Line 1 (Jinan Metro)
Jinan Metro Line 1 (Chinese: 济南地铁1号线; pinyin: Jǐnán Dìtiě Yī Hào Xiàn) is a rapid transit line in Jinan, China. The line uses four-car Type B rolling stock, with an option to expand to six-car Type B in the future.
Line 1 | |
---|---|
Overview | |
Other name(s) | R1 (construction name) |
Locale | Jinan |
Termini | Fangte Gongyanyuan |
Stations | 11 |
Service | |
Type | Rapid transit |
System | Jinan Metro |
Rolling stock | 4-car Type B |
History | |
Opened | April 1, 2019 |
Technical | |
Line length | 26.27 kilometres (16.32 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Operating speed | 100 km/h (62 mph) |
Line 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The line began operating on April 1, 2019.[1]
Timeline
Segment | Opened | Length | Station(s) | Name |
---|---|---|---|---|
Fangte — Gongyanyuan | 1 April 2019 | 26.27 km | 11 | Phase 1 |
Stations
Station Name | Connections | Distance km | |||||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
Fangte | 方特 | ||||||
Jinan West Railway Station | 济南西站 | JGK 6 (planned) |
|||||
Dayang | 大杨 | 4 (planned) | |||||
Wangfuzhuang | 王府庄 | 2 (under construction) | |||||
Yufuhe | 玉符河 | ||||||
Zhaoying | 赵营 | ||||||
Ziweilu | 紫薇路 | ||||||
Daxuecheng | 大学城 | ||||||
Yuanboyuan | 园博园 | ||||||
Chuangxingu | 创新谷 | ||||||
Gongyanyuan | 工研院 | ||||||
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.