Secunderabad–Bolarum route
The Secunderabad–Bolarum (abbr. SB) is a suburban rail service of the Multi-Modal Transport System of Hyderabad, India.[1] Spanning 11 stations, it runs between Secunderabad and Bolarum 5 times a day.[2]
Secunderabad–Bolarum route | |||
---|---|---|---|
(SC-Medchal) DHMU at Alwal Railway Station | |||
Overview | |||
Owner | Government of Telangana Indian Railways | ||
Termini | Secunderabad Bolarum | ||
Stations | 11 | ||
Service | |||
Type | Rapid transit | ||
System | Hyderabad Multi-Modal Transport System | ||
Operator(s) | South Central Railway | ||
History | |||
Opened | 2003 | ||
Technical | |||
Number of tracks | 2 | ||
Character | Surface | ||
Track gauge | 1,676 mm (5 ft 6 in) Broad Gauge | ||
Electrification | Secundrabad to Safilguda 25 kV 50 Hz AC current, rest under electrification | ||
|
History
The Secunderabad–Bolarum route is one of the oldest suburban rail in the city of Hyderabad, established by Nizam's Guaranteed State Railway. Initially, it was a metre-gauge track but was later converted into broad-gauge.[2]
Stations
Station | Available transfers |
---|---|
Secunderabad | |
Lallaguda | |
Malkajgiri | |
Dayanandnagar | |
Safillguda | |
Ramakrishnapuram | |
Ammuguda | |
Cavalry Barracks | |
Alwal | |
Bolarum Bazar | |
Bolarum |
MMTS route
Secunderabad–Bolarum route is scheduled to take off as a part of the phase 2 of the Hyderabad Multi-Modal Transport System in December 2018., however was delayed due to paucity of funds.[3][4] The work of the section is nearing to completion in February 2020.[5]
Electrification
Railway electrification system of the 13 km long route was completed in 2018 by South Central Railway.[6]
Image gallery
- Bodhan-MBNR Passenger with WDM3A loco at Alwal Railway Station
- NZB-Kacheguda Passenger with WDG-3A loco at Malkajgiri Railway Station
- (Manoharabad-SC) DHMU at Malkajgiri Railway Station
- (SC-Medchal) Local and Freight train at Bolarum Railway Station
References
- India, The Hans (16 June 2018). "Better train services on Bolarum-Secunderabad route sought". www.thehansindia.com. Retrieved 28 August 2020.
- Geetanath, V. (2 March 2020). "Suburban train service dwindles to a trickle". The Hindu. ISSN 0971-751X. Retrieved 28 August 2020.
- "Secunderabad residents want MMTS trains works to be expedited". The New Indian Express. Retrieved 28 August 2020.
- Geetanath, V. (17 June 2019). "MMTS Phase-II riddled with hurdles". The Hindu. ISSN 0971-751X. Retrieved 28 August 2020.
- "Long-pending allocation of Rs 40 crore for MMTS Phase II comes through". The New Indian Express. Retrieved 28 August 2020.
- Baski, AuthorSunny. "SCR to electrify all routes in Telangana". Telangana Today. Retrieved 28 August 2020.