New Savannah Bluff Lock and Dam

New Savannah Bluff Lock and Dam is a dam with inactive lock at the site of the dead town of New Savannah, Georgia on the Savannah River south of Augusta, Georgia.

New Savannah Bluff Lock and Dam
LocationRichmond County, Georgia / Aiken County, South Carolina, United States
Opening date1937
Operator(s)Army Corps of Engineers
Dam and spillways
ImpoundsSavannah River
Height15 feet
Length360 ft (379 m)
Reservoir
CreatesSavannah River
Power Station
Turbines0
Installed capacity0 MW

Purpose

The dam was constructed by the Army Corps of Engineers for commercial navigation purposes to serve the city of Augusta, located approximately 13 miles (21 km) upstream. It does not serve a hydroelectric power generation or flood control function.[1]

History

Located at river mile 187.4, the lock and dam was authorized by the 1930 and 1935 Rivers and Harbors Acts to facilitate commercial navigation on the upper reaches of the Savannah River. The structure was completed in 1937. The last commercial shipping to use the lock ceased in 1979 and the structure and upstream channel fell into disuse.[1] In 1999 the Corps of Engineers proposed demolishing and removing the dam, but local outcry over the resulting impact to users of the impounded pool resulted in the United States Congress declaring in 2000 that the dam would be repaired and then turned over to a local government to be maintained, however the work never received funding.[2]

The Water Infrastructure Improvements for the Nation Act (the WIIN Act), deauthorized the lock and dam and directed the Army Corps to construct fish passage across the existing dam while maintaining the impoundment of water. The deepening of the Savannah River to allow Neopanamax-sized ships reach the Port of Savannah caused saltwater to damage spawning grounds of the endangered shortnose sturgeon near the mouth of the river. Allowing fish passage upriver of the New Savannah Bluff dam to historic spawning grounds was identified as a mitigation to this damage. As of June 2018, the Army Corps presented five alternatives to allow fish passage and expects to select a plan in 2019 and begin construction in 2021.[3]

Current uses

The dam serves water supply users including one municipality, five industries, and one sod farm; water-related recreation opportunities such as general boating and fishing and specialized rowing and powerboat race events; and regional economic development and tourism. It is also operated to pass some migratory anadromous fish species. The upstream pool extends through downtown Augusta to near the I-20 bridges.[1]

Structure

This project consists of a lock chamber, dam, operation building, and a 50-acre (200,000 m2) park and recreation area. The dam is 360 feet (110 m) long with five vertical lift gates. Each gate is 60 feet (18 m) long and located between concrete piers. The two gates on each end of the dam are 12 feet (3.7 m) high, overflow type. The three middle gates are 15 feet (4.6 m) high, non-overflow type. All are remotely controlled from the J. Strom Thurmond project. The lock is on the Georgia side of the river adjacent to the dam. The lock’s usable chamber is 56 feet (17 m) wide and 360 feet (110 m) long and the lift height is approximately 15 feet (4.6 m). Construction of this concrete gravity structure supported by timber piles was completed in 1937.[1]

Notes

This article contains public domain text from the Corps of Engineers.

References

  1. New Savannah Bluff Lock and Dam Project; Savannah River Georgia and South Carolina; Section 216; Disposition Study; Final Report; September 8, 2000
  2. Pavey, Rob. Stimulus bill could aid dam; Augusta Chronicle; January 22, 2009
  3. Corwin, Tom (July 3, 2018). "Corps unveils options for Lock and Dam". augustachronicle.com. Gatehouse Media. Archived from the original on July 6, 2018. Retrieved July 6, 2018.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.