Bombardier Movia CR151

The trains manufactured by Bombardier under Contract R151 (CR151) are the upcoming seventh generation electric multiple unit rolling stock to be introduced on the existing North South and East West lines of Singapore's Mass Rapid Transit (MRT) system. The new rolling stock will replace all of the C151s, C651s and C751Bs, which have been in service for at least 20 years. These new trains are part of the North South and East West lines' core systems upgrade and renewal programme.

Bombardier Movia CR151
In service2022
ManufacturerBombardier Transportation
Built atChangchun Bombardier Railway Vehicles
(Bombardier Transportation and CNR Changchun) Changchun, China[1]
Family nameMovia[2]
ReplacedKawasaki Heavy Industries C151
Siemens C651
Kawasaki Heavy Industries & Nippon Sharyo C751B
Constructed2019 onwards
Entered service2022 onwards
Number built636 vehicles (106 trainsets)
Formation6 per trainset
Fleet numbersTBC
Capacity1920 passengers
Operator(s)SMRT Trains (SMRT Corporation)
Depot(s)Bishan (Future)
Tuas (Future)
Ulu Pandan (Future)
Changi (Future)
East Coast (Future)
Line(s) served NSL  North South Line (Future)
 EWL  East West Line (Future)
Specifications
Doors1,450 mm (57 18 in), 8 per car, 4 per side
Traction systemBombardier MITRAC SiC-VVVF
Electric system(s)750 V DC third rail
Current collection methodCollector shoe
Safety system(s)Current: Thales SelTrac® Moving Block CBTC ATC with subsystems of ATO GOA 3 (DTO), ATP, NetTrac ATS, CBI[3][4]
Track gauge1,435 mm (4 ft 8 12 in) standard gauge

66 six-car high-capacity Bombardier Movia trainsets comprising 396 cars will be delivered from 2021 onwards, entering service from 2022. The design of the trains will be completed in Germany, in coordination with Bombardier's Singapore team. The trains will be manufactured in Bombardier's Changchun facility in China.

With Alstom's agreement to acquire Bombardier's rail business in February 2020,[5] it is not known as to whether there will be any changes in specifications to the CR151 trains.

On 28 September 2020, it was announced that the Land Transport Authority has purchased 40 more R151 trainsets at a cost of S$337.8 million, to replace the 2nd and 3rd generation Siemens C651 and Kawasaki-Nippon Sharyo C751B, which have been in service for 25 years and 20 years respectively. These trains will be deployed from 2024 onwards.[6]

Tender

The tender for trains under the contract R151 was closed on 4 September 2017 with 5 bids. The LTA had shortlisted all of them and the tender results were published.[7]

S/N Name of tenderer Amount ($S) Option 9 (Long Term Service Support)[8]
1 Alstom Transport S.A. / Alstom Transport (S) Pte Ltd Consortium 682,696,431.00 S$626,697,233.00
2 Bombardier (Singapore) Pte Ltd 827,075,921.00 S$269,652,420.94+EUR75,135,67 3.16+GBP2,670,699.27
3 Construcciones y Auxiliar de Ferrocarriles, S.A. 867,275,662.00 S$307,320,742
4 Hyundai Rotem Company 696,960,000.00 S$517,973,000.00
5 Kawasaki Heavy Industries, Ltd. / Kawasaki Heavy Industries(Singapore) Pte Ltd & CRRC Qingdao Sifang Consortium / Singapore CRRC Sifang Railway Vehicles Service Pte. Ltd. Consortium 941,906,324.00 S$1,111,653,342

Design and features

The CR151 trains are the second batch of trains that are not manufactured by Kawasaki and the past consortiums, after the C651 trains which were manufactured by Siemens.

It will feature a new livery of green and red stripes against a white background running around the cars, similar to the C151C. It is also the first train to feature a massive redesign over the other previous rolling stock, including the sixth rolling stock, C151C. That includes a more streamlined body design with a unique headlight placement and also the first batch of trains to come with bright white LED headlights over the conventional fluorescent yellow lights.

The trains also include several unique features, such as condition monitoring sensors and analytic systems to detect faults beforehand as well as an onboard self-test system that checks whether the train is fit for operation. In addition, four trains will also have an automatic track inspection system, consisting of cameras, lasers and sensors, to detect rail defects.

Furthermore, the trains would also have wider areas near the doors to aid the movement of passengers in and out of the train, and tip-up seats that cater to parents with prams, wheelchair users and people with personal mobility devices or foldable bicycles without reducing seat count.[9][10]

The trains will also utilise a Bombardier Mitrac propulsion and control system.[2]

It will be the second train type to feature LTA's new passenger information display, similar to those of the CT251 trains, during manufacturing process in which it will consists of a single, elongated LCD screen displaying the travel information, such as the upcoming stations the train will arrive at, door closing warnings and attractions nearby the station.

On 1 April 2019, Bombardier Transportation and the Land Transport Authority launched a mockup of the interior of the CR151 at the SG Mobility Gallery at LTA's office at Hampshire Road.[11] A poll was conducted to gather public opinion on the features of the train such as the livery, interior colour scheme, the tip-up seats and the Additional Passenger Media Display (APMD).[12]

References

  1. hermes (2018-07-26). "North-South and East-West lines to get 66 new trains". The Straits Times. Retrieved 2018-07-26.
  2. "Bombardier Wins Contract to Provide 396 MOVIA Metro Cars for Singapore's North-South and East-West Lines". Bombardier. 26 July 2018. Retrieved 2018-07-26.
  3. "THALES Urban Rail Signalling Singapore – North-South / East-West Lines" (PDF). Archived (PDF) from the original on 15 June 2020. Retrieved 16 June 2020.
  4. Fang, Joy (2 February 2012). "Coming: $600m upgrade for MRT system/New train measures a 'catch-up'". My Paper. pp. A2, A6. Archived from the original on 18 May 2015. Retrieved 13 May 2015.
  5. "Alstom signs agreement to acquire Bombardier Transportation". Urban Transport News. 17 February 2020.
  6. "40 ageing trains on North-South, East-West MRT lines to be replaced". Channel NewsAsia. 28 September 2020.
  7. "Tender Details CR151".
  8. "Tender information | Land Transport Authority". www.lta.gov.sg. Retrieved 2018-08-01.
  9. "New fleet to replace 66 oldest MRT trains from 2021". Channel NewsAsia. Retrieved 2018-07-25.
  10. hermesauto (2018-07-25). "Bombardier awarded $1.2 billion contract to replace 66 oldest MRT trains". The Straits Times. Retrieved 2018-07-25.
  11. "Virtual experience lets you pick a colour for your train". The Straits Times. Retrieved 2019-04-01.
  12. "Share with us your thoughts on the new trains! :)".
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.