North-South Corridor (Ahmedabad Metro)
The North-South Corridor of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad, India. It consists of 15 metro stations from APMC to Motera Stadium with a total distance of 18.87 km (11.73 mi). The complete line is elevated.
North-South Corridor | |||
---|---|---|---|
Overview | |||
Status | Under Construction | ||
Locale | Ahmedabad | ||
Termini | Motera Stadium APMC | ||
Stations | 15 | ||
Service | |||
Type | Rapid Transit | ||
System | Ahmedabad Metro | ||
Operator(s) | Gujarat Metro Rail Corporation Limited | ||
Rolling stock | Hyundai Rotem | ||
History | |||
Opened | 2022 (Expected) | ||
Technical | |||
Line length | 18.87 km | ||
Character | Elevated | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) (Standard gauge) | ||
Electrification | 25 kV 50 Hz AC Overhead catenary | ||
|
It will connect Motera Stadium to APMC, Vasna and will be passing through Sabarmati, AEC, Sabarmati Railway station, Ranip, Vadaj, Vijaynagar, Usmanpura, Old High court, Gandhigram, Paldi, Shreyas, Rajivnagar and Jivraj stations.[1]
List of stations
Following is a list of stations on this route-
North-South Corridor | |||||||
---|---|---|---|---|---|---|---|
# | Station Name | Status | Connections | Layout | |||
English | Gujarati | ||||||
1 | Motera Stadium | મોટેરા સ્ટેડિયમ | Under Construction | None | Elevated | ||
2 | Sabarmati | સાબરમતી | Under Construction | None | Elevated | ||
3 | AEC | એ ઇ સી | Under Construction | None | Elevated | ||
4 | Sabarmati Railway Station | સાબરમતી રેલવે સ્ટેશન | Under Construction | None | Elevated | ||
5 | Ranip | રાણીપ | Under Construction | None | Elevated | ||
6 | Vadaj | વાડજ | Under Construction | None | Elevated | ||
7 | Vijay Nagar | વિજય નગર | Under Construction | None | Elevated | ||
8 | Usmanpura | ઉસ્માનપુરા | Under Construction | None | Elevated | ||
9 | Old High Court | જૂની હાઇ કોર્ટ | Under Construction | East-West Corridor | Elevated | ||
10 | Gandhigram | ગાંધીગ્રામ | Under Construction | None | Elevated | ||
11 | Paldi | પાલડી | Under Construction | None | Elevated | ||
12 | Shreyas | શ્રેયસ | Under Construction | None | Elevated | ||
13 | Rajiv Nagar | રાજીવ નગર | Under Construction | None | Elevated | ||
14 | Jivraj Park | જીવરાજ પાર્ક | Under Construction | None | Elevated | ||
15 | APMC | એ પી એમ સી | Under Construction | None | Elevated |
References
- "Project Profile". GMRC. Retrieved 8 March 2019.