Güssing

Güssing (Hungarian: Németújvár, Német-Újvár, Croatian: Novi Grad) is a town in Burgenland, Austria. It is located at 47°4′N 16°19′E, with a population of 3,811 (2011), and is the administrative center of the Güssing district.

Güssing
Coat of arms
Güssing
Location within Austria
Coordinates: 47°4′N 16°19′E
CountryAustria
StateBurgenland
DistrictGüssing
Government
  MayorPeter Vadasz
Area
  Total49.31 km2 (19.04 sq mi)
Elevation
229 m (751 ft)
Population
 (2018-01-01)[2]
  Total3,655
  Density74/km2 (190/sq mi)
Time zoneUTC+1 (CET)
  Summer (DST)UTC+2 (CEST)
Postal code
7540
Websitewww.guessing.co.at

History

Overview

Güssing Castle, built in 1157, is the oldest castle in Burgenland and a regional landmark.

The lords of Güssing (in Hungarian: Kőszeg, in Slovak: Kysak) were a noble family in the frontier region of Austria and the Kingdom of Hungary. Note that Kőszeg is the name of a nearby Hungarian town (known as Güns in German) to which that family moved its residence from Güssing in 1274. In 1522, it became the residence of the Batthyány family, one of the most distinguished Magnate families in Hungary.

Notable people

Renewable energy

Güssing, a major town in south Burgenland, a district comprising around 27,000 inhabitants, is the first community in the European Union to produce its whole energy demand – electricity, heating/cooling, fuels – out of renewable resources, all resources from within the region. However, to appreciate the enormity of this achievement, you need to rewind and go back to 1988 when Güssing was one of the poorest regions in Austria. Then, the community relied on agriculture, with farmers selling corn, sunflower oil and timber to make a living. While in terms of tourism, the main attraction was a 12th-century castle built by Hungarian nobles. On account of the geographically unfavourable location near the border, major trade or industrial businesses did not exist at that time and the whole district did not have any transportation infrastructure at all (neither railroad nor highway). This resulted in a scarcity of jobs, 70% weekly commuters to Vienna and a high rate of migration to other regions. At the time, the town was said to be hardly able to afford its annual €6 million (£4.7million) fuel bill. To change this situation the “reformers” realised that substantial capital outflow from the region is due to the town's energy being bought from outside sources. This included oil, power and fuels, while existing resources e.g. 45% forest land, remained largely unused. Thus the “reformers” proposed to abandon fossile energy and start producing and subsequently selling energy to the citizens (customers) themselves. So they wanted to keep that € 6 Million (value for 1992, based on conventional energy prices of that year) in the city.

In the early 1990s, a policy was proposed which called for a complete abandonment of fossil-fuel-based energy. The objective was to supply, in a first step, the town of Güssing and subsequently the whole district with regionally available renewable energy sources. The election of the town's current mayor, Peter Vadasz, in 1992 accelerated the process, particularly when he appointed Reinhard Koch, an electrical engineer and native of Güssing, to assess how the town could benefit from its natural resources, i.e. forest land. Koch was "fresh" out of university and was not willing to share the destiny of many local commuters to Vienna. The first step taken was to order that all public buildings in the town should stop using fossil fuels.

As result of the energetic optimisation of buildings in the town, expenditure on energy was reduced by almost 50%. Then a wood-burning plant that provided heating for 27 houses was built. Then, a facility was constructed which turned rapeseed into car fuel. In 1998, Koch and Vadasz saw a presentation by a Viennese scientist, Hermann Hofbauer, about a technology he had developed to make an alternative fuel from wood. They asked Hofbauer and Vienna's Technical University to build a pilot project in Güssing applying the technology, where wood chips are gasified under high temperature conditions. Gas fuels a Jenbacher engine that produces electricity and the “by-product” heat is used to produce warm water for the district heating system. Plant efficiency about 82-85%. Research and development went further on, so Güssing hosts today a number of innovative technologies, solutions, and patents. Today there is a team of highly trained technicians and scientists working in Güssing.

The renewable-energy project expanded to the region and there are 27 decentralized power plants within the Güssing county. Güssing today has an “energy” turnover of about € 14 Million p.a. Part of the profit is invested back into renewable energy projects.

What effect has this had on the region? A special scheme (very easy – stable energy prices, not linked to oil & gas, guaranteed long-term, 10–15 years) promoting the establishment of enterprises in the area has brought 50 new enterprises with more than 1,000 direct and indirect jobs in the city. (these 1000 jobs are in the City, region not calculated). Güssing has since developed into an important location for industries with high energy consumption, such as parquetry production or hardwood drying. The real highlight is the Blue Chip Energy, first high-efficiency solar cell production in Austria, a joint venture with Solon AG, who came to Güssing only because they can power the plant with clean energy from the renewable resources.

The town is conscious about the resources and is keen to take care and look after the surrounding forest to ensure they have a good supply of renewable energy for the future. Added to which, the town is currently using less than half of its yearly wood growth supply to feed its power plants. Thus, no cutting the substance.

Within the process of becoming energy autonomous city, a number of proprietary technologies and patents developed, to be applied in different fields, such as photovoltaic, biomass, etc. Also, extensive experience in analysis, preparation and implementation of such projects was accumulated, that experience to be given to other cities and communities willing to go the same renewable way.

Güssing today enjoys truly international popularity. Thus, ECRE Güssing International AG was established as the central company to expose Güssing internationally (www.ecreag.com).

Significant power plants include a 2 MW electric power 4.5 MW thermic wood gas generator power plant in Güssing and, in nearby Strem, a 0.5 MW electric power 0.5 MW thermic biomass gasification power plant using green silage re-growing raw materials like grass, clover, mains, sunflower.

As side effect, extra income is being brought into the town through eco-tourism. Visitors flock from around the world to gain inspiration from the town and keen to stay true to their eco-friendly roots, guests can stay in hotels that are heated and electrically powered all by renewables. Some 30,000 visitors were recorded during 2007.

See also

References

  • DI Dean Marcelja (ECRE AG) & Geraldine Faulkner (Sustainable Solutions), 2008
  1. "Dauersiedlungsraum der Gemeinden Politischen Bezirke und Bundesländer - Gebietsstand 1.1.2018". Statistics Austria. Retrieved 10 March 2019.
  2. "Einwohnerzahl 1.1.2018 nach Gemeinden mit Status, Gebietsstand 1.1.2018". Statistics Austria. Retrieved 9 March 2019.
  3. "Archived copy". Archived from the original on 2009-07-22. Retrieved 2009-08-13.CS1 maint: archived copy as title (link), Steinberg: , "Archived copy". Archived from the original on 2011-07-20. Retrieved 2009-08-13.CS1 maint: archived copy as title (link)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.