Penang Sentral
Penang Sentral is an intermodal transit-oriented development in Butterworth, Penang, Malaysia. Proposed as the main transportation hub for the State of Penang, and by extension, Greater Penang, the first phase of the Penang Sentral project opened on 22 November 2018.[1]
Transit-oriented development hub and Intermodal passenger transport station | |
Other names | 檳城中環車站 (Traditional Chinese) 槟城中环车站 (Simplified Chinese) பினாங்கு மத்திய போக்குவரத்து நிலையம் (Tamil) |
Location | Bagan Dalam, Butterworth, Penang, Malaysia. |
Owned by | Main building: MRCB Butterworth station : KTMB Ferry Terminal : Prasarana |
Connections | Access to Sultan Abdul Halim Ferry Terminal and Butterworth railway station through footbridge |
Construction | |
Structure type | Subsurface |
Parking | Available with payment |
Disabled access | Yes |
Other information | |
Website | www |
History | |
Opened | 22 November 2018 |
Services | |
Rapid Penang Intercity buses Taxis |
Modeled after KL Sentral in Kuala Lumpur, the first phase of Penang Sentral will serve as the terminal for both public and intercity buses, and is physically connected to the adjacent Butterworth railway station and the Penang Ferry terminal. The project will eventually comprise an integrated terminal for all bus, rail and sea transportation services within Penang. Future phases of the project also include commercial, retail and residential developments.[2][3]
History
Touted as the gateway to northern Malaysia by its developers, the Penang Sentral project was announced by the then Malaysian Prime Minister, Abdullah Badawi in 2007.[4] The project, covering a 12.8 hectare site in the heart of Butterworth, was to be jointly undertaken by Malaysian Resources Corporation Berhad (MRCB) and Perlaburan Hartanah Bumiputera Berhad.[5][6]
Veritas Architects was put in charge of the design works of the proposed transit-oriented development, while the construction of Phase 1 was allocated to a subsidiary of MRCB, Penang Sentral Sdn Bhd.[7][8] Penang Sentral was modeled after KL Sentral, which also incorporated commercial and residential elements.[9] The entire project was divided into eight phases, of which the second, third and fourth phases comprised a shopping complex, three office blocks and a 36-storey hotel respectively.[1]
However, since its launch in 2007, the Penang Sentral project has suffered repeated delays. Land acquisition became the main stumbling block, as the parcels of land earmarked for the development were owned by several parties, namely the Malaysian federal government, the Penang state government, highway concessionaires and Keretapi Tanah Melayu, the national railway operator.[1][10] As a result, construction of Phase 1 of Penang Sentral only began in earnest in 2015.
Station layout
1 Bus platform |
Driveway | ||
← Rapid Penang Island platform Intercity bus→ | |||
Driveway | |||
2 | Concourse Level | Non-integrated Connections to and , Customer Service Counter, Ticket Vending Machine, Convenience Store and Taxi Stand | |
3 | Convenience Store, parking |
Gallery
- Penang Sentral's Rapid Penang bus platform is located at the 1 floor of the plaza.
- Penang Sentral bus Passenger information display system indicates the departure time of each intercity bus route.
- Bus ticketing counter at 2 floor
- Temporary footway to Butterworth railway station from Penang Sentral 2 floor
- The under construction Penang Sentral
References
- "First phase of Penang Sentral to be ready this year". www.thesundaily.my. Retrieved 2017-04-10.
- "MRCB". mrcbland.com.my. Archived from the original on 2017-03-03. Retrieved 2017-04-10.
- "VERITAS - Penang Sentral". theveritasdesigngroup.com. Retrieved 2017-04-10.
- Think Property: Construction Work On Penang Sentral To Start Next Month
- "Penang Sentral to take shape - Community | The Star Online". www.thestar.com.my. Retrieved 2017-04-10.
- "Work on Penang Sentral project to start next year". The Star. 2008-07-20. Retrieved 2008-07-21.
- Veritas Architects website
- "Penang Sentral New Temporary Terminal to Replace Ageing Temporary Terminal – Improvements in Phases" (PDF). Penang Sentral.
- The Star: "Penang Sentral to take shape" By Yeng Ai Chun
- "Phase one of RM2bil Penang Sentral project can't be ready by July 2011 - Community | The Star Online". www.thestar.com.my. Retrieved 2017-04-10.