Sanyang Road station

Sanyang Road Station (simplified Chinese: 三阳路; traditional Chinese: 三陽路; pinyin: sān yáng lù) serves as an interchange station of Line 1 and Line 7 of Wuhan Metro. The elevated station entered revenue service along with the completion of Line 1, Phase 1 on July 28, 2004, and the underground station entered service on October 1, 2018 with the opening of Line 7.[2]

Sanyang Road

三阳路
Line 7 platforms at Sanyang Road station
LocationJiang'an District, Wuhan, Hubei
China
Coordinates30°35′52″N 114°18′06″E
Operated byWuhan Metro Co., Ltd
Line(s)
Platforms4 (4 side platforms)
History
OpenedJuly 28, 2004
Services
Preceding station   Wuhan Metro   Following station
toward Jinghe
Line 1
toward Hankou North
Line 7

Station layout

3F
Side platform, doors open on the right
Westbound      Line 1 towards Jinghe (Dazhi Road)
Eastbound      Line 1 towards Hankou North (Huangpu Road)
Side platform, doors open on the right
2F Concourse Faregates, Station Agent
G Entrances and Exits Exits A-H, J-L
B1 Concourse Faregates, Station Agent
B2
Side platform, doors open on the right
Northbound      Line 7 towards Garden Expo North (Xianggang Road)
Southbound      Line 7 towards Qinglongshan Ditiexiaozhen (Xujiapeng)
Side platform, doors open on the right
B3 Transfer Passage

Facilities

Sanyang Road Station for Line 1 is a two-story elevated station placed along Jinghan Avenue. The station has two side platforms accommodating a pair of tracks, and is equipped with attended customer service concierges, automatic ticket vending machines, and accessible ramps. The underground Line 7 station has a two side platforms and is connected to the elevated portion with two pairs of escalators, and a connecting bridge over the Sanyang Road intersection on both sides of the Jinghan Avenue.

Exits

There are sixteen exits in service:

  • Exit A: Northwestern side of Jinghan Avenue.
  • Exit B: Southeastern side of Jinghan Avenue.
  • Exit C1
  • Exit C2
  • Exit D
  • Exit E
  • Exit F
  • Exit G
  • Exit H
  • Exit J
  • Exit K1
  • Exit K2
  • Exit L1
  • Exit L2
  • Exit L3
  • Exit L4

Transfers

Bus transfers to Route 502, 534, 559, 581, 598, 608, 622, 711 and 801 are available at Sanyang Road Station.[3]

References

  1. "武汉地铁7号线一期年内开建 预计2017年建成". 荆楚报. 09/03/2013. Retrieved 18 December 2013. Check date values in: |date= (help)
  2. "武汉轻轨开通9周年 客流量为开通初期近10倍". 武汉交通运输委员会. Archived from the original on 19 December 2013. Retrieved 18 December 2013.
  3. "武汉公交查询". Retrieved 18 December 2013.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.