Kınalı-Balıkesir Motorway
The Kınalı-Tekirdağ-Çanakkale-Balıkesir Motorway (Turkish: Kınalı-Tekirdağ-Çanakkale-Balıkesir Otoyolu) is a planned 321km long motorway, with an 82 km (51 mi) section between Malkara and Çanakkale under construction. When complete, the route will cross the Dardanelles via the Çanakkale 1915 Bridge, connecting western Anatolia with East Thrace. The route will be first motorway in Turkey to connect Europe and Asia, outside of Istanbul.
Kınalı-Tekirdağ-Çanakkale-Balıkesir Otoyolu | |
Route information | |
---|---|
Length | 321 km (199 mi) |
Existed | 2017–present |
Major junctions | |
North end | O-3 near Silivri |
South end | O-5 near Balıkesir |
Location | |
Regions | Marmara |
Provinces | Istanbul, Tekirdağ, Çanakkale, Balıkesir |
Major cities | Tekirdağ, Gelibolu, Çanakkale, Balıkesir |
Highway system | |
Highways in Turkey |
Construction started on 18 March 2017 in Çanakkale, on the 102nd anniversary of the Turkish naval victory during the Dardanelles Campaign of World War I.[1] The entire motorway is expected to open in 2023.
Route
District | km | Type | Destinations | Notes |
---|---|---|---|---|
Silivri | 0 | Kınalı O-3 Interchange | O-3 E80 | |
Silivri | 1,2 | Silivri Prison Junction | ||
Silivri | 3,0 | Kınalı Junction | D.110 D.100 | |
4,4 | V1 Viaduct | 185 m | ||
Silivri | 13,0 | Çantaköy Junction | D.100 | |
16,5 | Motorway Service Area | 200.000 m² | ||
18,3 | V2 Viaduct | 524 m | ||
Marmaraereğlisi | 22,0 | Marmaraereğlisi Junction | D.567 | |
Marmaraereğlisi | 26,0 | Çorlu Airport Junction | D.100 | |
30,5 | Motorway Service Area | 40.000 m² | ||
Çorlu | 40,0 | Karatepe Junction | P.59-05 | |
41,5 | Cut-Cover Tunnel 1 | 500 m | ||
43,7 | V3 Viaduct | 1216 m | ||
46,5 | Motorway Service Area | 55.000 m² | ||
Tekirdağ | 54,0 | Tekirdağ East Junction | D.110 | |
Tekirdağ | 61,0 | Tekirdağ Junction | D.565 | |
61,8 | V4 Viaduct | 371 m | ||
Tekirdağ | 67,0 | Hayrabolu Junction | D.555 | |
69,5 | Motorway Service Area | 190.000 m² | ||
Tekirdağ | 74,0 | Tekirdağ West Junction | D.110 | |
76,7 | Cut-Cover Tunnel 2 | 500 m | ||
77,5 | T1 Tunnel | 1038 m | ||
91,2 | V5 Viaduct | 1084 m | ||
98,5 | Motorway Service Area | 50.000 m² | ||
Malkara | 108,0 | Malkara Junction | D.110 E84 | |
113,0 | Motorway Service Area | 50.000 m² | ||
115,3 | V6 Viaduct | 1078 m | ||
140,0 | Motorway Service Area | 160.000 m² | ||
Gelibolu | 147,0 | Bolayır Junction | D.550 E87 E90 | |
148,0 | V7 Viaduct | 183 m | ||
Gelibolu | 162,0 | Gelibolu Junction | D.550 | |
168,3 | V8 Viaduct | 863 m | ||
173,0 | Gelibolu Pay Toll | |||
175,0 | Motorway Service Area | 160.000 m² | ||
Gelibolu | 178,0 | Gelibolu South Junction | D.550 | |
179,0 | Çanakkale 1915 Bridge Pay Toll | |||
180,4 | Çanakkale 1915 Bridge West Approach Viaduct | |||
Çanakkale 1915 Bridge | 3.869 m | |||
185,0 | Çanakkale 1915 Bridge East Approach Viaduct | |||
Lapseki | 183,5 | Çanakkale Junction | D.200 E90 | |
186,5 | Çanakkale Pay Toll | |||
187,4 | V9 Viaduct | 690 m | ||
188,5 | Motorway Service Area | 100.000 m² | ||
Lapseki | 190,0 | Çanakkale-2 Junction | D.200 | |
191,8 | V10 Viaduct | 1650 m | ||
201,3 | T2 Tunnel | 895 m | ||
202,5 | V11 Viaduct | 510 m /300 m (right) | ||
215,5 | Motorway Service Area | |||
220,7 | T3 Tunnel | 1830 m | ||
225,0 | V12 Viaduct | 330 m | ||
Çan | 241,0 | Çan Junction | D.210 | |
242,5 | Motorway Service Area | |||
243,8 | V13 Viaduct | 360 m | ||
247,6 | V14 Viaduct | 360 m | ||
248,4 | V15 Viaduct | 390 m | ||
248,8 | V16 Viaduct | 300 m | ||
250,1 | V17 Viaduct | 360 m | ||
250,7 | V18 Viaduct | 390 m | ||
252,3 | T4 Tunnel | 990 m | ||
Yenice | 259,5 | Yenice Junction | D.555 | |
267,0 | T5 Tunnel | 2045 m | ||
270,6 | V19 Viaduct | 330 m | ||
272,9 | V20 Viaduct | 300 m | ||
275,5 | Motorway Service Area | |||
284,4 | V21 Viaduct | 450 m | ||
284,9 | V22 Viaduct | 150 m | ||
285,1 | V23 Viaduct | 210 m | ||
285,8 | V24 Viaduct | 175 m | ||
286,5 | V25 Viaduct | 140 m | ||
286,8 | V26 Viaduct | 240 m | ||
296,9 | V27 Viaduct | 1300 m | ||
299,9 | V28 Viaduct | 1575 m | ||
303,8 | V29 Viaduct | 630 m | ||
Balya | 305,0 | Balya Junction | D.555 | |
310,3 | V30 Viaduct | 105 m | ||
311,0 | V31 Viaduct | 960 m | ||
312,5 | Motorway Service Area | |||
Balıkesir | 321,0 | Balıkesir Junction | O-5 E881 | |
References
- "Groundbreaking ceremony for bridge over Dardanelles to take place on March 18". Hürriyet Daily News. 2017-03-17. Retrieved 2017-03-19.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.