Northgate Transit Center
Northgate Transit Center is a bus station and future light rail station in the Northgate neighborhood of Seattle, Washington. The transit center, located adjacent to the Northgate Mall, has six bus bays and parking for 284 vehicles.
Northgate Transit Center | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
View of bus station and future rail station in 2019 | |||||||||||||||||||||
Location | 10200 1st Avenue Northeast Seattle, Washington United States | ||||||||||||||||||||
Coordinates | 47°42′11″N 122°19′41″W | ||||||||||||||||||||
Train operators | Sound Transit (planned) | ||||||||||||||||||||
Bus routes | 14 | ||||||||||||||||||||
Bus stands | 6 | ||||||||||||||||||||
Bus operators | King County Metro Sound Transit Express | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Parking | 284 parking spaces | ||||||||||||||||||||
Bicycle facilities | Bicycle lockers and racks | ||||||||||||||||||||
Disabled access | Yes | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | June 6, 1992 | ||||||||||||||||||||
Rebuilt | 2021 (planned) | ||||||||||||||||||||
Services | |||||||||||||||||||||
|
Upon the completion of the Northgate Link Extension project in 2021, it will become the northern terminus of the Link Light Rail system. It is also proposed as a major bus rapid transit terminal and an area with potential for transit-oriented development.
Location and layout
Northgate Transit Center is located east of 1st Avenue NE between NE 103rd and NE 100th streets on the south side of Northgate Mall. It consists of 4.5 acres (1.8 ha) and includes a 284-stall park and ride that is supplemented by 728 additional spaces in surrounding lots.[1] The transit center itself consists of six bus bays that serve a reverse-direction street for buses that is wide enough for layover space and passing lanes.[2] The passenger waiting area is covered by large white canvases held aloft by steel towers.[3] Various pieces of public artwork at the transit center were designed by Chris Bruch and cost $50,000 to install.[4]
The transit center is also located directly east of Interstate 5 and is near an access ramp to the freeway's reversible express lanes.[5]
The transit center features several amenities, including public bathrooms, pay phones, an ORCA card vending machine, bicycle parking, and a baby changing station.[3]
History
The Northgate Transit Center opened on June 6, 1992, at a cost of $15.8 million to construct.[3] It was planned in 1978,[6] as part of King County Metro's "MetroTRANSITion" program, becoming the last of 11 transit centers built under the plan.[7][8] The Northgate area was historically served by the Blue Streak express bus to downtown Seattle from 1970 onward,[9] using a park and ride on the north side of the mall (closed in 2008 and converted into Hubbard Homestead Park).[10] Construction began in 1990 with the demolition of a Group Health clinic and relocation of a segment of Thornton Creek.[11]
The park and ride at the transit center initially consisted of the west lot, with 284 spaces, and was expanded twice in the 2000s. In 2001, the parking lot was expanded to 950 spaces after the $7.6 million purchase of 3.9 acres (1.6 ha) from Simon Property Group.[12] The completion of Thornton Creek in April 2009 brought 350 additional parking spaces to be added to the transit center,[13] mostly used to replace a 500-stall park and ride north of the mall.[10]
Future
Light rail
The Northgate Transit Center will become the terminus of Line 1 of the Link light rail system in 2021, with the completion of the $1.9 billion Northgate Link Extension project. The 4.3-mile-long (6.9 km) light rail line will extend light rail north from University of Washington station to Northgate via a tunnel and two stations at U District and Roosevelt.[14]
The Northgate area had been considered in several rapid transit studies in the late 20th century as a suitable terminus or major station.[15] The Northgate Link project was proposed as part of the "Sound Move" ballot measure in 1996, pending additional funding,[16] but was deferred until the voter approval of the Sound Transit 2 package in 2008.[14][17]
Construction of the light rail extension began in 2012 and will be completed in late 2021.[14] Absher Construction was awarded a $174 million contract in August 2016 to build Northgate station and the elevated guideway leading to the tunnel portal.[18] On January 13, 2017, Sound Transit broke ground on the station, beginning construction with the demolition of two parking lots.[19] By July, installation of the station's support columns and platform-level girders were underway.[20][21] Construction on the station was declared substantially complete in February 2021, shortly after powered testing of light rail vehicles had begun.[22][23]
The Northgate light rail station will be elevated 25 to 45 feet (7.6 to 13.7 m) above ground level, on the east side of 1st Avenue Northeast, spanning Northeast 103rd Street. It will have two entrances, one adjacent to the Northgate Mall at the corner of 1st Avenue NE and NE 103rd Street and another adjacent to the transit center.[14] Beyond the station, a 400-foot (120 m) pocket track will be built to the north for train storage and reversal, as well as accommodating a future light rail extension to Lynnwood Transit Center, planned to be completed in 2024.[24] Two pieces of public art, a stained glass mural of a dragonfly on the platform level and a sculpture outside the south entrance, are planned to be included in the station's construction.[25][26]
As part of the project, parking capacity at the transit center would be reduced by spaces eliminated for the station and a new bus station to the west of the current one.[27] A partially below-grade parking garage with 450 spaces was opened in November 2018 on the southwest corner of the Northgate Mall parking lot.[28] A larger garage with up to 900 vehicles was proposed but rejected after outcry from community and neighborhood groups.[29][30] Sound Transit estimates that the station will have 15,000 daily boardings by 2030.[24]
Bus rapid transit
Northgate Transit Center is being planned as the terminus of two bus rapid transit lines under development by the Seattle Department of Transportation as part of the RapidRide+ program. The program was funded by the November 2015 "Move Seattle" levy and consists of seven corridors throughout the city of Seattle.[31][32]
The Roosevelt to Downtown line, anticipated to open in 2021, will travel south along Roosevelt Way and Eastlake Avenue from Northgate through the Roosevelt, University District, Eastlake and South Lake Union neighborhoods.[33] The Northgate/Fremont line, anticipated to open in 2022, will replace Metro bus route 40 and travel through the Ballard and Fremont neighborhoods toward Downtown Seattle.[34]
Pedestrian bridge
A pedestrian bridge over Interstate 5 is planned to be built to improve walking access to North Seattle College and the Licton Springs neighborhood from the future light rail station.[35] The bridge will be 1,338 feet (408 m) long and is planned to open in 2021.[36]
A $20 million bridge was proposed in 2012,[37] and designs were narrowed to two options: a tied-arch and a tube/truss;[38] the latter won out.
Funding for the bridge remained incomplete during the planning process. In 2012, Sound Transit and the Seattle Department of Transportation each allocated $5 million to cover part of the $25 million cost, if the remainder could be funded by July 2015.[37][39] A federal Transportation Investment Generating Economic Recovery (TIGER) grant application in October 2015 for $15 million was not approved,[40] but two Seattle council members asked to have the July deadline removed.[41] The Washington State Legislature approved $10 million in funding as part of the 2015 Transportation Improvements Budget.[42] Full funding for the project was finally approved with the November 2015 passage of the "Move Seattle" property tax levy.[35][43] Construction began in February 2020, but span installation was delayed to July 2020 due to the COVID-19 pandemic.[44][45]
Transit-oriented development
As part of the anticipated extension of light rail to Northgate Transit Center, the area around Northgate Mall was identified by the city as an "urban village" in 1993,[46] with heavy potential for transit-oriented development. In 2013, the Puget Sound Regional Council estimated that the 1⁄2-mile (0.80 km) buffer around the transit center had a population of 5,453 residents and 9,273 jobs.[47] In 2007, the city rezoned the Northgate area to support an increased height limit of 125 feet (38 m).[46]
In 2009, one of the mall's surface parking lots was converted into a mixed-use, transit-oriented development called "Thornton Place", with 109 condominiums, 278 apartments (including affordable units), a movie theater, and 50,000 square feet (4,600 m2) of retail space.[48] The complex, which also includes a community park and a daylit section of Thornton Creek,[49] was heralded as one of Seattle's first true transit-oriented developments.[50]
The city of Seattle published an "urban design framework" for the Northgate area in 2013, outlining a vision for the redevelopment of the neighborhood into an urban center, based on the 1993 urban village designation. The report focused on maximizing transit-oriented development around the transit center and light rail station by building mixed-use infill development in the surface parking lots south of the mall with open spaces and plazas.[51][52] The draft "Seattle 2035" comprehensive plan, written in 2015, anticipates at least 1,600 residential units and 6,000 jobs to be added to the Northgate area by 2035.[53] Simon Property Group announced a major redevelopment plan for Northgate Mall in 2018, proposing the addition of office space on the 55-acre (22 ha) site.[54]
Services
As of March 2016, Northgate Transit Center is served by 12 bus routes from King County Metro. It is the primary hub for bus routes in northern Seattle,[55] served by routes from the city of Shoreline, University District, Lake City, Fremont, and Downtown Seattle. Intercity express bus service to Bellevue and Issaquah is provided by two Sound Transit Express routes.[2][56][57]
From 2000 to 2003, Sound Transit also operated express buses to Northgate from Everett in Snohomish County on routes 505 and 506.[58]
Bus routes
Route | Bay(s)[2] | Termini[56] | Via[56] | Notes |
---|---|---|---|---|
26X | 2, 6 | Downtown Seattle | Green Lake | |
40 | 2, 6 | Downtown Seattle | Ballard, Fremont | |
41 | 2, 5 | Downtown Seattle (Transit Tunnel), Lake City |
||
63 | 2, 5 | First Hill | Peak-only commuter route | |
67 | 1, 5 | Seattle Children's Hospital | Roosevelt, University District | |
75 | 1, 5 | University District | Lake City, Sand Point | |
303 | 2, 5 | Shoreline, First Hill |
Peak-only commuter route | |
345 | 3, 4 | Shoreline Community College | Shoreline, Haller Lake | |
346 | 3, 4 | Aurora Village Transit Center | Shoreline | |
347 | 3, 4 | Mountlake Terrace Transit Center | Ridgecrest | |
348 | 3, 4 | Richmond Beach | Shoreline, Ridgecrest | |
555 | 4 | Issaquah Highlands | Bellevue Transit Center | Peak-only route |
556 | 4 | Issaquah Highlands | University of Washington station, Bellevue TC, Eastgate | Peak-only commuter route |
995 | Lakeside School, Laurelhurst |
Peak-only school route |
References
- "Park & Ride Information". King County Metro. Archived from the original on August 13, 2016. Retrieved August 8, 2016.
- "Northgate Transit Center Boarding Locations". King County Metro. Archived from the original on October 12, 2016. Retrieved August 8, 2016.
- Lane, Bob (May 27, 1992). "Not quite your average bus stop — design and usefulness meet at Metro's new Northgate Transfer Center". The Seattle Times. p. B3. Archived from the original on March 3, 2016. Retrieved August 8, 2016.
- "Northgate Transit Center (sculpture)". Smithsonian American Art Museum. Retrieved January 9, 2017.
- Brown, Charles E. (March 27, 2006). "Bumper to Bumper: Red-light cameras, Saving time, Highway 9". The Seattle Times. p. B1. Archived from the original on August 21, 2016. Retrieved August 8, 2016.
- Fleming, Leonard (June 5, 1992). "Major changes coming in Metro services, routes". The Seattle Times. p. A1.
- Crowley, Walt (July 9, 1993). "Part IV: End of the Line, Tunnel Visions and a Shotgun Merger". Routes: An Interpretive History of Public Transportation in Metropolitan Seattle. p. 127. OCLC 31996584.
- Gough, William (December 8, 1982). "Northgate area will get Metro transit center". The Seattle Times. p. F1.
- "Milestones—The 1970s". King County Metro. Archived from the original on May 7, 2017. Retrieved January 26, 2017.
- Murakami, Kery (December 7, 2008). "Getting There: New park won't cost park and ride spaces". Seattle Post-Intelligencer. Archived from the original on September 21, 2016. Retrieved August 8, 2016.
- "Transit center work to begin this month". The Seattle Times. April 5, 1990. p. B3.
- Kossen, Bill (December 22, 2001). "Park-ride lot takes chunk out of plan for Northgate". The Seattle Times. p. B2.
- Pryne, Eric (March 25, 2009). "Lose your job? No worries, they'll pay your mortgage". The Seattle Times. p. A1. Archived from the original on September 21, 2016. Retrieved August 8, 2016.
- "Northgate Link Extension" (PDF). Sound Transit. May 2016. Archived from the original (PDF) on October 20, 2016. Retrieved August 8, 2016.
- Nolan, Mary (September 28, 1990). "Metro wants rapid-transit system to Northgate". The Seattle Times. p. B3.
- "Sound Move: The Ten-Year Regional Transit System Plan" (PDF). Central Puget Sound Regional Transit Authority. May 31, 1996. Archived (PDF) from the original on March 4, 2016. Retrieved August 8, 2016.
- Schaefer, David (February 23, 1999). "Light rail to Northgate? Maybe not for 12 years". The Seattle Times. p. A1. Archived from the original on March 5, 2016. Retrieved August 8, 2016.
- "Sound Transit selects Absher Construction to build elevated station, guideway for Northgate Link Extension" (Press release). Sound Transit. August 26, 2016. Archived from the original on August 29, 2016. Retrieved August 29, 2016.
- "Sound Transit breaks ground on Northgate light rail station" (Press release). Sound Transit. January 13, 2017. Archived from the original on January 16, 2017. Retrieved January 13, 2017.
- "Project update: Northgate Station girder installation time-lapse". Sound Transit. June 30, 2017. Archived from the original on April 14, 2018. Retrieved April 13, 2018.
- "Project update: Shaft drilling for Northgate station complete". Sound Transit. July 31, 2017. Archived from the original on April 14, 2018. Retrieved April 13, 2018.
- "Construction now substantially complete on all three Northgate Link stations" (Press release). Sound Transit. February 2, 2021. Retrieved February 2, 2021.
- Lindblom, Mike (January 30, 2021). "Power tests start for light rail linking UW to Northgate". The Seattle Times. Retrieved February 2, 2021.
- "Northgate Station" (PDF). Sound Transit. July 2012. Archived from the original (PDF) on October 2, 2015. Retrieved August 8, 2016.
- "Northgate Station". Sound Transit. Archived from the original on July 28, 2015. Retrieved August 8, 2016.
- Metzger, Katie (August 19, 2019). "Art that reflects and creates community". The Platform. Sound Transit. Retrieved February 2, 2021.
- "Northgate Station". Seattle Design Commission. Archived from the original on July 28, 2016. Retrieved August 8, 2016.
- Phan, Suzanne (November 19, 2018). "New Northgate parking garage opens in advance of light rail, but some spots will cost you". KOMO. Retrieved January 9, 2019.
- Gutierrez, Scott (May 28, 2012). "Parking plan for Northgate light rail station triggers dispute". Seattle Post-Intelligencer. Retrieved January 2, 2020.
- Lindblom, Mike (July 27, 2013). "Sound Transit to test charging for parking at 4 lots". The Seattle Times. Archived from the original on September 21, 2016. Retrieved August 8, 2016.
- Lindblom, Mike (October 18, 2015). "Move Seattle levy: Better bus service or a bunch of 'guesstimates'?". The Seattle Times. Archived from the original on April 8, 2016. Retrieved August 24, 2016.
- Lindblom, Mike (November 3, 2015). "Voters saying yes to Seattle's big ask for transportation". The Seattle Times. Archived from the original on October 3, 2016. Retrieved August 24, 2016.
- "Roosevelt to Downtown High Capacity Transit (HCT)". Seattle Department of Transportation. Archived from the original on August 12, 2016. Retrieved August 8, 2016.
- "Seattle RapidRide Expansion Program". Seattle Department of Transportation. July 2016. Cite journal requires
|journal=
(help) - "Northgate Pedestrian and Bicycle Bridge". Seattle Department of Transportation. Archived from the original on July 29, 2016. Retrieved August 8, 2016.
- Minnick, Benjamin (September 5, 2019). "$8M handrails trigger rebid of Northgate pedestrian bridge". Seattle Daily Journal of Commerce. Retrieved January 2, 2020.
- Gutierrez, Scott (June 28, 2012). "Sound Transit approves $5 million for Northgate pedestrian bridge". Seattle Post-Intelligencer. Archived from the original on May 17, 2015. Retrieved May 18, 2015.
- "Northgate Pedestrian and Bicycle Bridge: Design Meeting 2" (PDF). Seattle Department of Transportation. October 21, 2014. Archived from the original (PDF) on September 24, 2015. Retrieved May 18, 2015.
- "Northgate Pedestrian Bridge" (PDF). Seattle Department of Transportation. April 2014. Archived from the original (PDF) on June 24, 2014. Retrieved May 18, 2015.
- Lindblom, Mike (October 27, 2015). "Feds deny funding for Northgate pedestrian bridge, Pronto bike expansion". The Seattle Times. Archived from the original on September 3, 2016. Retrieved August 8, 2016.
- Feit, Josh (December 22, 2014). "Seattle Sound Transit Board Members O'Brien and Phillips Try to Save Northgate Ped/Bike Bridge". Seattle Met. Archived from the original on April 6, 2015. Retrieved May 18, 2015.
- "Northgate Pedestrian and Bicycle Bridge Project Fact Sheet" (PDF). Seattle Department of Transportation. October 2015. Archived from the original (PDF) on March 2, 2016. Retrieved August 8, 2016.
- Lindblom, Mike (May 6, 2015). "City wants even larger transportation levy: $930 million". The Seattle Times. Archived from the original on May 22, 2015. Retrieved May 18, 2015.
- Sheldon, Linzi (February 5, 2020). "Groundbreaking for massive pedestrian bridge over I-5 to Northgate". KIRO 7 News. Retrieved July 22, 2020.
- Davis, Sara (July 21, 2020). "See it happening: This week cranes lift first set of bridge spans for the Northgate Pedestrian & Bike Bridge". SDOT Blog. Seattle Department of Transportation. Retrieved July 22, 2020.
- Pryne, Eric (December 26, 2008). "Seattle's vision of Northgate as urban center takes shape". The Seattle Times. Archived from the original on August 9, 2016. Retrieved August 8, 2016.
- Growing Transit Communities Oversight Committee (October 2013). "Northgate: Future Light Rail/Bus" (PDF). The Growing Transit Communities Strategy. Puget Sound Regional Council. Retrieved August 8, 2016.
- "A year later, Northgate condos still all unsold". The Seattle Times. April 3, 2010. Archived from the original on September 21, 2016. Retrieved August 8, 2016.
- Zemtseff, Katie (March 26, 2009). "European village pops up in Northgate's parking lot". Seattle Daily Journal of Commerce. Archived from the original on August 25, 2016. Retrieved August 8, 2016.
- Benfield, Kaid (June 7, 2011). "A Seattle development that is greener than green". Grist. Archived from the original on December 2, 2016. Retrieved August 8, 2016.
- Northgate Urban Design Framework (PDF) (Report). City of Seattle Department of Planning and Development. December 2013. Archived (PDF) from the original on March 29, 2016. Retrieved August 16, 2016.
- Lindblom, Mike (June 8, 2012). "Cars, bikes: Competing views of Northgate transit makeover". The Seattle Times. Archived from the original on August 25, 2017. Retrieved August 24, 2017.
- "Seattle's Growth Strategy" (PDF). Seattle 2035: Draft Comprehensive Plan for Managing Growth, 2015-2035 (Report). City of Seattle Department of Planning and Development. July 8, 2015. p. 29. Archived (PDF) from the original on May 9, 2016. Retrieved August 16, 2016.
- Rosenberg, Mike (March 9, 2018). "Northgate Mall plans huge overhaul with housing, offices as North Seattle transforms". The Seattle Times. Archived from the original on March 11, 2018. Retrieved April 13, 2018.
- "TIGER FY 2015 Grant Application: Northgate Non-Motorized Access to Transit and Education" (PDF). City of Seattle. 2015. p. 18. Archived from the original (PDF) on March 2, 2016. Retrieved August 24, 2016.
- Regional Transit Map Book (PDF) (Map). Sound Transit. February 2014. pp. 8–11. Archived from the original (PDF) on July 28, 2017. Retrieved August 16, 2016.
- Metro Transit System: Northwest Area (PDF) (Map). King County Metro. Archived (PDF) from the original on August 17, 2016. Retrieved August 16, 2016.
- Hadley, Jane (May 8, 2003). "Sound Transit bus routes get a tweaking". Seattle Post-Intelligencer. Archived from the original on September 24, 2016. Retrieved August 16, 2016.
External links
- Media related to Northgate Transit Center at Wikimedia Commons