North-South Corridor (Ahmedabad Metro)

The North-South Corridor of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad, India. It consists of 15 metro stations from APMC to Motera Stadium with a total distance of 18.87 km (11.73 mi). The complete line is elevated.

North-South Corridor
Overview
StatusUnder Construction
LocaleAhmedabad
TerminiMotera Stadium
APMC
Stations15
Service
TypeRapid Transit
SystemAhmedabad Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockHyundai Rotem
History
Opened2022 (Expected)
Technical
Line length18.87 km
CharacterElevated
Track gauge1,435 mm (4 ft 8 12 in) (Standard gauge)
Electrification25 kV 50 Hz AC Overhead catenary
Route map

km
to North–South Extension Corridor
Motera Stadium
Sabarmati
AEC
Sabarmati Railway Station
Ranip
Vadaj
Vijay Nagar
Usmanpura
Old High Court on East-West Corridor
Gandhigram
Paldi
Shreyas
Rajiv Nagar
Jivraj Park
APMC
Gyaspur Depot

It will connect Motera Stadium to APMC, Vasna and will be passing through Sabarmati, AEC, Sabarmati Railway station, Ranip, Vadaj, Vijaynagar, Usmanpura, Old High court, Gandhigram, Paldi, Shreyas, Rajivnagar and Jivraj stations.[1]

List of stations

Following is a list of stations on this route-

North-South Corridor
# Station Name Status Connections Layout
EnglishGujarati
1Motera Stadiumમોટેરા સ્ટેડિયમUnder ConstructionNoneElevated
2SabarmatiસાબરમતીUnder ConstructionNoneElevated
3AECએ ઇ સીUnder ConstructionNoneElevated
4Sabarmati Railway Stationસાબરમતી રેલવે સ્ટેશનUnder ConstructionNoneElevated
5RanipરાણીપUnder ConstructionNoneElevated
6VadajવાડજUnder ConstructionNoneElevated
7Vijay Nagarવિજય નગરUnder ConstructionNoneElevated
8Usmanpuraઉસ્માનપુરાUnder ConstructionNoneElevated
9Old High Courtજૂની હાઇ કોર્ટUnder Construction East-West Corridor Elevated
10Gandhigramગાંધીગ્રામUnder ConstructionNoneElevated
11PaldiપાલડીUnder ConstructionNoneElevated
12Shreyasશ્રેયસUnder ConstructionNoneElevated
13Rajiv Nagarરાજીવ નગરUnder ConstructionNoneElevated
14Jivraj Parkજીવરાજ પાર્કUnder ConstructionNoneElevated
15APMCએ પી એમ સીUnder ConstructionNoneElevated

References

  1. "Project Profile". GMRC. Retrieved 8 March 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.