General Asım Gündüz (İzmir Metro)

General Asım Gündüz is a proposed underground station on the Üçyol–Çamlıkule Line of the İzmir Metro. It will be located beneath Halide Edip Adıvar Boulevard, next to Mahmut Yaşar Bostancı Park, in southern Konak.[1] Construction of the station, along with the metro line, is expected to begin in 2020.[2] West of the station, the line will split and loop around to Üçyol. The northern part of the loop will stop at Zafertepe, while the southern part will stop at Bozyaka. The two section will meet at Üçyol.[1]

General Asım Gündüz
İzmir Metro rapid transit station
LocationHalide Edip Adıvar Cd., Güneşli Mah., 35110
Konak
Coordinates38.396224°N 27.133137°E / 38.396224; 27.133137
Owned byİzmir Metropolitan Municipality
Operated byİzmir Metro A.Ş.
Line(s)
Tracks2
Construction
Disabled accessYes
History
Opened2024 (2024) (expected)
Services
  Future service  
Preceding station   İzmir Metro   Following station
toward Üçyol
Üçyol—Çamlıkule
(2022)
toward Çamlıkule
toward Üçyol

General Asım Gündüz station is expected to open in 2024.[2]

References

  1. "Üçyol-Buca Metrosu Çamlıkule'ye uzadı - son yenilikler, ne zaman başlıyor?". izmirlininsesi (in Turkish). 3 August 2016. Archived from the original on 5 November 2017. Retrieved 25 December 2017.
  2. "Üçyol- Buca Metrosu'nun yapımına 2018'de başlanacak". ensonhaber.com (in Turkish). 13 July 2017. Retrieved 25 December 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.