Yenikent Tunnel
Yenikent Tunnel (Turkish: Yenikent Tüneli), is a highway tunnel constructed in Sinop Province, northern Turkey.
Overview | |
---|---|
Location | Gerze, Sinop Province |
Coordinates | 41°44′14″N 35°15′28″E
Yenikent Tunnel |
Status | Operational |
Route | D.010 |
Operation | |
Constructed | Cengiz Construction Company |
Opened | December 14, 2012 |
Operator | General Directorate of Highways |
Traffic | automotive |
Technical | |
Length | 1,598 and 1,530 m (5,243 and 5,020 ft) |
No. of lanes | 2 x 2 |
Operating speed | 80 km/h (50 mph) |
Yenikent Tunnel is part of the Sinop-Samsun Highway D.010 within the Black Sea Coastal Highway, of which construction was carried out by the Turkish Cengiz Construction Company.[1] The 1,598 and 1,530 m (5,243 and 5,020 ft)-long twin-tube tunnel carrying two lanes of traffic in each direction. The Gerze Tunnel follows the Yenikent Tunnel in direction Sinop.
The tunnel was opened to traffic on December 14, 2012 by Turkish Minister of Transport, Maritime and Communication Binali Yıldırım.[2]
References
- "Cengiz İnşaat - Yakakent - Gerze Yolu" (in Turkish). Retrieved 2016-08-16.
- "Sahil Yolu Açıldı". Gerze Gündem Haber (in Turkish). 2012-12-14. Retrieved 2016-08-16.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.