Line 4 (Ningbo Rail Transit)

Line 4 of Ningbo Rail Transit (Chinese: 宁波轨道交通4号线) is a rapid transit line in Ningbo. It starts from Cicheng Town, Jiangbei District, and ends near Dongqian Lake in Yinzhou District.[1] The project was approved on November 5, 2013[2] with the first phase opening on December 23, 2020. Construction of Line 4 started in 2011 with the groundbreaking of the North Ring Elevated Expressway with the second deck of the structure being used for Line 4 trains.[3] The rest of the line started construction on November 30, 2015.[4] The line will initially use 36 sets of six car B-type trains with a maximum service speed of 80 km/h.[5][6]

Line 4
 4 
Overview
StatusOperational
OwnerNingbo
LocaleNingbo, Zhejiang, China
TerminiCicheng
Dongqian Lake
Stations25
Service
TypeRapid transit
SystemNingbo Rail Transit
Operator(s)Ningbo Rail Transit Co.,Ltd.
History
Opened23 December 2020
Technical
Line length36.11 km (22.44 mi)
Number of tracks2
CharacterUnderground / Elevated
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationOverhead lines, 1,500 V DC with third rail return

Route

Line 4 starts from Cicheng Station in Cicheng Town in east-west direction as an elevated line. Then it turns south into the North Outer Ring Expressway where it turns east-west running under the elevated expressway forming a three level structure similar to the northern section of Shanghai Metro Line 1.[3] After reaching Jiangbei Avenue, it starts to turn underground and deviates from the viaduct to Zhuangqiao Railway Station where it turns south, crosses Yaojiang River and reaches Ningbo Railway Station. Then Line 4 goes along Changchun Road, Xingning Road until it reaches Canghai Road and become north-south again. After reaching Shounan Road it turns into southeast direction and reaches Dongqian Lake, its destination.[1]

Stations

Station name[note 1] Connections Location
English Chinese
Cicheng 慈城 Jiangbei
Guanshanhe 官山河
Changxing Road 长兴路
Jinshan Road 金山路
Olympic Sports Center 奥体中心
Hongtang Middle Road 洪塘中路
Hongda Road 洪大路
Zhuangqiao railway station 庄桥火车站
Lijiang Road 丽江路
Shuangdong Road 双东路
Cuibaili 翠柏里  6  Haishu
Daqing Bridge 大卿桥  1 
Liuxi 柳西
Ningbo Railway Station 宁波火车站  2 
Xingning Bridge West 兴宁桥西
Xingning Bridge East 兴宁桥东 Yinzhou
Baihe 白鹤
Children's Park 儿童公园  3 
Ailiu 矮柳
Panhuo Road 潘火路
Songjiang East Road 嵩江东路
South Higher Education Park 南高教园区  5 
Jinda South Road 金达南路
Xiaoyangjiang 小洋江  7 
Dongqian Lake 东钱湖
  1. Station names might be changed in construction.

References

  1. Ningbo Environment Protection Design Group. Report of Environment Impact of Line 4, Ningbo Rail Transit. Ningbo. November 2014.
  2. "《宁波市城市轨道交通近期建设规划(2013-2020年)》获国家批复". 2013-11-09. Archived from the original on 2013-11-09. Retrieved 2018-01-19.
  3. 1726. "宁波北外环快速路高架上开建轨道交通-北外环,宁波,快速路,轨道交通-中国宁波网-新闻中心". news.cnnb.com.cn. Retrieved 2018-01-19.CS1 maint: numeric names: authors list (link)
  4. 665. "又一条地铁来了!宁波轨交4号线今开工 工期5年_中国宁波网_特别推荐". news.cnnb.com.cn. Retrieved 2018-01-19.CS1 maint: numeric names: authors list (link)
  5. "宁波市轨道交通4号线工程设计总体总包(SJ4001标段)(勘察设计)招标公告". 2014-02-01. Archived from the original on 2014-02-01. Retrieved 2018-01-19.
  6. "宁波市公共资源交易中心". archive.is. 2017-06-11. Archived from the original on 2017-06-11. Retrieved 2018-01-19.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.