Line 2 (Xiamen Metro)
Line 2 of the Xiamen Metro is a subway line in Xiamen. The line running from Wuyuanwan to Tianzhushan, has 32 stations and is 41.64 kilometres (25.87 mi) long.[2] It was opened on December 25, 2019.[1]
Line 2 | |||
---|---|---|---|
2 | |||
Overview | |||
Status | In operation | ||
Locale | Xiamen, Fujian, China | ||
Termini | Wuyuanwan Tianzhushan | ||
Stations | 32 (29 in operation[lower-alpha 1]) | ||
Service | |||
Type | Rapid transit | ||
System | Xiamen Metro | ||
History | |||
Opened | 25 December 2019[1] | ||
Technical | |||
Line length | 41.64 km (25.87 mi)[2] | ||
Number of tracks | 2 | ||
Character | Underground | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
Operating speed | 80 km/h (50 mph) | ||
|
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Wuyuanwan — Tianzhushan | 25 December 2019[1] | 41.64 km (25.87 mi)[2] | 29[lower-alpha 1] | Phase 1 & 2 |
Stations
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Tianzhushan | 天竺山 | Haicang | ||||
Dongfu | 东孚 | |||||
Dongyao[lower-alpha 1] | 东瑶 | |||||
Dingmei[lower-alpha 1] | 鼎美 | |||||
Maluan Center[lower-alpha 1] | 马銮中心 | |||||
Xinyang Avenue | 新阳大道 | |||||
Xin'an | 新垵 | |||||
Wengjiao Road | 翁角路 | |||||
Maqing Road | 马青路 | |||||
Haicang Administrative Center | 海沧行政中心 | |||||
Haicang Business Center | 海沧商务中心 | |||||
Haicang Bay Park | 海沧湾公园 | |||||
Cruise Center | 邮轮中心 | Siming | ||||
Jianye Road | 建业路 | |||||
Hubin Middle Road | 湖滨中路 | |||||
Sports Center | 体育中心 | |||||
Yuxiu East Road | 育秀东路 | |||||
Lücuo | 吕厝 | 1 | ||||
Jiangtou | 江头 | |||||
Houpu | 后埔 | |||||
Caitang | 蔡塘 | Xiamen BRT | ||||
Gudishi | 古地石 | |||||
Lingdou | 岭兜 | |||||
Software Park Phase II | 软件园二期 | |||||
Hecuo | 何厝 | |||||
Guanyinshan | 观音山 | |||||
Dongzhai | 东宅 | Huli | ||||
Cross-Strait Financial Center | 两岸金融中心 | |||||
Wutong | 五通 | |||||
Wetland Park | 湿地公园 | |||||
Zhongzhai | 钟宅 | |||||
Wuyuanwan | 五缘湾 | |||||
- Dongyao, Dingmei, and Maluan Center stations are not opened.
Construction mishap
In mid-December 2019, construction works near the Siming District were affected by subsidence. A major water pipe burst, and dirty water flooded the construction site, affecting the concourse, platform and metro lines under construction. The subsidence also caused a collapse of the surface road and a resulting crater of approximately 500 square metres (5,400 sq ft). The cause is believed to be a burst water pipe. Water also penetrated the now-opened Lücuo station of Line 1, and flooded the concourse and platform.[3]
References
- "厦门地铁2号线开通运营时间 起点终点路线站点图完整版". 2019-12-20.
- "厦门地铁2号线全线"轨通"!预计年底前开通试运营". 2019-05-13.
- https://news.ltn.com.tw/news/world/breakingnews/3007554
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.