Intercity Railway Connector
The Intercity Railway Connector (Chinese: 城际铁路联络线; pinyin: Chéngjì Tiělù Liánluòxiàn),[lower-alpha 1] also known as Line S7 in the Beijing Metropolitan Area Railway planning, is a railway line currently under construction. The speed will be 200 km/h.[1] It will connect the Beijing Capital International Airport and Beijing Daxing International Airport when the full line is completed.[2]
Intercity Railway Connector[lower-alpha 1] 城际铁路联络线 | |
---|---|
Overview | |
Status | Under construction |
Locale | Beijing and Hebei |
Termini | Daxing Airport Langfang East (Phase 1) |
Service | |
Operator(s) | China Railway Beijing Group |
Technical | |
Line length | 39.438 km (Phase 1) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Operating speed | 200 km/h[1] |
Phase 1 of the railway, which is currently under construction, will connect Langfang (a city in Hebei Province) and Beijing Daxing International Airport. Phase 1 is 39.438 km, including 15.3 km in Beijing and 24.138 km in Hebei Province.[2]
Phase 1 of the railway will be finished in December 2022.[1]
Stations
Phase 1 (under construction)
Phase 1 of the railway (Daxing Airport to Langfang East) is shared with the Langzhuo (Langfang–Zhuozhou) intercity railway (Chinese: 廊涿城际铁路).
Station Name[2] | Total distance (km) | Travel Time | Transfer | Location | |
---|---|---|---|---|---|
English | Chinese | ||||
Daxing Airport | 大兴机场 | PKX Jingxiong Daxing Airport | Guangyang District, Langfang, Hebei[lower-alpha 2] | ||
Xinhangcheng | 新航城 | Daxing District, Beijing | |||
Konggangxinqu | 空港新区 | Guangyang District, Langfang, Hebei | |||
Langfang East | 廊坊东 | ||||
Phase 2 (under planning)
Station Name[1] | Total distance (km) | Travel Time | Transfer | Location | |
---|---|---|---|---|---|
English | Chinese | ||||
Caiyu | 采育 | Daxing District, Beijing | |||
Yizhuang East | 亦庄东 | Tongzhou District, Beijing | |||
Shiyuan | 施园 | 7 Batong (Hua Zhuang station) | |||
Beijing Sub-Center | 北京城市副中心 | Jingtang 6 (Beiyunhe East station) | |||
Xuxinzhuang | 徐辛庄 | ||||
Beijing Capital Airport (Terminal 3) | 首都机场(T3航站楼) | PEK Capital Airport | Shunyi District, Beijing | ||
Nanfaxin | 南法信 | 15 | |||
Notes
References
- "北京新建城际铁路联络线或延迟至2022年底竣工". www.bjnews.com.cn. 2019-02-18. Retrieved 2019-02-21.
- "京津冀城际联络线一期环评全本发布 城市副中心可直达雄安新区". 2018-06-06. Retrieved 2019-08-09.