Rize–Artvin Airport
Rize–Artvin Airport (Turkish: Rize–Artvin Havalimanı) is an airport under construction on reclaimed land from the sea off the coast of in Rize Province, northeastern Turkey.
Rize–Artvin Airport Rize–Artvin Havalimanı | |
---|---|
Summary | |
Airport type | Public |
Serves | Rize and Artvin |
Location | Yeşilköy, Pazar, Rize, Turkey |
Coordinates | 41°10′09″N 40°49′44″E |
Map | |
Rize–Artvin Airport Location of airport in Turkey |
The airport is situated off the coast of Yeşilköy village in Pazar district of Rize Province.[1][2] It is 34 km (21 mi) east of Rize and about 75 km (47 mi) west of Artvin.[3] It is being constructed on ground obtained through filling a part of the Black Sea shore by rocks brought from nearby quarries in Merdivenli, Hisarlı, Kanlımezra and Kuzeyca. To fill the up to 30 m (98 ft)-deep sea,[3] at least 85 million tons of rock is required.[1][2][4] The airport building will cover an area of 4,500 m2 (48,000 sq ft), and the runway will 3,000 m (9,800 ft) long at 45 m (148 ft) width parallel to seashore.[2][5] The construction works began with groundbreaking in 2017. It will be the country's second airport of its sort following Ordu–Giresun Airport.[2][3][5][6] It is expected that the airport will go into service in 2021,[4] and will serve about two million passengers annually. The construction cost is budgeted to ₺ 750 million (approx. US$206 million).[5]
References
- "Rize- Artvin havalimanı için taşocağı açılmasına tepki eylemi". Hürriyet (in Turkish). 2017-07-11. Retrieved 2017-09-20.
- "Rize-Artvin Havalimanı için ilk kazma vuruldu". CNN Türk (in Turkish). 2017-02-24. Retrieved 2017-09-20.
- "Rize-Artvin airport in northeastern Turkey to be built at sea". Daily Sabah. 2016-06-13. Retrieved 2017-09-20.
- "Rize-Artvin Havalimanı Dolgu Çalışmaları". Milliyet (in Turkish). 2017-07-11. Retrieved 2017-09-20.
- "Erdoğan,Rize-Artvin Havalimanı dolgu sahasını inceledi". Sabah (in Turkish). 2017-08-06. Retrieved 2017-09-20.
- "Groundbreaking for Turkey's second airport on sea to be completed by April: Minister". Hürriyet Daily News. 2017-01-15. Retrieved 2017-09-20.