MainPower
MainPower New Zealand Limited is an electricity distribution company, based in Rangiora, New Zealand, responsible for electricity distribution to over 37,000 customers in the Canterbury region north of the Waimakariri River.[1] MainPower was formed in 1994, after the Energy Companies Act 1992 required the North Canterbury Electric Power Board to reform into a commercial power company. More reforms in 1998 required electricity companies nationally to split their lines and retail businesses, with MainPower retaining its lines business and selling its retail business to Contact Energy.
Industry | Electricity distribution |
---|---|
Predecessor | North Canterbury Electric Power Board |
Founded | 1928 |
Headquarters | , |
Key people | Tony King (Chair) Andy Lester (CE) |
Parent | MainPower Trust |
Website | www |
MainPower has initiated a number of local generation projects, including the Mount Cass Wind Farm (proposed)[2] and Cleardale Hydro Power Station (operating).[3]
Electricity network
MainPower has a total service area of 11,180 square kilometres (4,320 sq mi), covering the Waimakariri, Hurunui and Kaikoura districts. The area includes the towns of Kaiapoi, Rangiora, Oxford, Woodend, Pegasus, Amberley, Waipara, Culverden, Cheviot, Hanmer Springs and Kaikoura.[1]
MainPower takes electricity from Transpower's national grid at five grid exit points (GXPs): Kaiapoi, Southbrook, Ashley, Waipara and Culverden. It operates 4,873 km of circuits[1] at 66,000 and 33,000 volts for subtransmission, and 22,000 and 11,000 volts for distribution. As is standard in New Zealand, electricity is delivered to homes at 230/400 volts (phase-to-neutral/phase-to-phase).
In 2011, MainPower purchased the Kaikoura GXP and Culverden to Kaikoura 66 kV transmission line from Transpower. In 2015, MainPower completed works to up-rate the network west of Rangiora towards Oxford to 66/22 kV (from 33/11 kV). Other projects in progress include upgrading the 33 kV subtransmission line between Cheviot and Kaikoura to 66 kV, and preparing for a new "Rangora East" GXP between Rangiora and Woodend to supply Woodend and Pegasus, offloading Kaiapoi GXP.
Parameter | Value |
---|---|
Total system length | 4,900 km |
66 kV | 136 km |
33 kV | 227 km |
22 kV | 886 km |
11 kV | 2,680 km |
Single wire earth return (SWER) | 119 km |
Low voltage (230/400 V) | 852 km |
Street lighting | 397 km |
Customer connections | 42,698 |
System maximum demand | 109 MW |
System electricity delivered | 646 GWh |
In the year to 31 March 2015, the MainPower network had a SAIDI of 164 minutes, meaning the average customer experiences 2.75 hours without electricity every year.[4]
See also
References
- "About MainPower". MainPower.
- "Mt Cass Wind Farm". Archived from the original on 4 October 2011. Retrieved 11 September 2011.
- "Hydro Generation". www.mainpower.co.nz. Retrieved 2018-03-31.
- "EDB Information Disclosure - MainPower New Zealand Limited - year ending 31 March 2015" (PDF). 31 August 2015. Retrieved 2 April 2016.