current collection method | Contact shoe |
Bogies | ICF bogie |
Braking system(s) | Regenerative braking |
Track gauge | 5 ft 6 in (1,676 mm) Indian gauge |
Seating | Longitudinal facing seats |
ICF/MEDHA rake
2 prototype rakes manufactured by ICF Chennai and Medha and were supplied to Kolkata Metro by September 2017. These state-of-the-art trains will be completely different from existing AC trains made by ICF, BHEL, Knorr-Bremse. These will have 3 phase alternating current motors, regenerative braking, stainless steel body, CCTV cameras (not present in rakes, numbered as MR-401 & MR-402), and better passenger information system. 8 rakes were delivered by January 2020.On April 3, 2019, the first ICF MEDHA rake ran between Noapara and New Garia, after 20 months. Gradually followed by 2 more rakes. After the initial hiccups these trains are praised by passengers for their comfort during braking and acceleration. Metro expressed satisfaction over the performance of the rakes as these rakes are more energy efficient. These rakes are numbed MR-40n (where n is the rake no.; 1, 2, 3....8).[9][10]
Operating from | April 2019 – present |
Total fleet size | 26 |
Length per coach | 19.5 m |
Length per train | 195 m |
Width per coach | 2.74 m |
Maximum speed | 90 km/h |
Average operating speed | 60 km/h |
Capacity per coach | 400 |
Capacity per train | 3120 |
Total horse power of rake | 3264 HP |
Rake Composition | 2 DTC + 4 MC + 2 TC |
CRRC Dalian rake | |
---|---|
The first rake at Noapara depot | |
Manufacturer | China Railway Rolling Stock Corporation |
Assembly | Dalian, China |
Design code | MR-50n |
Operator(s) | Metro Railway, Kolkata |
Line(s) served | Line 1 |
Specifications | |
Car length | 19.5 m |
Width | 2.74 m |
Height | 3.65 m |
Floor height | 1.13 m |
Wheel diameter | 860 mm |
Maximum speed | 80 kmph |
Axle load | 17 tons |
Power supply | 750 V DC |
Train heating | Air conditioned |
Electric system(s) | Third rail |
Current collection method | Contact shoe |
Track gauge | 5 ft 6 in (1,676 mm) Indian gauge |
Seating | Longitudinal facing seats |
Notes | |
Under trial |
CRRC Dalian rake
There was a need to replace non-AC rakes on Line 1 and so during mid 2015 it was announced that Indian Railways for the first time would rope an international train-maker, China Railway Rolling Stock Corporation (CRRC) based in Dalian.[11] As per the tender, 14 new rakes composed of 8 coaches each will be supplied to Kolkata metro by CNR Dalian Locomotive company, a subsidiary of CRRC, which will be running on Line 1. These rakes will be of ultra-modern technology. They will have doors that will be 20 cm wider than any other metro rails in India. They will have wide vestibules, 2.5 feet wider than the existing trains. The design consists of the aerodynamic front with large doors and LED lights, and violet colored stripe on silver color body. These rakes are capable of a top speed of 80 km/h. The first of the 14 rakes from Chinese firm Dalian was slated to arrive by December 2017 but got delayed due to various reasons. The first rake finally arrived in Kolkata on 3 March 2019 on a vessel at Netaji Subhas Dock (NSD).[12] Each of the 8 coaches of the rake weigh nearly 45 tonnes. The rake was unloaded and taken to Noapara carshed after which trial runs and inspection would be carried out before commencing operations. Other 13 rakes are ready, but the shipment got delayed due to the ongoing coronavirus pandemic.These rakes are under performance trials for more than 20 months as serious problems related to performance of the rake were identified during trials. Some of the issues related to insufficient power to climb up the slopes in the tunnels and higher oscillation in the bogie.[13][14]
Operating from | – |
Total fleet size | 14 |
Length per coach | 19.5 m |
Length per train | 195 m |
Width per coach | 2.74 m |
Maximum speed | 80 km/h |
Average operating speed | 65 km/h |
Capacity per coach | 400 |
Capacity per train | 3200 |
Total horse power of rake | – |
Rake Composition |
Line 2
BEML rake | |
---|---|
In service | 2020-present |
Manufacturer | BEML Limited |
Designer | BEML Limited |
Assembly | Bengaluru |
Order no. | KMRCL/RS (3R)/2016 |
Built at | BEML Limited |
Family name | BEML RS (3R) |
Constructed | 2016–2020 |
Entered service | 2020–present |
Number built | 14 |
Number in service | 3 |
Formation | 2 DMC + 2 TC + 2 MC |
Design code | MR-60n |
Fleet numbers | 14 |
Capacity | 2,068 passengers |
Operator(s) | Metro Railway, Kolkata |
Depot(s) | Central Park depot |
Line(s) served | Line 2 |
Specifications | |
Car body construction | Stainless steel |
Train length | 124.8 m |
Car length | 20 m |
Width | 2.88 m |
Height | 3.84 m |
Doors | Sliding doors |
Maximum speed | 95 kmph |
Power supply | 750 V DC |
Train heating | Air conditioned; Roof mounted ventilation |
Current collection method | Contact shoe |
Braking system(s) | Regenerative and pneumatic brakes |
Headlight type | LED based |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Seating | Longitudinal facing seats |
BEML rake
The bidding by the Spanish company CAF for Line 2 was cancelled due to funding related problems. Re-bidding was done and BEML was given the contract for 14 rakes of 6 coaches each at a cost of ₹900 crore. The rakes will be microprocessor controlled with 3 phase AC motors and CBTC system. The rakes were supplied to Kolkata from 2017.[15][16] They are numbered MR-60n (where n is the rake no.; 1, 2, 3....14).[17][18]
Operating from | February 2020 – present |
Total fleet size | 14 |
Length per coach | 20 m |
Length per train | 124.8 m |
Width per coach | 2.88 m |
Maximum speed | 95 km/h |
Average operating speed | 80 km/h |
Capacity per coach | 344 |
Capacity per train | 2068 |
Total horse power of rake | – |
Rake Composition |
MCF/Dawonsys rake
MCF/Dawonsys rake | |
---|---|
Manufacturer | Dawonsys and Modern Coach Factory |
Designer | Dawonsys |
Assembly | Rae Bareli, India and Gimcheon, South Korea |
Constructed | 2019–present |
Line(s) served | Line 2 |
Specifications | |
Car body construction | Aluminium |
Train heating | Air conditioned |
Current collection method | Contact shoe |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Seating | Longitudinal facing seats |
In 2019, Indian Railways approved the manufacturing of 500 aluminium body coaches at the Modern Coach Factory, in Raebareli, Uttar Pradesh, following the Transfer of Technology from Dawonsys. A prototype of 3 coaches (2 MC + 1 TC) will be received by MCF, and the rest will be built here. These will have a top speed of 100 km/h and life span of 40 years.[19][20]
References
- Chakraborty, 1Ajanta; Gupta, Jayanta (February 5, 2020). "8am on Valentine's Day; Your date with East-West Metro". The Times of India. Archived from the original on 2020-02-05. Retrieved 2020-02-10.
- "Salient Data on rolling stock". Archived from the original on 2013-08-06. Retrieved 2013-06-30.
- 「 Archived 2017-09-10 at the Wayback Machine」economictimes February 13, 2020
- "Rolling Stock" (PDF). 2 May 2020.
- "First look: your swank AC Metro". Archived from the original on 2015-06-01. Retrieved 2013-06-30.
- "Metro Railway Kolkata / Indian Railways Portal". 2013-08-06. Archived from the original on 2013-08-06. Retrieved 2020-08-07.
- 「 Archived 2020-01-27 at the Wayback Machine」urbantransportnews February 12, 2020
- "Titagarh Group". 2019-09-29. Archived from the original on 2019-09-29. Retrieved 2020-08-05.
- Kolkata Metro to run trains at every 90 Seconds on North-South Corridor!, retrieved 2019-08-11
- "Kolkata Metro".
- Basak, Probal (20 June 2015). "Modern Chinese rakes for Kolkata Metro". Business Standard India. Retrieved 5 March 2019.
- "Metro rake from China off vessel". www.telegraphindia.com. Archived from the original on 6 March 2019. Retrieved 5 March 2019.
- "印度加尔各答地铁车辆_产品中心_城轨_大连公司". www.crrcgc.cc. Archived from the original on 2019-08-12. Retrieved 2019-08-12.
- Gupta, Jayanta (June 25, 2020). "Kolkata: With Chinese signal system deal off the table, fate of 13 Dalian Metro rakes hangs in balance". The Times of India. Retrieved 2020-09-06.
- "Central PSU wins Rs 900-crore Metro rake order - Times of India". Archived from the original on 2016-01-22. Retrieved 2016-09-25.
- "Tender Award Notice" (PDF).
- "Rail & Metro Product Brochure" (PDF). bemlindia.in. Oct 2019. Archived (PDF) from the original on 11 July 2020. Retrieved 8 Jul 2020.
- "Standard Gauge Metro Car (750V DC)" (PDF). Archived (PDF) from the original on 2019-08-12. Retrieved 2019-08-12.
- "South Korea's Dawonsys To Design Aluminium Coaches For Indian Railways At Rae Bareli Plant". India Infra Hub. 2020-03-17. Retrieved 2020-05-15.
- "Indian Railways eyes world-class shift in trains with 160 kmph aluminium body coaches; exclusive details". The Financial Express. 2020-03-17. Archived from the original on 2020-06-23. Retrieved 2020-05-15.