Project name | Sponsoring company | Coordinates | Capacity (MW) (AC) | Status | Notes |
---|---|---|---|---|---|
Daydream Solar Farm[2] | Edify Energy | 20.494622°S 147.746973°E | 167.5[3] | Operating | 180 MW DC capacity. Started Commercial Operations in August 2018. Originally developed by Solar Choice [4][5] |
Sun Metals Solar Farm[6] | Sun Metals | 19.437°S 146.696°E | 124 | Operating | 124 MW AC capacity.[7] Started exporting to the grid in May 2018.[8] |
Ross River Solar Farm[9] | Palisade | 19.425°S 146.716°E | 128 | Operating | Started exporting to the grid in September 2018. |
Darling Downs Solar Farm | APA Group | 27.112°S 150.882°E | 110 | Operating | Started exporting to the grid in September 2018. |
Clare Solar Farm[10] | Fotowatio Renewable Ventures | 19.840°S 147.211°E | 100[10] | Operating | Started exporting to the grid in May 2018.[10] |
Emerald Solar Park | RES Group | 23.510006°S 148.137953°E | 68 | Operating | Started exporting to the grid in October 2018. |
Hamilton Solar Farm | Wirsol and Edify Energy | 20.494401°S 147.771521°E | 57.5 | Operating | Started exporting to the grid in March 2018.[11] |
Hayman Solar Farm | Edify Energy | 20.494683°S 147.748475°E | 50 | Operating | Started Commercial Operations in August 2018.[12] |
Whitsunday Solar Farm | Wirsol and Edify Energy | 20.504823°S 147.767454°E | 57.5 | Operating | Started exporting to the grid in March 2018.[13] |
Kidston Solar Project KS1 | Genex | 18.880°S 144.151°E | 50 | Operating | 50 MW Stage started exporting to the grid in November 2017.[14] |
Kidston Solar Project KS2 | Genex | 18.884°S 144.124°E | 270 | Announced | EPBC Approval Pending 11 January 2019, Referral Number 2018/8229.[15] |
Aldoga Solar Farm | Acciona Australia | 23.801°S 151.054°E | 265 | Approved | Construction aims to start in early-mid 2020.[16] EPBC Approval 25 September 2018 (EPBC Referral 2018/8251) |
Aramara Solar Farm | 25.572°S 149.854°E | 140 | Approved | [17] | |
Baralaba Solar Farm | Fotowatio Renewable Ventures | 24.195°S 152.329°E | 92 | Announced | [18] |
Barunggam Solar Farm | Ubergy | 26.685°S 150.765°E | 140 | Announced | Site location in cited article believed incorrect. Coordinates provided +/- 3km accuracy [19] |
Beelbee Solar Farm | APA Group | 27.145°S 150.824°E | 150+ | Approved | 150-240 MW Planned.[20] |
Baking Board Solar Farm | Impact Investment Group | 26.723°S 150.553°E | 19.9 | Operating | |
Barcaldine RC Solar Farm | Elecnor | 23.547°S 145.318°E | 20 | Operating | A further 40 MW proposed[21] |
Blackwater Solar Farm | Blackwater Solar Farm Pty Ltd | 23.597°S 148.753°E | 150 | Approved | Approved 11 Aug 2017[22] |
Blair Athol Solar Power Station | TerraCom Limited | 22.691°S 147.542°E | 60 | Announced | [23] |
Blue Grass Solar Farm | X-Elio Australia Pty Ltd | 26.680°S 150.493°E | 102 | Approved | Decision Notice Nov 2018[24] |
Bluewater Solar Farm | Fotowatio Renewable Ventures | 19.145°S 146.485°E | 148 | Announced | EPBC Approval Obtained[25]< |
Bluff Solar Farm | Infigen Energy | 23.598°S 149.039°E | 260 | Announced | [26][27] |
Bouldercombe Solar Farm | Eco Energy World | 23.525°S 150.499°E | 280 | Approved | [28] |
Bowen Solar Farm | Infigen Energy | 20.076°S 148.216°E | 100 | Announced | [29]EPBC Referral reference 2017/8123 pending approvals 2 Nov 2018 |
Brigalow Solar Farm | Impact Investment Group | 27.690°S 151.564°E | 34.5 | Approved | [30] |
Broadlea Solar Farm | Eco Energy World | 21.862°S 148.170°E | 100 | Approved | [31] |
Bucca Solar Farm | PB Enertec Pry Ltd | 24.939°S 152.080°E | 108.8 | Approved | Approved 21 Dec 2018 PD on Line Reference Number 522.2018.108.1[32] |
Bulli Creek Solar Farm | Solar Choice and SunEdison | 28.021°S 150.878°E | 1200[33] | Approved | [34] |
Bullyard Solar Farm | EIWA Solar Bundaberg Pry Ltd | 24.938°S 152.015°E | 92 | Approved | Approved 8 Nov 2018 PD on Line Reference Number 522.2018.70.1[35] |
Burdekin Solar Farm | Cleangen | 19.880°S 147.165°E | 140 | Approved | Approved[36] |
Cameby Solar Farm | X-Elio | 26.682°S 150.510°E | 148 | Approved | Approved Nov 2018 [37] |
Cape York Solar Storage | Lyon Group | 15.898°S 144.857°E | 55 | Approved | Approved July 2017 [38] |
Chewco Solar Energy Farm | Tilt Renewables | 17.047°S 145.384°E | 75 | Announced | Fact Sheet August 2017[39] |
Childers Solar Farm | Elliot Green Power | 25.303°S 152.403°E | 75 | Operating | Started exporting to the grid in March 2019.[40][41] |
Childers DDN Green Solar Farm | DDN Green | 24.923°S 152.294°E | 42 | Announced | Development Application lodged 23 October 2018 PD on Line Reference Number 522.2017.88.1[42] |
Chinchilla Solar Farm | First Solar | 26.670°S 150.793°E | 100 | Approved | [43] |
Clarke Creek Wind and Solar Farm | Lacour Energy | 22.656°S 149.347°E | 400 | Approved | [44][45] |
Clermont Solar Farm | Wirsol | 22.839°S 147.581°E | 75 | Operating | Started exporting to the grid in June 2019.[46][47] |
Cloncurry (Solarvoltaic) Solar Farm | Infigen Energy | 20.706°S 140.509°E | 30 | Announced | [48] |
Collinsville Solar PV | Ratch Australia | 20.538°S 147.807°E | 42.5 | Operating | [49] |
Comet Solar Farm | Hadstone Energy /Comet Solar Farm Pty Ltd | 23.613°S 148.770°E | 235 | Approved | Due to commission on 30 November 2018.[50][51] |
Columboola Solar Farm | Luminous Energy | 26.636°S 150.296°E | 310 | Approved | [52] |
Crinum Creek Solar Farm | Adani | 23.031°S 148.340°E | 100 | Announced | GMUSG-SACOME-Conference Aug 2016 [53] |
Dalby Solar Farm RES | RES | 27.208°S 151.308°E | 22 | Approved | [54] |
Daystar Energy Solar Farm | Daystar Energy | 26.643°S 150.290°E | 100 | Approved | Decision Notice Oct 18 [55] |
Delga Solar Farm | Shell | 26.274°S 149.749°E | 250 | Approved | [56] |
Desailly Renewable Energy Park | DP Energy | 16.488°S 145.384°E | 250 | Announced | Development Application Lodged[57]project web site[58] |
Dingo Solar Farm | ESCO Pacific | 23.634°S 149.383°E | 85 | Announced | [59] |
Dunblane Solar Farm | YD Projects | 23.540294°S 145.275339°E | 11 | Operating | [60] |
Dysart Solar Energy Farm | Tilt Renewables | 22.579°S 148.368°E | 150 | Approved | [61][62] Project Approval[63] |
Dysart Solar Farm | Hanwha | 22.514°S 148.504°E | 130 | Announced | |
Edenvale Solar Farm | Edenvale Solar Park Pty Ltd | 26.932°S 150.583°E | 280 | Approved | [64] |
Ewerleigh Solar Farm | Everleigh Solar Park Pty Ltd | 26.913°S 150.586°E | 150 | Approved | [64] Decision Notice[65] Project and Owner name are correct |
Gooburrum Solar Farm | PB Enertec Pry Ltd | 24.807°S 152.319°E | 4 | Approved | Approved 15 Dec 2017 PD on Line Reference Number 522.2017.26.1[66] |
Gregory Solar Farm | Engie Renewables Australia | 23.143°S 148.447°E | 215 | Approved | [67] |
Gumlu Solar Farm | RJ Gordon Solar Consultants | 19.871°S 147.668°E | 60 | Announced | [68] |
Gympie Regional Energy Hub | SolarQ | 26.094°S 152.443°E | 350 | Approved | 350 MW approved, 1000 MW additional in planning.[69] |
Harlin Solar Farm | Sunshine Energy | 26.948°S 152.410°E | 1500 | Under construction | Construction began in February 2019. There are plans to add a 500MWh battery storage facility.[70][71] |
Haughton Solar Farm | Pacific Hydro | 19.731°S 147.073°E | 100 | Operating | First 100 MW Stage began exporting to the grid in June 2019.[72][73]It is believed the other stages have not begun construction.[74][75] |
Hughenden Sun Farm | Lighthouse Solar | 20.854°S 144.186°E | 22.5 | Operating | Construction started in September 2017 and production commenced in September 2018.[76] |
Kelsey Creek Solar Farm | KCSF Consortium | 20.449°S 148.539°E | 50 | Announced | [77] |
Kennedy Energy Park | Windlab / Eurus | 20.935°S 144.315°E | 15 | Under construction | First 15 MW stage commenced. Further 650 MW stage has not begun as of November 2018.[78] |
Kingaroy Solar Farm | Terrain Energy | 19.826°S 147.527°E | 40 | Announced | Development approval refused 23 Nov 2018, appeal lodged against Council decision and pending[79] |
Koberinga Solar Farm | ESCO Pacific | 19.826°S 147.527°E | 55 | Announced | [80] |
Lakeland Solar Farm | Conergy Australia | 15.868°S 144.862°E | 26 | Operating | [81] |
Lilyvale Solar Farm | Fotowatio Renewable Ventures | 23.070°S 148.423°E | 100 | Operating | Started exporting to the grid in March 2019.[82][83] |
Longreach Solar Farm | Canadian Solar | 23.44993°S 144.361703°E | 15 | Operating | [84] |
Majors Creek Solar Farm | Edify | 19.582°S 146.862°E | 200 | Announced | EPBC Approval 20 July 2017 EPBC Reference 2017/7963[85]Town planning report[86] |
Mareeba Solar Farm | CleanGen | 16.000°S 145.400°E | 60 | Approved | [87] |
Middlemount Solar Farm | Overland | 22.824°S 148.723°E | 28 | Under construction | [88] |
Mirani Solar Farm | ESCO Pacific | 21.146°S 148.830°E | 60 | Approved | [89] |
Moura Solar Farm | ESCO Pacific | 24.514°S 150.084°E | 110 | Announced | [90] |
Munna Creek Solar Farm | Renewable Energy System Technologies | 25.892°S 152.469°E | 120 | Approved | [91] |
Normanton Solar Farm | Scouller Energy | 17.681°S 141.050°E | 5 | Operating | [92] |
Oakdene Solar Farm | juwi | 26.710°S 150.725°E | 100 | Announced | [93] Development approval subject to appeal Mar 2019 |
Oakey Solar Farm | Canadian Solar Australia / RE Oakey | 27.407166°S 151.660702°E | 25 | Operating | Oakey 1 (25MW) started exporting to the grid in March 2019. [94]
Oakey 2 (55MW) has not started exporting to the grid as of July 2019. [95] |
Paget Solar Farm | BOMA Group | 21.190°S 149.165°E | 20 | Announced | [96] |
Qunaba Solar Farm | PB Enertec Pry Ltd | 24.901°S 152.436°E | 77 | Approved | Approved 21 Dec 2018 PD on Line Reference Number 522.2018.113.1[97] |
Raglan Solar Farm | Eco Energy World | 23.758°S 150.850°E | 350 | Approved | [98] |
Rodds Bay Solar Farm | Renew Estate | 24.189°S 151.585°E | 250[99] | Approved | [100] |
Rolleston Solar Farm | RES Group | 24.396°S 148.473°E | 90 | Approved | [101] |
Rollingstone Solar Farm | ESCO Pacific | 19.013°S 146.407°E | 110 | Approved | [102] |
Rugby Run Solar Farm | Adani Australia | 22.084°S 147.870°E | 65 | Operating | Started exporting to the grid in May 2019.[103][104] |
Susan River Solar Farm | Elliot Green Power | 25.417°S 152.744°E | 100 | Operating | Started exporting to the grid in December 2018.[105] Officially opened in February 2019.[106][107] |
Sunshine Coast Solar Farm | Sunshine Coast Regional Council | 26.560°S 153.026°E | 15 | Operating | [108] |
Tieri Solar Farm | Fotowatio Renewable Ventures | 23.096°S 148.045°E | 96 | Approved | [109] |
Wandoan Solar Project | Equis | 26.248°S 149.764°E | 1000 | Approved | [110] |
Warhook Solar Project | Engie Renewables Australia | 26.612°S 150.259°E | 200 | Approved | [111][112] |
Warwick Solar Farm | University of Queensland | 28.189°S 152.060°E | 64 | Under construction | Construction started in April 2019.[113][114] |
Western Downs Green Power Hub | Neoen | 26.955°S 150.677°E | 390[115] | Approved | 390MWac facility. Proposed to be paired with 580MWh of battery storage.[116][117] |
Western Downs Solar Farm | Tilt Renewables | 26.937°S 150.707°E | 250 | Announced | [118] |
Woolooga Energy Park | LGI Limited | 26.076°S 152.487°E | 185 | Announced | [119] |
Yarranlea Solar Farm | Risen | 27.7074°S 151.527°E | 100 | Operating | Construction started 23 July 2018[120] |
Summary of capacity
Status | Capacity (MW) |
---|---|
Operating | 1609.5 |
Under construction | 1726.9 |
Approved | 7904.3 |
Announced | 2852 |
Total | 14092.7 |
References
- "Electricity generation map". maps.dnrm.qld.gov.au. Queensland Department of Energy and Water Supply. Retrieved 2018-11-26.
- "Daydream Solar Farm". Edify Energy. Retrieved 2018-11-13.
- "Wayback Machine". web.archive.org. Archived from the original on 2018-07-14. Retrieved 2018-11-26. Cite uses generic title (help)
- https://www.solarchoice.net.au/blog/whitsunday-solar-farm-hub-helicopter-flyover-video-photos/
- "Daydream Solar Farm". Edify Energy. Retrieved 2018-11-26.
- "Queensland's biggest solar farm starts generating to grid". RenewEconomy. 2018-05-31. Retrieved 2018-07-27.
- "Sun Metals Solar Farm". Archived from the original on 2018-07-27. Retrieved 2018-11-26.
- "Queensland's biggest solar farm starts generating to grid". RenewEconomy. 2018-05-31. Retrieved 2018-11-26.
- "The Project". Ross River Solar Farm. Retrieved 2018-09-27.
- "Renewables flow for Queensland". pv magazine Australia. Retrieved 2018-06-13.
- "Hamilton Solar Farm". Edify Energy. Retrieved 2018-11-26.
- "Hayman Solar Farm". Edify Energy. Retrieved 2018-11-26.
- "Whitsunday Solar Farm". Edify Energy. Retrieved 2018-11-26.
- "50 MW Kidston Solar Project". Genex Power Limited. Retrieved 2018-11-26.
- "50 MW Kidston Solar Project". EPBC. Retrieved 2019-01-11.
- "Aldoga Solar Farm". www.acciona.com.au. Retrieved 2018-11-27.
- "Aramara Solar Farm". AltEnergy. Retrieved 2018-11-27.
- "Home - FRV Baralaba Farm". FRV Baralaba Farm. Retrieved 2018-11-27.
- "Alt energy project update" (PDF). AltEnergy. Retrieved 2019-01-18.
- "Beelbee Solar Farm". AltEnergy. Retrieved 2018-11-27.
- "Barcaldine Remote Community Solar Farm" (PDF). Elecnor Australia. Retrieved 2019-01-21.
- "ECHDC Development Register" (PDF). CHRC. Retrieved 2019-01-21.
- "Blair Athol – 60 MW Solar Power Station Plans" (PDF). Retrieved 27 November 2018.
- "WRRC Decision Notice" (PDF). Retrieved 17 January 2019.
- "EPBC Approval". Retrieved 10 January 2019.
- "Bluff Solar Farm". AltEnergy. Retrieved 2018-11-27.
- "Bluff Solar Farm" (PDF) (Planning Report (Final)). Retrieved 2019-01-16.
- "Bouldercombe Solar Farm". AltEnergy. Retrieved 2018-11-29.
- "Bowen Solar Farm". AltEnergy. Retrieved 2018-11-29.
- "Brigalow Solar Farm". Impact. Retrieved 2019-01-18.
- "Broadlea Solar Farm". AltEnergy. Retrieved 2018-11-29.
- "PD On line". BRC. Retrieved 2019-01-21.
- "Projects". www.firstsolar.com. Retrieved 2019-07-19.
- "Bulli Creek Solar Farm". POWER PLANTS. Retrieved 2018-11-29.
- "PD On line". BRC. Retrieved 2019-01-21.
- "Burdekin solar project approved". CleanGen. Retrieved 2019-01-21.
- "WDRC Press Release". WDRC. Retrieved 2019-01-18.
- "Cape York Solar Storage - Lyon Group". Lyon Group. Retrieved 2018-11-30.
- "Chewko Solar Energy Farm Fact Sheet" (PDF). Static1. August 2017. Archived from the original (PDF) on 2019-01-23. Retrieved 2019-01-23.
- "Solar Energy in Australia | March 2019 | Aneroid". anero.id. Retrieved 2019-06-30.
- "Childers Solar Farm". AltEnergy. Retrieved 2018-11-30.
- "PD On line". BRC. Retrieved 2019-01-21.
- "Projects". www.firstsolar.com. Retrieved 2018-11-30.
- "Contractor and Employment Register". Clarke Creek Wind and Solar Farm. Retrieved 2018-11-30.
- "Isaac Regional Council". IRC. Retrieved 2019-01-16.
- "Solar Energy in Australia | June 2019 | Aneroid". anero.id. Retrieved 2019-06-30.
- "Clermont Solar Farm". WIRSOL. 2018-03-08. Retrieved 2018-11-30.
- "Development Pipeline". infigenenergy.com. Retrieved 2019-01-23.
- "Collinsville North Solar Farm". AltEnergy. Retrieved 2018-11-30.
- "Comet Solar Farm". POWER PLANTS. Retrieved 2018-11-30.
- "Hadstone's 309 MWp "Comet" Solar Farm approved in Queensland". www.linkedin.com. Retrieved 2018-11-30.
- "Columboola Solar Farm". AltEnergy. Retrieved 2018-11-30.
- "Adani presentation" (PDF). wcci. wcci. Retrieved 2019-01-23.
- "RES Group". RES. RES. Retrieved 2019-01-21.
- "Decision Notice" (PDF). WDRC. WDRC. Retrieved 2019-01-17.
- "Delga Solar Farm". AltEnergy. Retrieved 2018-11-30.
- "Desailly Renewable Energy Park" (PDF). MSC. Retrieved 2019-01-23.
- "Desailly Solar Queensland". DP Energy. Retrieved 2019-01-23.
- "Dingo Solar Farm". dingosolarfarm.com.au. Retrieved 2018-11-30.
- "New 11MW solar farm sets new benchmarks in Queensland". RenewEconomy. Retrieved 2019-01-21.
- "Dysart Solar Farm". Tilt Renewables. Retrieved 2018-11-30.
- "Dysart Solar Farm". AltEnergy. Retrieved 2018-11-30.
- "Notice about decision - Statement of reasons" (PDF). IRC. Isaac Regional Council. 20 December 2017. Retrieved 2019-01-16.
- "Press Release WDRC". WDRC. Retrieved 2018-11-30.
- "Decision Notice" (PDF). WDRC. Retrieved 2019-01-17.
- "PD On line". BRC. Retrieved 2019-01-21.
- "Gregory Solar Farm". AltEnergy. Retrieved 2019-01-10.
- "Gumlu solar farm proposal". North Queensland Register. Retrieved 2019-01-23.
- "SQ1 GREH – Gympie Regional Energy Hub – Lower Wonga". SolarQ. Retrieved 2018-11-30.
- "1.5 GW solar, 500 MWh battery project breaks ground in Queensland". pv magazine Australia. Retrieved 2019-07-19.
- "Sunshine Energy Projects". Sunshine Energy. Retrieved 2019-01-18.
- "Solar Energy in Australia | June 2019 | Aneroid". anero.id. Retrieved 2019-06-30.
- "Haughton solar farm". Pacific Hydro. Retrieved 2018-11-30.
- "Haughton Solar Farm Project" (PDF). Retrieved 1 July 2019.
- Parkinson, Giles (2019-05-29). "Two new solar farms connect to the grid in Queensland". RenewEconomy. Retrieved 2019-06-30.
- "Hughenden Sun Farm". POWER PLANTS. Retrieved 2018-11-30.
- "Technology". www.kcsf.com.au. Retrieved 2018-11-30.
- "Kennedy Energy Park". kennedyenergypark.com.au. Retrieved 2018-11-30.
- "Northern Star". northernstar.com.au. Retrieved 2019-01-18.
- "Koberinga Solar Farm". koberingasolarfarm.com.au. Retrieved 2018-11-30.
- "Lakeland Solar Farm". POWER PLANTS. Retrieved 2018-11-30.
- Parkinson, Giles (2019-03-12). "Lilyvale is latest large scale solar farm to begin production in Queensland". RenewEconomy. Retrieved 2019-06-30.
- "Home - Lilyvale Solar Farm". Lilyvale Solar Farm. Retrieved 2018-11-30.
- "longreach solar farm". longreach solar farm. Retrieved 2019-01-21.
- "EPBC Referral List". epbc. Retrieved 2019-01-23.
- "TCC DA" (PDF). TCC. Retrieved 2019-01-23.
- "Mareeba Secures permit". cleangen.com.au. Retrieved 2019-01-21.
- "Middlemont Sun Farm". overlandsunfarming.com.au. Retrieved 2019-01-21.
- "Mirani Solar Farm". miranisolarfarm.com.au. Retrieved 2018-11-30.
- "Moura Solar Farm". mourasolarfarm.com.au. Retrieved 2019-01-21.
- "Munna Creek Solar Farm". POWER PLANTS. Retrieved 2018-11-30.
- "Normanton Solar Farm". normantonsolarfarm. Retrieved 2019-01-21.
- "Council Meeting Minutes". WDRC. Retrieved 2019-03-26.
- Parkinson, Giles (2019-03-15). "Oakey solar farm begins production, second new plant in a week in Queensland". RenewEconomy. Retrieved 2019-06-30.
- "OAKEY". oakeysolarfarm.com.au. Retrieved 2018-11-30.
- "Daily Mercury". dailymercury.com.au. Retrieved 2019-01-23.
- "PD On line". BRC. Retrieved 2019-01-21.
- "Raglan Solar Farm". AltEnergy. Retrieved 2018-11-30.
- "Rodds Bay Solar Farm". WIRSOL. 2018-03-08. Retrieved 2019-07-19.
- "Rodds Bay Solar Farm". www.roddsbaysolarfarm.com. Retrieved 2019-01-21.
- "Project Summary". Rolleston Solar Farm. Retrieved 2018-11-30.
- "Rollingstone Solar Farm". rollingstonesolarfarm.com.au. Retrieved 2018-11-30.
- Parkinson, Giles (2019-05-29). "Two new solar farms connect to the grid in Queensland". RenewEconomy. Retrieved 2019-06-30.
- "Adani Australia". www.adaniaustralia.com. Retrieved 2018-11-30.
- "Solar Energy in Australia | December 2018 | Aneroid". anero.id. Retrieved 2019-06-30.
- Parkinson, Giles (2019-02-05). "Elliott Green Power opens Susan River solar farm, two more being built". RenewEconomy. Retrieved 2019-06-30.
- "Susan River Solar Farm". POWER PLANTS. Retrieved 2018-11-30.
- "Solar Farm overview". scrc. Retrieved 2019-01-23.
- "Tieri Solar Farm". reneweconomy.com.au. Retrieved 2019-01-23.
- "Wandoan Solar Project". WDRC decision notice. Retrieved 2019-01-10.
- "Warhook Solar Project" (PDF). WDRC decision notice. Retrieved 2019-01-10.
- "Warhook Solar Farm". ENGIE Australia and New Zealand. Retrieved 2019-07-19.
- Vorrath, Sophie (2019-04-18). "Work begins on Warwick solar farm – UQ's ticket to 100% renewables". RenewEconomy. Retrieved 2019-07-01.
- "Warwick Solar Farm". UQ. Retrieved 2019-01-18.
- webk. "Western Downs Green Power hub". Retrieved 2019-07-19.
- "Western Downs Green Power Hub". AltEnergy. Retrieved 2018-11-30.
- "Western Downs Green Power hub". westerndownsgreenpowerhub.com.au. Retrieved 2018-11-30.
- "Western Downs Solar Farm". Tilt Renewables. Retrieved 2018-11-30.
- "Home". Woolooga Energy Park. Retrieved 2018-11-30.
- "Home". Yarranlea. Retrieved 2019-01-18.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.