Kanpur Metro

Kanpur Metro is a rail-based mass transit system which is under construction for the city of Kanpur, India, and extendable to the Kanpur metropolitan area. The feasibility study for the project was done by RITES in June 2015 . The study was prepared to control traffic woes and congestion, which are hampering the growth, development, and prosperity of the city area. The tenders were floated for the priority section of corridor-1 of phase-1 between IIT to Motijheel. AFCONS Infra has been awarded the tender. Elevated viaduct work has begun, more than half of total pillars have been constructed and work of all the stations till motijheel have started . The pier caps and U girders are being erected and construction work is going in full swing. The priority section of corridor-1 is expected to be operational from December 2021 which will become the fastest built and commissioned metro system in the world. On 28 February 2019, the Central government approved the metro project for Kanpur at an estimated cost of ₹11,076.48 crores and a five-year time limit.[2][3] The European Investment Bank has proposed to provide a €650 million loan for the project.[4]

Kanpur Metro
UPMRC logo
Overview
Owner Uttar Pradesh Metro Rail Corporation
LocaleKanpur, Uttar Pradesh, India
Transit typeRapid transit
Number of lines2 (Approved & Under construction, Phase I, Corridor I & II)
Number of stations30 (Approved, Phase I, 23 stations in a 23.785 km stretch and 8 stations in 8.6 km stretch)
HeadquartersUttar Pradesh Metro Rail Corporation, Administrative Headquarters, Vipin Khand, Gomti Nagar, Lucknow 226010
Operation
Began operationDecember 2021
Train length3 coaches
Headway3 minutes
Technical
System length34.78 km (21.61 mi)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification750 Volts DC [1]third rail
Top speed80 km/h
System map

Route Network

In Phase 1, 22 metro stations will be built on first corridor (Red Line) from IIT Kanpur to Naubasta and 8 metro stations will be built on second corridor (Blue Line) from Agriculture University to Barra-8.[5]

Red Line (IIT Kanpur - Naubasta)

Length: 23.785 km

Alignment: Elevated (15.164 km) & Underground (8.621 km)

No. of Stations: 23

Stations:

  • IIT Kanpur
  • Kalyanpur Railway Station
  • SPM Hospital
  • University
  • Gurudev Chauraha
  • Geeta Nagar
  • Rawatpur Railway Station
  • LLR Hospital
  • Motijheel
  • Eidgah
  • Chunniganj
  • Naveen Market
  • Bada Chauraha
  • Phool Bagh
  • Nayaganj
  • Kanpur Central Railway Station
  • Jhakarkatti Bus Terminal
  • Transport Nagar
  • Baradevi
  • Kidwai Nagar
  • Vasant Vihar
  • Baudh Nagar
  • Naubasta

Blue Line (CSA University - Barra 8)

Length: 8.6 km

Alignment: Elevated (4.3 km) & Underground (4.3 km)

No. of Stations: 8 (1 proposed)

Stations:

  • Agriculture University
  • Rawatpur
  • Kakadeo
  • Double Pulia
  • Vijay Nagar
  • Govind Nagar CTI (Proposed)
  • Shastri Chowk
  • Barra-7
  • Barra-8

Places of Tourist interest on Metro Alignment

  • King Edward Memorial Hall, Phool Bagh
  • Nana Rao Park, Bibighar Memorial Garden
  • Christ Church, Cawnpore Kotwali Heritage Building
  • LLJM Methodist Church
  • British India Corp. Lal Imli Mill
  • McRobert Hospital
  • Subedar Ka Talab Christian Cemetery, Chunniganj
  • Moti Jheel Parks and Gardens
  • JK Temple
  • Jhakarkatti Lake
  • Horsman Bagh, Kakomi Mills
  • Sanjay Van Forests, Mickey House

Cost

The cost of construction is estimated at ₹11,076.48 crores for two lines in Phase I. [2]

Status updates

  • Sept 2015: Proposed formation of Kanpur Metro Rail Corporation[6]
  • Nov 2015: Detailed project report prepared by LMRC and RITES is submitted to the state government.[7]
  • Feb 2016: State Government is planning to lay the foundation stone of Kanpur Metro in March 2016 after state cabinet approval.[8]
  • Feb 2016: It is expected that civil work on Kanpur metro will start by Dec 2016.[9]
  • Mar 2016: Uttar Pradesh government approves the detailed project report.[10]
  • Mar 2016: Japanese team inspected the metro route in the city. [11]
  • May 2016: EIB ready to fund city metro project[12]
  • 22 May 2016: Centre approves the plan for Kanpur metro [13]
  • 15 June 2016: Last date to submit logo for Kanpur Metro by KPMRC[14]
  • 20 July 2016: Scheduled inauguration of Kanpur Metro by Chief Minister of Uttar Pradesh which could not take place due to delay in giving NOCs various ministries under the Central Government.[15]
  • July 2017: Civil work started.[18]
  • September 2017: Civil engineering work comes to a halt. Central Govt has asked Kanpur Metro to rework the detailed project report and finances and asked to make it a public-private partnership model project.[19]
  • October 2017: Work on preparing new detailed project report started. The new report is to take approximately three months.[20]
  • January 2018: Uttar Pradesh government cabinet decides to build metro in Kanpur, Agra, and Meerut.[21]
  • Feb 2018: Work started in the metro yard. Tenders floated and which are to be opened in March 2018.[22]
  • Apr 2018: Center yet to approve of the Kanpur Metro project.[23]
  • Jun 2018: Tendering done but not awarded as a project with a new detailed project report is yet not approved by the central government.[24]
  • Jun 2018: Finance ministry gave its in-principle approval to Kanpur metro along with Agra, Meerut, Indore, and Bhopal.
  • Sep 2018: Detailed project report sent by Uttar Pradesh government to the central government.[25]
  • 4 Feb 2019: PIB approved Kanpur metro project funding.
  • 7 Feb 2019: Uttar Pradesh government has allocated 175 crores to start preliminary work in budget[26]
  • 28 February 2019: Centre approved Kanpur Metro costing ₹11076.48 crores with the time limit of 5 years in construction.[2]
  • 8 March 2019: PM Narendra Modi laid the foundation stone for this metro rail project[27]
  • 4 July 2019: LMRC invites tender for construction of elevated track and stations
  • 6 September 2019: Afcons Infra awarded tender to construct 9 stations along with tracks and elevated viaduct.
  • 20 September 2019: Afcons Infra and LMRC conduct a thorough route inspection from IIT to Moti Jheel for the construction of track and metro station.
  • 22 September 2019: LMRC razes the polytechnic hostels for depot construction[29]
  • 8 October 2019: LMRC and Afcons Infra begin with pillar construction for elevated track in front of the National Sugar institute[30]
  • 15 November 2019: Yogi Aditya Nath, the CM of Uttar Pradesh, formally inaugurates civil work for Kanpur Metro [31]
  • 19 February 2020: Yogi Aditya Nath, the CM of Uttar Pradesh, allocates a budget of Rs 358 crores towards Kanpur metro phase 1. Construction is in full swing as UPMRC aims to complete phase 1 at a faster pace, as compared to Lucknow metro [32]
  • 20 February 2020: UPMRC invited bids for installation of Traction System (Package I & II)
  • 02 March 2020: Afcons Infra erected the first pier cap in record time. Construction is 3 months ahead as compared to Lucknow Metro, which is accredited with the title of being the fastest metro construction in India [33]
  • 13 March 2020: UPMRCL opened bids for the General Consultant contract to reveal a total of 2 bidders[34]
  • 15 June 2020: TYPSA - Italferr JV wins the General Consultant contract for Kanpur Metro[35]
  • 15 July 2020: UPMRC floats tenders for construction of underground section till Nayaganj.
  • 24 July 2020: UPMRC places a double T girder on IIT KANPUR METRO STATION.
  • 1 September 2020: EIB to invest 650mn euro in kanpur metro
  • 2 September 2020: Shapoorji Pallonji Group’s subsidiary Sterling & Wilson Pvt. Ltd. in a consortium with Russia’s GSC Construction Company Won Kanpur Metro’s 750 Volts DC Third Rail Electrification Bid for Corridor-1 & 2. [36]
  • 18 October 2020: 100th U-girder erected. A total of 638 U-girders are to be placed for the priority corridor between IIT Kanpur & Motijheel. [37]
  • 29 January 2021: 400 piers out of 513 piers for the priority corridor constructed. 332 T-girders constructed out of total number of 434 T-girders to be constructed for priority corridor. [38]

References

  1. https://themetrorailguy.com/2020/09/02/sterling-wilson-wins-kanpur-metros-third-rail-electrification-bid/
  2. "कैबिनेट ने कानपुर मेट्रो रेल परियोजना को मंजूरी दे दी". Navbharat Times (in Hindi). 28 February 2019. Retrieved 28 February 2019.
  3. "Adityanath thanks Modi for clearing Agra, Kanpur Metro projects". outlookindia.com/. Retrieved 28 February 2019.
  4. "EIB Evaluating €650 mn Loan for Kanpur Metro Phase 1". The Metro Rail Guy. 31 March 2020. Retrieved 2 April 2020.
  5. "Kanpur Metro – Information, Route Maps, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 18 September 2020.
  6. "RITES asked to make parking lot at every Metro station - TOI Mobile - The Times of India Mobile Site".
  7. "Kanpur Metro Report Submitted to Uttar Pradesh Government".
  8. IANS. "Kanpur Metro rail project to be launched by March".
  9. Rawat, Virendra Singh. "Kanpur, Varanasi metro rail projects could start by December 2016".
  10. "दिल्ली में दौड़ने लगी कानपुर मेट्रो की फाइल - Kanpur City News".
  11. "Japanese team inspected metro route in the city - Kanpur NYOOOZ".
  12. "EIB ready to fund city metro project - TOI Mobile - The Times of India Mobile Site".
  13. "Centre approves plan for Varanasi and Kanpur metro - The Economic Times".
  14. Era's, Creativ. "Kanpur Development Authority - Tenders".
  15. "कानपुर में 20 जुलाई को मेट्रो परियोजना का शिलान्यास करेंगे मुख्यमंत्री - Navbharat Times".
  16. "अक्टूबर में मेट्रो को सैद्धांतिक सहमति के आसार".
  17. "Akhilesh Yadav, Venkaiah Naidu lay foundation stone of Kanpur Metro Rail". The Hans India.
  18. "पिलर निर्माण का कार्य शुरू, 2021 में ट्रैक पर दौड़ेगी मेट्रो".
  19. "फिलहाल भूल जाइये मेट्रो, काम ठप- Amarujala".
  20. "पीपीपी मॉडल से मेट्रो चलाने को दोबारा सर्वे".
  21. "UP to Start Metro Services in Agra, Kanpur and Meerut".
  22. "कानपुर में मेट्रो दौड़ाने की तैयारी तेज, 30 मार्च को खुलेंगे टेंडर - Kanpur".
  23. "How Metro-morphosis is in works in Yogi Adityanath's Uttar Pradesh". 2 April 2018.
  24. https://www.jagran.com/uttar-pradesh/kanpur-city-work-of-kanpur-metro-will-start-after-getting-clearance-from-central-government-18039881.html
  25. https://www.moneycontrol.com/news/india/detailed-project-report-of-kanpur-agra-meerut-metro-sent-to-centre-2919871.html
  26. https://m.jagran.com/uttar-pradesh/lucknow-city-kanpur-and-agra-will-soon-get-access-to-metro-18928764.html
  27. "PM Narendra Modi laid the foundation stone". Retrieved 8 March 2019.
  28. https://timesofindia.indiatimes.com/city/kanpur/revised-metro-plan-spares-gsvm-bldgs/articleshow/70883460.cms
  29. https://epaper.jagran.com/epaper/22-sep-2019-64-kanpur-edition-kanpur-page-6.html
  30. https://epaper.jagran.com/mepaper/08-oct-2019-64-kanpur-edition-kanpur-page-5-page-5-page-5.html
  31. https://epaper.jagran.com/epaper/16-nov-2019-64-kanpur-edition-kanpur-page-6.html
  32. https://epaper.jagran.com/epaper/19-feb-2020-64-kanpur-edition-kanpur-page-6.html
  33. "Afcons Launches 1st Pier Cap for Kanpur Metro Line-1". The Metro Rail Guy. 3 March 2020. Retrieved 29 April 2020.
  34. "AECOM-led & TYPSA-led JVs Submit GC Bids for Kanpur & Agra Metros". The Metro Rail Guy. 29 April 2020. Retrieved 29 April 2020.
  35. "TYPSA-Italferr JV Wins Kanpur & Agra Metro's General Consultancy". The Metro Rail Guy. 15 June 2020. Retrieved 15 June 2020.
  36. https://themetrorailguy.com/2020/09/02/sterling-wilson-wins-kanpur-metros-third-rail-electrification-bid/
  37. Agarwal, Anshu. "Kanpur Metro: 100 U-girders erected under priority corridor stretch".
  38. Agarwal, Anshu. "UP Metro completes 400 piers of Priority Corridor".

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.