Indian locomotive class WAG-11
The Indian locomotive class WAG-11 is a class of twin-section 25 kV AC electric locomotives that was developed in 2018 by Banaras Locomotive Works (BLW), Varanasi for Indian Railways. The model name stands for broad gauge (W), Alternating Current (A), Goods traffic (G), and 11th in series (11). They entered trials service in 2019. A total of 3 WAG-11 pairs have been built by Banaras Locomotive Works (BLW), Varanasi.
WAG-11 | |||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
BNDM based WAG-11 #29001 | |||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||
currently undergoing trials |
As of January 2020, 3 locomotives are built and are undergoing "testing", with further examples being converted from WDG-4 to WAG-11.
History
The history of WAG-11 begins in the early 2017 with the stated aim of the Indian Railways to minimize the dependence on diesel locomotives in Indian Railways after recommendation of Cabinet Committee on Economic Affairs (CCEA).[1][2] The committee recommended that Expansion of electrified routes across the country will also help in reducing energy cost.[3] Therefore a large number of WDG-4 diesel locomotives would become surplus after full electrification.[4] Thus Indian Railways decided to convert existing WDG-4 locomotives which needed midlife overhaul into the WAG-11 electric locomotive class.
The same old GT46MAC (WDG-4) traction motors are being used for WAG11. The locomotives had GTO propulsion, a few parts can not be leveraged for the rebuilt to IGBT technology. However since the power supply now comes from the WAG9 transformer / control, ABB has been updating its WAG9 control software for the EMD 3 phase traction motors for best results.[5] As a result the diesel power pack of the locomotive will be decommissioned and used as spare parts for interim use since there are still 150+ more GTO WDG-4 in use.
The First WAG-11 unit was allocated TKD for trials and performance monitoring.[6] They are fitted with high rise pantographs and have regenerative braking. [7] After initial testing another unit was built and these 2 locomotives were transferred to Bondamuda (BNDM) for examining working conditions hauling heavy load goods trains. [8] The third prototype 29003 came out of DLW shop but this one is different from the previous two because both the locos have twin cabs and twin pantographs. It looks like they can be separately operated like any regular WAG-9. Also the height and construct of these two locos are extremely similar to WAG9s.
Difference
There are quite a few differences between the two earlier prototypes of WAG11 and 29003. They are in the following lines:[9]
- Instead of an articulated design, DLW made both locos as twin cab locos (they may be able to independently operated after decoupling)
- Two pantographs each on both the locos - making is 4 pantographs for 29003 unit
- The loco shell is placed at the same height as a WAP7/WAG9 and is carefully covering the chassis. In earlier versions, the EMD chassis / under-frame was used and was visible. 29003 almost looks like it is made on WAG9 chassis / under-frame and EMD bogies/traction motors have been used.
- The cow-catcher is new and of typical WAP7/WAG9 net design. The solid EMD cowcatcher has been discontinued.
- On top of the cabs, either a dynamic brake radiator or rooftop AC has been installed.
Units
No | Current class | locomotive number | Previous class and Road no | Previous shed | Status |
---|---|---|---|---|---|
1 | WAG-11 | 29001 | WDG-4 (12011 & 12018) | Hubli (UBL) | Currently undergoing trials |
2 | WAG-11 | 29002 | WDG-4 (12014 & 12017) | Hubli (UBL) | Currently undergoing trials |
3 | WAG-11 | 29003 | WDG-4 (12012 & 12013) | Hubli (UBL) | Currently undergoing trials |
For Conversion
Railway Board sent a circular to identify 16 WDG-4 locos that would be converted to WAG-11 during the financial year 2020-2021.[10]
No | locomotives class | Previous shed | locomotive number | Status | ref |
---|---|---|---|---|---|
1. | WDG-4 | Hubli (UBL) | 12002 | to be converted in 2020-2021 by NR | [11] |
2. | WDG-4 | Hubli (UBL) | 12003 | conversion scheduled for March 2020 | [12] |
3. | WDG-4 | Hubli (UBL) | 12004 | conversion scheduled for March 2020 | [13] |
4. | WDG-4 | Hubli (UBL) | 12005 | to be converted in 2020-2021 by NR | [14] |
5. | WDG-4 | Hubli (UBL) | 12006 | to be converted in 2020-2021 by NR | [15] |
6. | WDG-4 | Hubli (UBL) | 12007 | converted to WAG-11 #29002 | [16] |
7. | WDG-4 | Hubli (UBL) | 12008 | conversion scheduled for March 2020 | [17] |
8. | WDG-4 | Hubli (UBL) | 12009 | conversion scheduled for March 2020 | [18] |
9. | WDG-4 | Hubli (UBL) | 12010 | scheduled for March 2020 | [19] |
10. | WDG-4 | Hubli (UBL) | 12011 | converted to 'WAG-11' #29001 | [20] |
11. | WDG-4 | Hubli (UBL) | 12012 | converted to 'WAG-11' #29003 | [21] |
12. | WDG-4 | Hubli (UBL) | 12013 | converted to 'WAG-11' #29003 | [22] |
13. | WDG-4 | Hubli (UBL) | 12014 | converted to 'WAG-11' #29002 | [23] |
14. | WDG-4 | Hubli (UBL) | 12015 | to be converted in 2020-2021 by SR | [24] |
15. | WDG-4 | Krishnarajapuram (KJM) | 12016 | to be converted in 2020-2021 by SR | [25] |
16. | WDG-4 | Hubli (UBL) | 12017 | converted to 'WAG-11' #29002 | [26] |
17. | WDG-4 | Hubli (UBL) | 12018 | converted to 'WAG-11' #29001 | [27] |
18. | WDG-4 | Hubli (UBL) | 12019 | to be converted in 2020-2021 by SR | [28] |
19. | WDG-4 | Hubli (UBL) | 12020 | to be converted in 2020-2021 by SR | [29] |
20. | WDG-4 | Krishnarajapuram (KJM) | 12021 | to be converted in 2020-2021 by SR | [30] |
21. | WDG-4 | Hubli (UBL) | 12022 | to be converted in 2020-2021 by SER | [31] |
22. | WDG-4 | Hubli (UBL) | 12023 | to be converted in 2020-2021 by SER | [32] |
23. | WDG-4 | Hubli (UBL) | 12024 | to be converted in 2020-2021 by SER | [33] |
24. | WDG-4 | Krishnarajapuram (KJM) | 12025 | to be converted in 2020-2021 by SR | [34] |
25. | WDG-4 | Krishnarajapuram (KJM) | 12026 | to be converted in 2020-2021 by SCR | [35] |
26. | WDG-4 | Krishnarajapuram (KJM) | 12027 | to be converted in 2020-2021 by SCR | [36] |
27. | WDG-4 | Krishnarajapuram (KJM) | 12028 | to be converted in 2020-2021 by SCR | [37] |
28. | WDG-4 | Krishnarajapuram (KJM) | 12029 | to be converted in 2020-2021 by SCR | [38] |
29. | WDG-4 | Krishnarajapuram (KJM) | 12030 | to be converted in 2020-2021 by SER | [39] |
Locomotive shed
Zone | Name | Shed code | Quantity |
---|---|---|---|
SER | Bondamunda | BNDM | 3 |
Total Locomotives Active as of November 2020 | 3 |
See also
References
Wikimedia Commons has media related to Indian locomotive class WAG-11. |
Notes
- Nanda, Jyotika Sood,Prashant K. (September 12, 2018). "Govt approves 100% electrification of railways by 2021-22". Livemint. Retrieved May 4, 2020.
- "Conversion Order" (PDF).
- "Mission Electrification To Cover 24,000 Km Track In 5 Years". NDTV.com. Retrieved May 4, 2020.
- Srinand Jha (January 15, 2020). "Modi govt wants 100% rail electrification but doesn't know what to do with diesel engines". ThePrint. Retrieved May 15, 2020.
- "WAG-11 traction" (PDF).
- "डीरेका ने बनाया सबसे शक्तिशाली रेल इंजन, जांच के लिए भेजा गया तुगलकाबाद शेड". Amar Ujala. Retrieved May 15, 2020.
- Wag 11 on short Run II Railway Tube II, retrieved May 15, 2020
- "Electric Locomotive Allocation and Transfer Updates". RailPost.in - Indian Railways News & Analysis. March 13, 2020. Retrieved May 15, 2020.
- "Tender WAG-11" (PDF).
- Chowdhury, Soumik. "4595911-0: List of SWR WDG4 loco nominated for Conv - Railway Enquiry". indiarailinfo.com. Retrieved May 15, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12002 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12002 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12003 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12005 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12006 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12007 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12008 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12009 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12010 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12011 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12012 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12013 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12014 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12015 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Krishnarajapuram (KJM) WDG-4 12016 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12017 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12018 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12019 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12020 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Krishnarajapuram (KJM) WDG-4 12021 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12022 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12023 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Hubli (UBL) WDG-4 12024 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Krishnarajapuram (KJM) WDG-4 12025 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Krishnarajapuram (KJM) WDG-4 12026 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Krishnarajapuram (KJM) WDG-4 12027 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Krishnarajapuram (KJM) WDG-4 12028 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Krishnarajapuram (KJM) WDG-4 12029 Show". www.irfca.org. Retrieved May 28, 2020.
- "[IRFCA] Indian Railways Locomotive Roster Krishnarajapuram (KJM) WDG-4 12030 Show". www.irfca.org. Retrieved May 28, 2020.
Bibliography
- Hughes, Hugh (1996). Indian Locomotives: Part 4 – 1941–1990. Harrow, Middlesex: The Continental Railway Circle. ISBN 0-9521655-1-1.