Hokkaido Electric Power Company
The Hokkaido Electric Power Company (北海道電力株式会社, Hokkaidō Denryoku Kabushiki-gaisha) (TYO: 9509), or Hokuden (ほくでん) for short, is the monopoly electric company of Hokkaidō, Japan. It is also known as Dōden and HEPCO. The company is traded on the Tokyo Stock Exchange (first section), Osaka Securities Exchange (first section), and Sapporo Securities Exchange.
Headquarters in Sapporo (note the Hokuden (ほくでん) logo in the upper right) | |
Native name | 北海道電力株式会社 |
---|---|
Romanized name | Hokkaidō Denryoku Kabushiki-gaisha |
Type | Public KK TYO: 9509 |
Industry | Electricity generation and transmission |
Founded | May 1, 1951 in Sapporo, Hokkaidō, Japan |
Headquarters | 2, Higashi 1-chome, Odori, Chuo-ku, , |
Number of locations |
|
Area served | Hokkaido |
Key people | |
Production output | Generated electrical power:
|
Revenue |
|
| |
¥(64,207) million (Consolidated, loss) (FY2014) | |
Total assets |
|
Number of employees |
|
Website | www |
Footnotes / references [1][2] |
According to the company profile, during fiscal 2011 (i.e. 1 April 2010 to 31 March 2011), 26% of the electricity generated was from nuclear, 31% from coal, 15% from hydro, 8% from oil and 2% from 'new energy' sources.[3]
Hokkaido only has one nuclear power station, the Tomari Nuclear Power Plant.
Facilities
- Nuclear
- Coal
- Tomato-atsuma Thermal Power Station (ja:苫東厚真発電所)(1,650 MW)
- Naie (奈井江発電所)(350 MW)
- Sunagawa (砂川発電所)(250 MW)
- Geothermal energy
- Mori (ja:森発電所)(2.5 MW)
- Hydro electric – 53 dams including the following:[4]
- Hoheikyo, Ishikari River (50 MW)
- Kamiiwamatsu, Tokachi River (30.4 MW)
- Niikappu, Niikappu River(200 MW)
- Nokanan, Ishikari River (30 MW)
- Okuniikappu, Niikappu River (44 MW)
- Shizunai, Shizunai River (48 MW)
- Takami, Shizunai River(200 MW)
- Takisato, Ishikari River (57 MW)
- Tokachi, Tokachi River (40 MW)
- Tomura, Tokachi River (40 MW)
- Uryu, Ishikari River (51 MW)
- Oil
- Date (伊達発電所)(700 MW)
- Shiriuchi (知内発電所)(700 MW)
- Tomakomai (苫小牧発電所)(250 MW)
- Diesel
- Onbetsu (音別発電所)(280 MW)
Others;
- Wind farms – 3 facilities(1.58 MW)
- Solar (photovoltaic) energy – 9 facilities(146 kW)
Generating capacity by source
Source | Megawatts | Percentage | Number of units |
---|---|---|---|
Coal | 2,250 | 30 | 3 |
Nuclear | 2,070 | 27.5 | 3 |
Oil | 1,650 | 22 | 3 |
Hydro | 1,231 | 16 | 53 |
Diesel | 280 | 4 | 1 |
Geo-thermal | 50 | 0.5 | 1 |
Other | 2 | - | |
Total | 7,533 | 100 | 62? |
References
- Sources
- Hokkaido Electric Power Company (September 2017). "Fact Book 2017" (PDF) (in English and Japanese). Archived from the original (PDF) on 21 September 2019. Retrieved 21 September 2019.
- Hokkaido Electric Power Company (2018). "Hokuden Group Report 2018" (PDF). Archived from the original (PDF) on 21 September 2019. Retrieved 21 September 2019.
- "Corporate profile page of Hokkaido Electric Power Company, accessed 10 September 2011". Archived from the original on 17 August 2011. Retrieved 10 September 2011.
- Kyogoku pumped storage project is under construction and due for completion in 2015. It will provide 600 MW.
-
- HEPCO Sustainability Report 2008 Archived 2011-10-02 at the Wayback Machine
- This article incorporates material from 北海道電力 ("Hokkaido Electric Power") in the Japanese Wikipedia, retrieved on September 29, 2007.
External links
Wikimedia Commons has media related to Hokkaido Electric Power Company. |
- Hokkaido Electric Power Co., Inc. (in English)
- HEPCO Sustainability Report 2008 (in English)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.