Chhapra–Mumbai CST Antyodaya Express

The Chhapra - Mumbai CST Antyodaya Express is a weekly Antyodaya Express, running between Chhapra Junction and Mumbai CST via Bhopal, Jhansi, Kanpur and Basti. It is numbered 15102/15101. This train is operated and maintained by North Eastern Railway zone of Indian Railways.[1]

Chhapra - Mumbai CSMT Antyodaya Express
Overview
Service typeExpress
Current operator(s)Northern Eastern Railway
Route
StartChhapra Junction
Stops17
EndChhatrapati Shivaji Terminus
Distance travelled1,882 km (1,169 mi)
Average journey time35 hours
Service frequencyWeekly
Train number(s)15101 / 15102
On-board services
Class(es)UR/GEN
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesNo
Technical
Rolling stockLHB-Antyodaya
Track gauge1,676 mm (5 ft 6 in)
Operating speed54 km/h (34 mph)
Route map

Till 25 April 2019, it was run as the Jan Sadharan Express with ICF Coaches and later 26 April 2019 it's upgraded to LHB Coaches and runs as the Antyodaya Express.[2]

Coaches

The 15101 / 02 Chhapra Junction - Mumbai CST Antyodaya Express has 23 general unreserved & two SLR (seating with luggage rake) coaches . It does not carry a pantry car coach.

As is customary with most train services in India, coach composition may be amended at the discretion of Indian Railways depending on demand.

Service

The 15101 Chhapra Junction - Mumbai CST Antyodaya Express covers the distance of 1,882 km (1,169 mi) in 33 hours 10 mins (57 km/hr) & in 37 hours 05 mins as the 15102 Mumbai CST - Chhapra Junction Antyodaya Express (51 km/hr).

As the average speed of the train is lower than 55 km/h (34 mph), as per railway rules, its fare doesn't includes a Superfast surcharge.

Routing

This train runs via Siwan Junction, Bhatni, Gorakhpur Junction, Basti, Gonda Junction, Lucknow Junction(NER), Kanpur Central, Orai, Jhansi Junction, Bhopal Junction, Khandwa Junction, Bhusaval Junction, Manmad Junction, Nasik Road, Kalyan Junction to reach Mumbai CST.

Traction

As the route is going to electrification, a Samastipur Junction based WDM-3D diesel locomotive pulls the train up to Jhansi Junction later, an electric locomotive WAP-4 pulls the train to its destination.

References

  1. , jagran.com, 12 May 2017
  2. , Retrieved 22 May 2019
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.