Line 1 (Changchun Subway)
Line 1 of the Changchun Subway (Chinese: 长春轨道交通1号线; pinyin: Chángchūn Guǐdào Jiāotōng Yī Hào Xiàn) is a rapid transit line running from north to south Changchun. It opened on 30 June 2017. This line is 18.14 km long with 15 stations.[1][2]
Line 1 | |
---|---|
1 | |
Northeast Normal University Station | |
Overview | |
Status | Operational |
Owner | Changchun |
Locale | Changchun, Jilin, China |
Termini | North Huancheng Road Hongzuizi |
Stations | 15 |
Service | |
Type | Rapid transit |
System | Changchun Subway |
Services | 1 |
Operator(s) | Changchun Rail Transit Corporation |
History | |
Opened | 30 June 2017 |
Technical | |
Line length | 18.14 km (11.27 mi)[1] |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
North Ring Road — Hongzuizi | 30 June 2017 | 18.14 km (11.27 mi)[1] | 14 | Phase 1 |
Changchun Railway Station | 26 January 2019 | infill station | 1 |
Service routes
- North Huancheng Road — Hongzuizi
Stations
Station name | Connections | Distance km |
Location | ||||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
North Huancheng Road | 北环城路 | 8 | 0.00 | 0.00 | Kuancheng | ||
Qingfeng Road | 庆丰路 | 1.19 | 1.19 | ||||
Yikuang Street | 一匡街 | 1.31 | 2.50 | ||||
Changchun Railway Station (North) | 长春站北 | CJ ~ JH CB ~ BA CCT 4 |
1.12 | 3.62 | |||
Changchun Railway Station | 长春站 | CJ ~ JH CB ~ BA CCT 3 [lower-alpha 1] |
0.75 | 4.37 | |||
Shengli Park | 胜利公园 | 0.93 | 5.30 | ||||
Renmin Square | 人民广场 | 1.42 | 6.72 | Chaoyang / Nanguan | |||
Jiefang Avenue | 解放大路 | 2 | 1.00 | 7.72 | |||
Northeast Normal University | 东北师大 | 1.57 | 9.29 | ||||
Gongnong Square | 工农广场 | 1.44 | 10.73 | ||||
Fanrong Road | 繁荣路 | 1.23 | 11.96 | ||||
Weixing Square | 卫星广场 | 3 | 0.80 | 12.76 | Nanguan | ||
Municipal Government | 市政府 | 1.48 | 14.24 | ||||
Huaqing Road | 华庆路 | 1.09 | 15.33 | ||||
Hongzuizi | 红嘴子 | 1.08 | 16.41 | ||||
- Out of station transfer.
References
- "长春地铁1号线通车试运营". 2017-06-30.
- "长春地铁1号线达到试运营评估8个标准要求". Xinhua. Xinhua. 23 May 2017. Retrieved 7 June 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.