SC-Stadion

The SC-Stadion is an under-construction football stadium in Freiburg, Germany. It will primarily serve as the new home stadium of SC Freiburg, replacing the club's former home, the Schwarzwald-Stadion. It is located in a part of the city called Brühl, near the airport.[1]

SC-Stadion
SC-Stadion from outside in September 2020 with training pitches in foreground
LocationFreiburg im Breisgau, Germany
Coordinates48°01′18″N 7°49′48″E
OwnerCity of Freiburg
Capacity34,700
SurfaceGrass
Construction
Broke groundNovember 2018
Opened2021 (expected)
ArchitectHPP Architekten
Tenants
SC Freiburg

Stadium characteristics

According to the building plans made by Düsseldorf-based architect group, 'HPP Architekten', the stadium will have continuous upper and lower tiers, with the home stand behind the goal on the south side. The plans say it will have a capacity of 34,700 seats, 36% (around 12,400) of them being standing only.[1] The stadium is 25 metres high and is rectangular. In addition to the offices, function rooms for the first team and the U23s will be integrated.[1]

History

The stadium used by SC Freiburg up until now, the Dreisamstadion, opened in 1954, no longer meets the requirements of a modern stadium due to a pitch that is too small (100.5 m × 68 m), and also a gradient of 98 cm from the goal in the south to the goal in the north towards the Dreisam. It is only allowed to be continuously used because of a special permit issued by the DFL.[2] For some time now, there have been discussions about a rebuilding of the stadium or a new construction. In order to examine the economic viability of converting the Dreisamstadion, the club commissioned a study from Freyler, according to which a conversion would take eleven years and cost only slightly less than a new building.

The Freiburg local councils ordered an assessment report from the auditing company Ernst & Young in the spring of 2012. The report described a conversion time of only three years but calculated far superior costs. According to the report, there was no viable solution on the old site. This led to the assessment and comparison of further locations.[3] In December 2012, the Freiburg city council voted in favour of the construction of a new stadium and confirmed the assessment of three possible locations.[4] The joint task force of club and city agreed on the Wolfswinkel location next to the airfield and the university engineering faculty building in the district of Brühl. The advantages of the site are the good transport connections and the possibility to set up training grounds in the surrounding area. With the exception of 200 m² which belong to the university, the site belongs to the city. The Hettlinger allotment gardens near the Messe in the western part of Freiburg and the Hirschmatten plot of land near the motorway feeder road, which had been taken into consideration as possible alternative construction sites for the stadium, were deemed less suitable in a decision by the Freiburg city council on 25 January 2014.[5][6]

On 1 February 2015 the residents of Freiburg voted in favour of the construction of the new stadium in Wolkswinkel with 58.2 percent of the votes.[7] The budget amounts to €76 million.[1] The club obtained the building permit for the construction of a new stadium on the Wolfswinkel site on 16 November 2018. The same month, preparatory construction work started.[8]

The stadium was initially scheduled to be completed in August 2020 with the beginning of the 2020/21 season.[1] In April 2020 SC CFO Oliver Leki disclosed in an interview with “Der Kicker”, a German sports magazine, that this original date would not be met due to the effects of the Covid-19 pandemic. That is the reason why the Dreisamstadion was specified as a venue in addition to the SC-Stadion for club licensing in the 2020/21 season.[9] In July 2020 it was publicly announced that the stadium would probably not be ready until the end of 2020 and that the Sport-Club could possibly move to the new stadium after the winter break.[10] The start of the 2020/21 season had been postponed by one month as well, to September 2020.  

At the end of 2019, the foot and bike path bridge over the new access road to the stadium (Suwonallee) on Granadaallee was opened. The remaining construction work is going according to schedule, but there is no time buffer anymore.[11][12]

The construction of the roof structure began in early 2020. To ensure that everyday traffic would not be disturbed, all of the roof elements were transported to Freiburg at night by heavy load transport. On 5 March 2020 the topping out ceremony was held on the site. The SC team then made a quick tour of the construction site.[13]  

In the beginning of autumn in 2020, construction work was completed after about 18 months. On 2 October, the most important access road – Suwonallee (named after the South Korean twin town Suwon) – was opened to traffic. The road runs between the stadium’s training area and the landing strip of the adjoining airport. It connects Madisonallee and Granadaallee.[14]

Furthermore, the works include foot and bike paths, a boulevard leading to the stadium, a parking space for bikes and cars, as well as a large bus station. The previously completed road surrounding the stadium is named after the long-time club president, Achim Stocker (1935-2009). It currently serves as an access road for the adjacent university construction works. It is to be officially opened to the public at a later stage.[15] The stadium's turf was rolled out on 25 November 2020.[16][17]

Panorama Photograph

Building site of the stadium as of 2020-09-07

In May 2019, the administrative court of Freiburg had rejected an appeal for construction to stop, in summary proceedings brought up by five women and one man (represented by a Karlsruhe law firm), who live between around 430 and 740 meters from the westernmost edge of the stadium.[18][19] The six plaintiffs had filed an appeal against this decision in June.[20] The Freiburg glider pilots, on the other hand, withdrew their complaint against the stadium because they received a new grass runway in 2019.[21]

On 2 October 2019, the administrative court of Baden-Württemberg ruled that comparatively high noise protection standards must be met for the use of the stadium. This means that no match is allowed to last longer than 8 p.m. throughout the week and, in addition, no match may be played between 1 p.m. and 3 p.m. on Sundays. Different rules apply to non-sporting events.[22] The ruling received attention nationwide and in the United Kingdom.[23] A few hours after the ruling was published on 23 October 2019, it became known that the court had based the ruling on outdated noise limits, that had been valid only until the year of 2017.[24]

On 20 May 2020, the administrative court fully granted the complaint issued by the state of Baden-Württemberg seeking remedy for a violation of the right to be heard. The complaint concerned the admission of matches in the new SC-Stadium. Thus, the decision from 23 October 2019 was rendered invalid and the issue will be discussed anew.[25] In mid-September 2020 the administrative court ruled in summary proceedings that Bundesliga matches may not take place after 8 p.m. as well as not between 1 and 3 p.m. on Sundays. If the sports club were to make it to the Europa or Champions League, it would be allowed to play at night however, since the matches would be considered "rare events" for which different conditions apply. The same applies to matches of the DFB-Pokal. Even though the main proceedings are still to be held, SC-Freiburg proceeds on the assumption that with the current limits in force they can use the ground without restrictions.[26]

Ownership and Financing

The stadium's proprietor is the "Stadion Freiburg Objektträger GmbH & Co. KG" whose shares are 100% holdings of the city of Freiburg. The city rendered the property as a contribution in kind to the company. The SC Freiburg as an atypical silent partner rendered a capital contribution of at least 15 million euros, which will be raised by one million euros with each year they spend in the Bundesliga with a limit of 20 million euros. As a third participator, the silent partnership of the state-owned brewery Rothaus which was established at the Freiburg Trade Fair was set to result in a contribution of 12.78 million euros. The Ministry of education, youth and sports of the state of Baden-Württemberg subsidized the stadium with an amount of 16.2 million euros.[27] The remaining 32.7 million euros were to be financed externally through loans. In July 2018, it became public that Rothaus would back out of the financing and that the SC Freiburg would cover their share and finance it with a loan.[28]

After completing the construction, the corporation will lease the stadium to the SC Freiburg who will pay an annual lease up to 3.8 million euros in the Bundesliga and an annual lease up to 2.8 million euros in the 2. Bundesliga.[29][30]

Compensatory measures

Measures were taken to compensate the space lost due to the construction of the arena, the areas constructed for traffic, and the training facilities. This includes a 70 hectare wide area for which the city pays around 10 million euros. About 10 hectare of calcareous grasland were lost because of the construction. Due to its high valency, the compensating area has to be 16 hectare. The following places were chosen for this compensation: 8 hectare at the former waste disposal site Eichelbuck, 5.3 hectare at the airfield Bremgarten, 1.5 hectare at the Tuniberg, and 1.2 hectare at the northern airfield. Planning these measures had already started partially when the referendum of 2015 took place. In July 2019, 4 hectare of calcareous grassland had already been established at the Eichelbuck. This measure is planned to be finished by 2021. Pieces of turf and seeds have been extracted from their former biotopes at the stadium site and were brought to the Eichelbuck and replanted there, so that the typical flora and fauna could resettle at the compensatory site. An investigation in 2018 showed that just a few months after the resettlement, the flora and fauna at the Eichelbuck started to show great similarities to the biotopes at the airfield.

In order to maintain this success, amongst other things, the grass needs to be mowed several times in the summer. The compensatory measures at the northern airfield and the airfield Bremgarten have already been completed. Parts of the former taxiway at the airfield Bremgarten have been removed.[31]

Extensive grazing with cattle on a meadow near the renatured Elz river close to Köndringen is another measure which, at the same time, enhances the meadow for jackdaws.

Connection to the airfield

In the future, larger aircraft will be able to land at the neighboring airfield. The operator is already working on getting an official approval. For this reason, a new fire engine has been purchased by the airfield's operators. If approval is given, the visiting teams' aircraft could land next to the stadium.[32]

See also

References

  1. "Das ist das neue SC-Stadion". SCFreiburg.com. 31 August 2017. Retrieved 16 December 2020.
  2. Wiehle, T.; Dörr, P. (16 August 2013). "Der schiefe Platz von Freiburg". BILD.de. Retrieved 16 December 2020.
  3. Röderer, Joachim (14 November 2012). "Umbau des SC-Stadions vom Tisch – Standortsuche für neue Arena beginnt". Badische Zeitung. Retrieved 16 December 2020.
  4. Röderer, Joachim (11 December 2012). "Klare Ratsmehrheit stimmt für Neubau des SC-Stadions". Badische Zeitung. Retrieved 16 December 2020.
  5. Röderer, Joachim (22 April 2013). "Stadt und SC setzen auf den "Wolfswinkel" – Baubeginn 2016?". Badische Zeitung. Retrieved 16 December 2020.
  6. Mauch, Uwe (25 February 2014). "Gemeinderat beschließt Detailanalyse des Wolfswinkels". Badische Zeitung. Retrieved 16 December 2020.
  7. "Ergebnis Bürgerentscheid 2015". Freiburg.de. Retrieved 16 December 2020.
  8. Röderer, Joachim (30 December 2018). "Ab Februar 2019 beginnt der Rohbau des neuen SC-Stadions am Flugplatz". Badische Zeitung. Retrieved 16 December 2020.
  9. Schröter-Lorenz, Carsten (11 April 2020). "Freiburger Stadionbau verzögert sich". Kicker.de. Retrieved 16 December 2020.
  10. Röderer, Joachim (17 July 2020). "Das neue SC-Stadion wird wohl erst im Dezember fertiggestellt". Badische Zeitung. Retrieved 16 December 2020.
  11. Röderer, Joachim (13 December 2019). "Für Radfahrer und Fußgänger: Brücke beim neuen Stadion ist eröffnet". Badische Zeitung. Retrieved 16 December 2020.
  12. Röderer, Joachim; Kech, Florian (12 February 2020). "Zeitplan für das neue SC-Stadion bleibt sehr sportlich". Badische Zeitung. Retrieved 16 December 2020.
  13. "Neues SC-Stadion: Erschließungsarbeiten auf dem Stadionareal und Stadionbau selbst schreiten planmäßig voran". Freiburg.de. 12 February 2020. Retrieved 16 December 2020.
  14. Röderer, Joachim (1 October 2020). "Die Suwonallee am neuen Stadion wird am Freitag für den Verkehr frei gegeben". Badische Zeitung. Retrieved 16 December 2020.
  15. "Erschließungsarbeiten für SC-Stadion abgeschlossen". Stadionwelt. 6 October 2020. Retrieved 16 December 2020.
  16. "Das neue SC-Stadion bekommt seinen Rasen". Badische Zeitung. 27 November 2020. Retrieved 16 December 2020.
  17. BZ-Redaktion (26 November 2020). "Das neue Stadion des SC Freiburg bekommt seinen Rasen". Badische Zeitung. Retrieved 16 December 2020.
  18. Mauch, Uwe; Kübler, René (17 September 2020). "Die wichtigsten Fragen und Antworten zum Abendspiel-Verbot im neuen Stadion". Badische Zeitung. Retrieved 16 December 2020.
  19. Röderer, Joachim (16 May 2019). "Eilantrag abgelehnt: Kein Baustopp für neues SC-Station". Badische Zeitung. Retrieved 16 December 2020.
  20. Röderer, Joachim (6 June 2019). "SC-Stadion: Anwohner legen Beschwerde gegen abgelehnten Eilantrag ein". Badische Zeitung. Retrieved 16 December 2020.
  21. BZ-Redaktion (19 March 2019). "Die Graslandebahn auf dem Freiburger Flugplatz ist eröffnet". Badische Zeitung. Retrieved 16 December 2020.
  22. "Lärmschutz: Freiburg darf neues Stadion nach 20 Uhr nicht nutzen". Kicker.de. 23 October 2019. Retrieved 16 December 2020.
  23. Röderer, Joachim (26 October 2019). "STIMMEN". Badische Zeitung. Retrieved 16 December 2020.
  24. "Wirbel um neues Freiburger Stadion: SC kann hoffen". Kicker.de. 23 October 2019. Retrieved 16 December 2020.
  25. "Anhörungsrüge zur Entscheidung des Verwaltungsgerichtshofs (VGH) zum neuen SC-Stadion erfolgreich". Freiburg im Breisgau. 20 May 2020. Retrieved 16 December 2020.
  26. Mauch, Uwe; Vögtle, Fabian (15 September 2020). "SC Freiburg und Behörden von neuem Abendspiel-Entscheid zum Stadion kalt erwischt". Badische Zeitung. Retrieved 16 December 2020.
  27. Röderer, Joachim (1 August 2018). "Neues Freiburger Stadion kostet 131 Millionen Euro". Südkurier. Retrieved 16 December 2020.
  28. Vrastil, Tim (9 July 2018). "SC Freiburg: Brauerei steigt aus Stadionplänen aus". 90min.de. Retrieved 16 December 2020.
  29. "Nächster Schritt zum neuen Stadion". SC Freiburg. 18 January 2016. Retrieved 16 December 2020.
  30. "Stille Beteiligung der Staatsbrauerei Rothaus an der OTG SC-Stadion". Freiburg im Breisgau. 8 December 2014. Retrieved 16 December 2020.
  31. "Innovative Ausgleichsmaßnahmen für das SC-Stadion in Freiburg: Magerrasen auf der Deponie Eichelbuck - Erste Ergebnisse des Monitorings sind positiv". RegioTrends. 11 July 2019. Retrieved 16 December 2020.
  32. "SC-Stadion feiert Richtfest". Stadionwelt. 6 March 2020. Retrieved 16 December 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.