Mount Emerald Wind Farm
Mount Emerald Wind Farm is a 180 MW wind power station situated on Mount Emerald approximately 8 km WNW of Tolga, and 49 km SW of Cairns, in Queensland, Australia. It consists of 37 Vestas v117-3.45 and 16 Vestas v112-3.3.The project is a joint venture between Port Bajool (land owner) and RATCH-Australia (wind farm developer and operator). RATCH-Australia bought the project from Transfield Services in July 2011.[1]
Mount Emerald Wind Farm | |
---|---|
Country | Australia |
Coordinates | 17°11′S 145°22′E |
Status | Operational |
Construction began | 14 February 2017 |
Construction cost | $400 million |
Owner(s) | |
Operator(s) | RATCH-Australia |
Wind farm | |
Type | Onshore |
Hub height | 90 m (295 ft) |
Rotor diameter | 117 m (384 ft) |
Rated wind speed | 50 km/h (13.9 m/s) |
Site area | 2,422 ha (24 km2) |
Site elevation | 900 m (2,953 ft) |
Power generation | |
Units operational | 53 |
Make and model | 16 Vestas V112 & 37 Vestas V117 |
Nameplate capacity | 180.5 MW |
Annual net output | 500-600 GWh |
External links | |
Website | mtemeraldwindfarm |