Dongfeng Dam

The Dongfeng Dam is an arch dam on the Wu River 65 km (40 mi) northwest of Qingzhen in Guizhou Province, China. The primary purpose of the dam is hydroelectric power generation and it supports a 570 MW power station. Construction on the dam began in 1989 and the first generator was operational in 1994, the last in 1995. The generators were up-rated between 2004 and 2005; bringing their capacity from 170 MW each to 190 MW.

Dongfeng Dam
Location of Dongfeng Dam in China
CountryChina
LocationQingzhen
Coordinates26°51′19″N 106°09′18″E
StatusOperational
Construction began1989
Opening date1995
Owner(s)Guizhou Wujiang Hydropower Development Co.
Dam and spillways
Type of damArch
ImpoundsWu River
Height162 m (531 ft)
Length254 m (833 ft)
Width (crest)6 m (20 ft)
Width (base)25 m (82 ft)
Spillway capacity2,565 m3/s (90,582 cu ft/s)
Reservoir
Total capacity1,025,000,000 m3 (830,981 acre⋅ft)
Active capacity491,000,000 m3 (398,060 acre⋅ft)
Catchment area1,816 km2 (701 sq mi)
Normal elevation970 m (3,182 ft)
Power Station
Commission date1994-1995
TypeConventional
Hydraulic head132 m (433 ft) (max)
Turbines3 x 190 MW Francis-type
Installed capacity570 MW
Annual generation2,420 GWh

Design and operation

The Dongfeng is a 162 m (531 ft) tall and 254 m (833 ft) long parabola-shaped arch dam. The dam is 6 m (20 ft) thick at its crest and 25 m (82 ft) at its base. It sits at the base of a catchment area covering 1,816 km2 (701 sq mi). The total reservoir capacity is 1,025,000,000 m3 (830,981 acre⋅ft) while 491,000,000 m3 (398,060 acre⋅ft) is for regulating. At the reservoir's normal elevation of 970 m (3,182 ft) above sea level, the reservoir capacity is 864,000,000 m3 (700,456 acre⋅ft). The dam has several discharge facilities; three spillway gates near the crest, three intermediate orifice openings, one chute spillway on the left bank and beside it, one spillway tunnel. The maximum discharge capacity of the spillways is 2,565 m3/s (90,582 cu ft/s) while all openings, including the power station tailrace, can discharge 12,369 m3/s (436,807 cu ft/s). The power station is located underground on the right bank of the dam. The intake releases water to three headrace tunnels which transfer into penstocks and supply each of the 190 MW Francis turbine-generators. Water is discharged back into the river via one tailrace tunnel.[1][2][3]

See also

References

  1. "Dongfeng hydropower station Introduction". ChinaWater. Archived from the original on 1 October 2011. Retrieved 30 August 2011.
  2. "Dongfeng Hydropower Station Introduction" (in Chinese). 52Data. Retrieved 30 August 2011.
  3. "Wujiang Dongfeng Hydropower Station" (in Chinese). PowerFoo. Retrieved 30 August 2011.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.