Kennedy Energy Park

Kennedy Energy Park is a proposed wind, solar and storage hybrid power station located approximately 20 km south east of Hughenden and 290 km southwest of Townsville in Queensland.

Kennedy Energy Park
Country
  • Australia
Coordinates21°S 145°E
StatusProposed
Construction began2018
Owner(s)Windlab
Solar farm
TypeFlat-panel PV
Wind farm
TypeOnshore
Power generation
Nameplate capacity50 MW
External links
Websitekennedyenergypark.com.au

Stage one of the project is a “proof-of-concept” commenced construction 2018, consisting of 30 MW of wind turbines, 20 MW of single axis tracking Solar Panels, and 2 MW of Li ion battery storage, costing $120 million to build and expected to be operational in 2020.[1]

Stage two is expected to be capable of producing 1200 MW of renewable energy, costing $2 Billion and hoped to commence construction before the end of the decade.[2]

See also