USS Batfish (SSN-681)

USS Batfish (SSN-681), a Sturgeon-class submarine, was the second ship of the United States Navy to be named for the batfish.

USS Batfish (SSN-681) at the end of March 1995 in the western Atlantic Ocean on her way to a six-month Mediterranean Sea deployment as part of the USS Theodore Roosevelt (CVN-71) carrier battle group.
History
United States of America
Name: USS Batfish (SSN-681)
Namesake: The batfish, the name of any of several fishes
Ordered: 25 June 1968
Builder: General Dynamics Electric Boat, Groton, Connecticut
Laid down: 9 February 1970
Launched: 9 October 1971
Sponsored by: Mrs. Arthur R. Gralla
Commissioned: 1 September 1972
Decommissioned: 17 March 1999
Stricken: 17 March 1999
Fate: Scrapping via Ship and Submarine Recycling Program completed 22 November 2002
Badge:
General characteristics
Class and type: Sturgeon-class submarine
Displacement:
  • 4,195 long tons (4,262 t) light
  • 4,501 long tons (4,573 t) full
  • 306 long tons (311 t) dead
Length: 302 ft 3 in (92.13 m)
Beam: 31 ft 8 in (9.65 m)
Draft: 28 ft 8 in (8.74 m)
Installed power: 15,000 shaft horsepower (11.2 megawatts)
Propulsion: One S5W nuclear reactor with S3G3 modified core, two steam turbines, one screw
Speed:
  • 15 knots (28 km/h; 17 mph) surfaced
  • 25 knots (46 km/h; 29 mph) submerged
Test depth: 1,300 feet (396 meters)
Complement: 112 (14 officers, 98 enlisted men)
Armament: 4 × 21-inch (533 mm) torpedo tubes

Construction and commissioning

The contract to build Batfish was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 25 June 1968 and her keel was laid down there on 9 February 1970. She was launched on 9 October 1971, sponsored by Mrs. Arthur R. Gralla, and commissioned on 1 September 1972 with Commander Richard E. Enkeboll in command.

Service history

1972-1978

After commissioning, Batfish was assigned Naval Station Charleston at Charleston, South Carolina, as her home port.

On 22 January 1973 Batfish ran hard aground at Charleston while proceeding to sea. She was pulled free by tugs and returned to port where extensive damage to her bottom was repaired.

Operation Evening Star, 1978

On 2 March 1978, Batfish, commanded by Commander (later Rear Admiral) Thomas Evans, left Charleston on what would transpire to be a remarkable 77-day patrol known as "Operation Evening Star". On 17 March 1978, Batfish detected a Soviet Navy Yankee I-class ballistic missile submarine in the Norwegian Sea some 200 nautical miles (370 km) above the Arctic Circle.[1] Batfish began trailing the boat, collecting valuable information on how the Soviet Navy operated. During the next 50 days, the Yankee I never detected Batfish. Batfish only lost contact with the boat twice, the first time during a bad storm, and the second time when a fishing fleet passed overhead. Both times, Batfish quickly reacquired the Soviet submarine.[1]

The Soviets remained unaware that their submarine had been followed by any vessel until U.S. Navy Chief Warrant Officer John Anthony Walker reported the incident to them while he was spying in the 1980s.[1] Walker pleaded guilty to espionage in 1985.

1978-1999

Batfish conducted a deployment in the Mediterranean Sea with the United States Sixth Fleet from February to August 1992.

In September 1994 Batfish was transferred from her homeport in Charleston, SC to Naval Submarine Base New London at Groton, CT, which remained her home port for the rest of her operational life.

Batfish conducted a deployment in the Mediterranean Sea with the Sixth Fleet as part of the USS Theodore Roosevelt (CVN-71) carrier battle group from March to September 1995. Batfish conducted a deployment in 1996, transiting through the Panama canal and into the Pacific for a 4-week excursion in the Southern hemisphere and Central Pacific.

Final disposition

Batfish was decommissioned on 17 March 1999 and stricken from the Naval Vessel Register the same day. Her scrapping via the Nuclear-Powered Ship and Submarine Recycling Program at Puget Sound Naval Shipyard in Bremerton, Washington, was completed on 22 November 2002.

Notes

  1. Jelinek, Pauline (1 March 2001). "Sub Crew Tells of Cold War Mission". Associated Press. Archived from the original on 24 September 2015. Retrieved 14 June 2015 via HighBeam Research.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.