Line 17 (Chengdu Metro)
Line 17 of the Chengdu Metro is an express subway line currently under construction in Chengdu. The whole line is 50.945 km. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.[3]
Chengdu Metro Line 17 | |
---|---|
17 | |
Line 17 platform at Fengxihe station | |
Overview | |
Status | Operational |
Owner | City of Chengdu |
Locale | Chengdu, Sichuan |
Termini | Jinxing Jitouqiao |
Service | |
Type | Rapid transit |
System | Chengdu Metro |
Operator(s) | Chengdu Metro Corporation |
Depot(s) | Yongyi Depot (永义车辆段) Wutongmiao Temple Depot(五桐庙停车场) |
History | |
Planned opening | 18 December 2020[1] |
Technical | |
Line length | 26.15 km (16.2 mi) (in operation) |
Number of tracks | 2 |
Character | underground and elevated |
Electrification | overhead lines, 1,500 V DC |
Operating speed | 140km/h[2] |
Phase 1 will run from Jinxing Station in Wenjiang District to Jitouqiao Station in Wuhou District Phase 1 is 26.145 km long with 5.5 km running elevated and 20.6 km running underground. There are 9 stations with 2 elevated stations and 7 underground stations.[4][5]
Phase 2 extends the line west across central Chengdu to Gaohongcun Station. It is 24.8 km long, all underground with 18 additional stations.[6]
After the completion of the second phase, the first phase will retain the Jiujiang North-Jitouqiao section, and Line 17 will become an express line that runs through the center of Chengdu city and connects the southwest to the northeast, passing through Shuangliu, the center of Chengdu city, and Qingbaijiang. The whole line is 81.48 km with 29 stations. The average station spacing is 2.91 km.
Progress
- On February 23, 2017, Sichuan Development and Reform Commission approved Line 17 Phase 1.[7]
- On February 27, 2017, Line 17 Phase 1 started construction.[8][9]
- On Nov 11 2017, the first tunnel boring machine started digging section between Jiujiangbe and Bafoqiao Stations.[10]
- On March 24, 2019, Line 17 phase 1 elevated section was completed.
- On April 9, 2019, Yellowstone-Chengdu Fifth People's Hospital, Mingguang-#1 Vent Tunnel sections are completed. They are the first tunnel sections to be completed.
- On August 5, 2019, main structures of all stations on Line 17 was completed.[11]
- On Jan 7 2020, Line 17 Phase 2's Beimenqiao Station started excavation, marking the start of station construction for Phase 2.
- On March 25, 2020, Line 17 Phase 1 finished track-laying.[12]
- On June 19, 2020, Chengdu Metro started 3-month trial operation for Line 17.[13]
- On June 24, 2020, Construction finished for Wutongmiao Temple Depot (五桐庙停车场) for Line 17.[14]
- On December 18, 2020, Line 17 from Jinxing station to Jitouqiao station was opened.
Operation
Line 17 Phase 1 and Line 19 Phase 1 will be running in connection as one route.
Stations
Station name | Transfer | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Jinxing | 金星 | -- | 0.000 | Wenjiang | ||
Huangshi | 黄石 | 4.280 | 4.280 | |||
Chengdu Fifth People's Hospital | 市五医院 | 2.962 | 7.242 | |||
Fengxihe | 凤溪河 | 4 | 1.851 | 9.093 | ||
Wenquan Avenue | 温泉大道 | 2.038 | 11.131 | |||
Mingguang | 明光 | 1.974 | 13.105 | |||
Jiujiang North | 九江北 | 6.641 | 19.746 | Shuangliu | ||
Baifoqiao | 白佛桥 | 4.179 | 23.925 | Wuhou | ||
Jitouqiao | 机投桥 | 9 | 1.468 | 25.393 | ||
References
- "12月18日五线齐发,成都轨道交通运营里程突破500公里!".
- "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
- "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
- "地铁19号线一期" (in Chinese). 成都地铁. 2017-10-16. Retrieved 2017-10-16.
- "轨道交通17号线一期". Retrieved 2018-04-04.
- "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
- "成都轨道交通11号线一期、17号线一期工程可研报告获批" (in Chinese). 四川新闻网. 2017-02-23. Retrieved 2017-02-23.
- 成都地铁17号线一期开建 预计2020年通车_网易新闻. news.163.com. Retrieved 2018-08-19.
- "成都地铁17号线一期开建 预计2020年通车" (in Chinese). 网易. 2017-02-28. Archived from the original on 2018-05-08. Retrieved 2017-02-28.
- "串联温江、武侯和双流 成都地铁17号线开始"打洞"" (in Chinese). 四川在线. 2017-11-29. Retrieved 2017-11-29.
- "成都地铁17号线一期全线车站封顶" (in Chinese). 成都市温江区人民政府. 2019-08-07.
- "成都轨道交通17号线一期"长轨通" 温江将迎双地铁时代".
- "即将开启空载调试、空载试运行 成都地铁9号线、17号线离开通也近了!".
- "成都地铁17号线列车有家啦!五桐庙停车场主体工程完工".
- "成都地铁17号线"最难建段"开始掘洞" (in Chinese). 四川在线. 2018-03-29. Retrieved 2018-03-29.