Saudi Landbridge Project
The Saudi Landbridge Project is a planned railway project which forms part of the Saudi Railways Expansion Programme.[1]
SRO Saudi Landbridge Project | |||
---|---|---|---|
Overview | |||
Status | Planned | ||
Owner | Saudi Railways Organization (SRO) | ||
Termini | Jeddah Riyadh | ||
Service | |||
Operator(s) | Saudi Railways Organization (SRO) | ||
Technical | |||
Track length | Jeddah-Riyadh; 950 kilometres (590.3 mi) and Jubail-Dammam; 115 kilometres (71.5 mi) | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
|
Intended mainly for freight,[2] the railway will connect Jeddah on the Red Sea coast with the Saudi Arabian capital Riyadh.[3] The existing 450 km line between Riyadh and Dammam will be upgraded,[4] and a second 115 km new line is planned to connect Dammam with Jubail on the Persian Gulf.[3][2] The newly constructed lines will be single track, but the infrastructure (including bridges and tunnels) will be designed to permit a future upgrade to dual track.[4] The project is part of the Saudi vision 2030 that aims at being a logistic hub that connects the three contracts together.[5]
History
On 21 April 2008 the Tarabot consortium of seven Saudi companies and Asciano of Australia, was named as preferred bidder for the 50-year build, own the concession for the Landbridge project, with financial close planned within 12 months.[6]
Completion was planned for 2010,[7] however financial close could not be agreed.[8]
On 10 October 2011 the government decided the project would go ahead, but as a state project.[2] The cost was put at up to USD 7 billion.[2]
In July 2013, the contract for the design of the 958-kilometre Jeddah-Riyadh section of the project was awarded. The Saudi Public Investment Fund (PIF) awarded the contract to prepare the detailed design of the project to Italferr in August 2015. At the Middle East Rail 2017 conference and exhibition in Dubai on 7 March 2017, SRO President Rumaih Al Rumaih announced that the detailed design for the project had been completed.[9] The project will be developed on a build, operate and transfer (BOT) basis.[10]
See also
- Haramain high-speed rail
- Gulf Railway
External links
References
- "BAFOs Submitted for Saudi Landbridge Project". Infranews. 2008-02-28. Archived from the original on 2013-01-26. Retrieved 2008-02-28.
- "Saudi Landbridge to go ahead as state project". Railway Gazette International. 2011-10-11.
- Saudi Landbridge Project Archived 2008-01-13 at the Wayback Machine. Retrieved 2008-01-09.
- "Saudi Landbridge Rail Project". Ashurst. August 2005. Retrieved 2008-01-09.
- "Saudi, Chinese officials meet at Belt and Road Forum in Beijing". Arab News. 2019-04-26. Retrieved 2019-05-01.
- "Saudi Landbridge preferred bidder named". Railway Gazette International. 2008-04-21.
- Christian Wolmar (August 2005). "The groundbreaking Saudi rail-link". Retrieved 2008-01-09.
- "Saudi Landbridge PFI to be reviewed". Railway Gazette International. 2009-07-08.
- "Saudi completes design of railway project linking two coasts | Zawya MENA Edition". Zawya. Retrieved 8 March 2017.
- http://www.gdnonline.com/Details/193397