Line 1 (Chongqing Rail Transit)

Line 1 of CRT runs westwards from Chaotianmen to Bishan. Line 1 began operation on 28 July 2011.[2]

Line 1
 1 
Overview
TerminiChaotianmen
Bishan
Stations25
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit Corporation Limited
Daily ridership690,000 (2016 Peak)[1]
History
Opened28 July 2011 (2011-07-28)
Technical
Line length43.71 km (27.16 mi)
Operating speed100 km/h (62 mph) (peak)
Route map

Chaotianmen
Xiaoshizi
 6 
Jiaochangkou
 2 
Qixinggang
 10 
Lianglukou
 3 
Eling
Daping
 2 
Shiyoulu
Xietaizi
 5 
Line 5 to North Yuegang Road
Shiqiaopu
 5 
Gaomiaocun
Line 5 to Tiaodeng
Majiayan Depot
Majiayan
Xiaolongkan
 9 
Shapingba
 Loop   9 
Yanggongqiao
Lieshimu
Ciqikou
Shijingpo
Shuangbei
Zhongliang Mts.
Laijiaqiao Depot
Laijiaqiao
Weidianyuan
Chenjiaqiao
Daxuecheng
Jiandingpo
Jinyun Mts.
Bishan
 S2 
Bishan Depot
Line S2 to Jinlong
=
Virtual interchange: transport
card only, re-entry required.

Line 1 runs 16.4 km (10.2 mi) from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of 22.4 km (13.9 mi). It is the city's first all-heavy rail subway line and the second completed in Western China. Passenger capacity of the line is 36,000 passengers/hour/direction.

In 1992, the Chongqing government had signed a Build-Operate-Transfer in 1992 with a Hong Kong company, and provided the land for the project, but work ceased in 1997 due to legal issues. Work resumed on the first stretch of the line (from Chaotianmen to Shapingba) on 9 June 2007, and opened to limited operation on July 28.[3] An extension from Shapingba to Daxuecheng (University Town) began in 2009 and opened on December 21, 2012 before receiving a short extension from Daxuecheng to Jiandingpo a year later. And an extension, running from Jiandingpo to Bishan also opened on December 30, 2019, making Line 1 the first CRT line to reach areas outside Metropolitan Chongqing.[4] The latest extension from Xiaoshizi to Chaotianmen has been opened on 31 December 2020, making Line 1 a completely finished subway line.

Line 1 has 25 stations, including from east to west: Chaotianmen, Xiaoshizi, Jiaochangkou, Qixinggang, Lianglukou, Eling, Daping, Shiyoulu, Xietaizi, Shiqiaopu, Gaomiaocun, Majiayan, Xiaolongkan, Shapingba, Yanggongqiao, Lieshimu, Ciqikou, Shijingpo, Shuangbei, Laijiaqiao, Weidianyuan, Chenjiaqiao, Daxuecheng (University Town), Jiandingpo and Bishan stations.

Line 1 has transfer interchange stations with Line 6 at Xiaoshizi and Line 2 at Jiaochangkou in Jiefangbei CBD and at Daping and Line 3 at Lianglukou, which is near Chongqing railway station in central Yuzhong. Line 1 is also transferable with the Loop Line at Shapingba, although out-of-station transfer is currently needed due to construction setbacks on the interchange channel and concourse connecting the two subway lines.

Opening timeline

SegmentCommencementLengthStation(s)Name
Jiaochangkou Shapingba 28 July 2011 14.2 km (8.82 mi) 11 Phase 1 (initial section)
Xiaoshizi Jiaochangkou 27 September 2011 1.4 km (0.87 mi) 1 Phase 1 (final section)
Gaomiaocun 17 November 2011 Infill station 1
Shapingba Daxuecheng 20 December 2012 19.7 km (12.24 mi) 7 Phase 2 (initial section)
Weidianyuan 28 March 2013 Infill station 1
Majiayan 25 September 2013 Infill station 1
Shijingpo 28 September 2014 Infill station 1
Daxuecheng Jiandingpo 30 December 2014 1.9 km (1.18 mi) 1 Phase 2 (final section)
Jiandingpo Bishan 30 December 2019[5] 5.6 km (3.48 mi)[4] 1 Western extension
Xiaoshizi Chaotianmen 31 December 2020 0.8 km (0.50 mi)[6] 1 Ext. to Chaotianmen

Service routes

Current stations

Service
routes
Station
Station name Connections Distance
km
Location
English Chinese
1/01 Chaotianmen 朝天门 0.00 0.00 Yuzhong
1/02 Xiaoshizi 小什字  6  0.66 0.66
1/03 Jiaochangkou 较场口  2  1.36 2.02
1/04 Qixinggang 七星岗  10  0.85 2.87
1/05 Lianglukou 两路口  3  CQW 1.44 4.30
1/06 Eling 鹅岭 1.60 5.90
1/07 Daping 大坪  2  1.73 7.63
1/08 Shiyoulu 石油路 1.16 8.79
1/09 Xietaizi 歇台子  5  1.03 9.82 Jiulongpo
1/10 Shiqiaopu 石桥铺  5  1.25 11.07
1/11 Gaomiaocun 高庙村 1.68 12.75 Shapingba
1/12 Majiayan 马家岩 1.20 13.95
1/13 Xiaolongkan 小龙坎  9  1.09 15.03
1/14 Shapingba 沙坪坝  9   Loop  [lower-alpha 1] CYW 0.87 15.90
1/15 Yanggongqiao 杨公桥 1.17 17.08
1/16 Lieshimu 烈士墓 0.82 17.90
1/17 Ciqikou 磁器口 1.05 18.95
1/18 Shijingpo 石井坡 1.40 20.35
1/19 Shuangbei 双碑 1.90 22.25
1/20 Laijiaqiao 赖家桥 7.00 29.25
1/21 Weidianyuan 微电园 1.77 31.02
1/22 Chenjiaqiao 陈家桥 3.35 34.37
1/23 Daxuecheng 大学城 1.90 36.27
1/24 Jiandingpo 尖顶坡 1.55 37.81
1/25 Bishan 璧山  S2  (Bitong line)
 27 [7]
5.90 43.71 Bishan
  1. Out of system transfer via Shapingba (Loop line)

Notes

    References

    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.