Chinese destroyer Taizhou (138)
Taizhou (138) is a Type 956EM destroyer of the People's Liberation Army Navy.
Taizhou underway on 17 August 2015 | |
History | |
---|---|
China | |
Name: |
|
Namesake: | |
Builder: | Severnaya Verf, Saint Petersburg |
Laid down: | 3 July 2002 |
Launched: | 27 April 2004 |
Commissioned: | 28 December 2005 |
Renamed: |
|
Homeport: | Zhoushan |
Identification: | Pennant number: 138 |
Status: | Active |
General characteristics | |
Class and type: | Type 956EM destroyer |
Displacement: | 6,600 tons standard, 8,480 tons full load |
Length: | 156 m (511 ft 10 in) |
Beam: | 17.3 m (56 ft 9 in) |
Draught: | 6.5 m (21 ft 4 in) |
Propulsion: | 2 shaft steam turbines, 4 boilers, 75,000 kW (100,000 hp), 2 fixed propellers, 2 turbo generators,and 2 diesel generators |
Speed: | 32.7 knots (60.6 km/h; 37.6 mph) |
Range: |
|
Complement: | 350 |
Sensors and processing systems: |
|
Electronic warfare & decoys: | 2 PK-2 decoy dispensers (200 rockets) |
Armament: |
|
Aircraft carried: | 1× Ka-27 series helicopter |
Aviation facilities: | Helipad |
Development and design
A new project began in the late 1960s when it was becoming obvious in the Soviet Navy that naval guns still had an important role particularly in support of amphibious landings, but existing gun cruisers and destroyers were showing their age. A new design was started, employing a new 130-millimetre (5.1 in) automatic gun turret.
The Type 956EM ships are 156 metres (511 ft 10 in) in length, with a beam of 17.3 metres (56 ft 9 in) and a draught of 6.5 metres (21 ft 4 in).
The Chinese People's Liberation Army Navy Surface Force (PLAN) had two modified Sovremenny-class destroyers delivered in December 1999 and November 2000. In 2002, the PLAN ordered two improved versions designated 956-EM. The first vessel was launched in late 2005, while the second was launched in 2006. All four vessels were commissioned to the East Sea Fleet.
The project cost 600 million US$ (mid-1990s price) for Project 956E (two ships), and 1.4 billion US$ (early-2000s price) for Project 956EM (two ships).[1][2]
Construction and career
Taizhou was laid down on 3 July 2002 and launched on 27 April 2004 by Severnaya Verf in Saint Petersburg. She was commissioned on 28 December 2005.
Gallery
- Taizhou in Saint Petersburg in 22 January 2006.
- Taizhou in Saint Petersburg in 22 January 2006.
- Taizhou underway on 12 December 2014.
- Taizhou underway on 23 August 2015.
- Taizhou underway on 23 August 2015.
- Taizhou underway on 29 August 2015.
- Taizhou in Saint Petersburg in December 2015.
References
- Novichkov, Nikolai; Chang, Yihong; Scott, Richard (8 January 2002). "China buys two more Project 956EM ships". Jane's Defence Weekly. Archived from the original on 2002-02-06.
- "Project 956 (Sovremenny Class) Missile Destroyer". SinoDefence. Archived from the original on 2006-08-22. Retrieved 2006-08-22.