Brazilian submarine Humaytá
Humaytá was a modified Balilla-class submarine built in Italy for the Brazilian Navy. The submarine was laid down by Odero-Terni-Orlando at La Spezia on 19 November 1925, launched on 11 June 1927, and handed over to the Brazilian Navy on 11 June 1929. Proceeds from the sale of the Marshal Deodoro to the Mexican Navy provided funds for Humaytá's purchase. Humaytá was commissioned into the Brazilian Navy on 20 July 1929. She remained in Brazilian service through World War II and was decommissioned on 25 November 1950.[2]
History | |
---|---|
Brazil | |
Name: | Humaytá |
Laid down: | 19 November 1925 |
Launched: | 11 June 1927 |
Commissioned: | 20 July 1929 |
Decommissioned: | 25 November 1950 |
Fate: | Scrapped |
General characteristics [1] | |
Class and type: | Modified Balilla-class submarine |
Displacement: | |
Length: | 86.7 m (284 ft) |
Beam: | 7.77 m (25.5 ft) |
Draught: | 4.26 m (14.0 ft) |
Propulsion: |
|
Speed: |
|
Range: |
|
Test depth: | 100 m (330 ft) |
Complement: | 61 |
Armament: |
|
See also
- List of submarines of the Second World War
References
- Gogin, Ivan (2011). "Humaytá submarine (1929)". navypedia.org. Retrieved 18 June 2012.
- "Poder Naval - Marinha de Guerra, Tecnologia Militar Naval e Marinha Mercante". naval.com.br (in Portuguese). 2012. Retrieved 18 June 2012.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.