Boring Test Tunnel
The Boring Test Tunnel is a tunnel in Hawthorne, California for testing Hyperloop and Loop-based transportation.[3] It was completed by The Boring Company in late 2018. The single-bore tunnel was constructed during 2017‒2018 using a 4.2-metre (14 ft) diameter tunnel boring machine, giving a finished 3.8-metre (12 ft) internal diameter.
Overview | |
---|---|
Other name(s) | Hawthorne test tunnel |
Location | Hawthorne, California |
Coordinates | |
Route | West 120th Street |
Start | SpaceX car park |
No. of stations | 3 |
Operation | |
Work begun | December 17, 2016 |
Opens | December 18, 2018 |
Operator | The Boring Company |
Character | Limited Access |
Technical | |
Length | 1.83 km (1.14 mi; 6,000 ft)[1] |
No. of lanes | 1 |
Operating speed | 205 km/h (127 mph)[2] |
Width | 3.8 metres (12.5 ft) |
Route
Boring Test Tunnel | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Most of the route runs outside and set back from the perimeter of Hawthorne Municipal Airport, with a very short section under the corner of the airport fence, without going under the runway.[4]
The tunnel starts between the Dominguez Channel storm drain and Crenshaw Boulevard at an entrance pit constructed on car park land owned by SpaceX. A short straight section heading northwards is followed by a 530-foot-radius (161.5 m) curve westwards under West 120th Street, then a long straight tunnel, a slight curve and a final short straight to the Exit Shaft. The midpoint of the tunnel is planned to connect with a very short northwards spur to a small car parking system-style car elevator leading up inside a residential garage behind a house at 3834 West 119th Place.[5]
Timeline
On December 17, 2016, Elon Musk stated that he was frustrated with traffic jams, and would start building a tunnel.[6] By April 2017, The Boring Company had obtained a second-hand tunnel boring machine, transported the machine to Hawthorne, and had it repainted in Boring Company colours.[7]
On January 31, 2018, the Boring Company acquired the land around a family house at 3834 West 119th Place for $500,000.[8] On May 9, 2018, the Boring Company acquired land on the corner of West 120th and Prairie Avenue for $2 million, purchasing the corner plots 309 and 308 at 12007 Prairie Avenue[9] and Plots 304‒307 behind.[10]
On October 5, 2018, the Hawthorne City Council granted an easement for up to 2,600 metres (8,600 ft) of tunnel, in exchange for a structural encroachment fee of $2.5 million. Permission for the first 210 metres (700 ft) of tunnel under SpaceX's own land had been obtained earlier.[11]
On October 17, 2018, in preparation for opening "The Brick Store", the company applied for permission to paint the building at 12003 Prairie Avenue in The Boring Company black-and-white corporate colours.[12]
An opening ceremony for the test tunnel was originally scheduled for December 10, 2018,[13] then moved to December 18, 2018.[14]
Operation
During the launch day on December 18, 2018, cars operated using guided busway-style side-facing guide wheels. This fleet of Tesla Model X vehicles travelled at up to 65 kilometres per hour (40 mph).[15]
References
- Lopatto, Elizabeth (December 19, 2018). "I took a ride through Elon Musk's new tunnel in California". Retrieved December 19, 2018.
top speed is 40 miles per hour … 1.14 mile tunnel … one-mile test tunnel … year and a half to complete, … about $10 million, not counting research and development
-
Hawkins, Andrew (May 24, 2019). "Elon Musk's Boring Company staged a race between a Tesla in a tunnel and one on the road". Retrieved June 15, 2019.
the Tesla in the tunnel hit a maximum speed of 127 mph
- "The Boring Company Projects page: 2020". The Boring Company. November 11, 2020. Archived from the original on November 11, 2020. Retrieved November 11, 2020.
- Shadbehr, Arnold; Miyahira, Russ (August 22, 2017). Agenda Item No. 6 (Report). Agenda Bill. City of Hawthorne City Council. p. 42.
strip of land 15 feet (4.6 m) wide … beginning of a non-tangent curve concave south westerly and having a radius of 530.00 feet (161.5 m) … 13.56 feet (4 m) southerly of the 120th Street centerline … thence tangent to said curve … parallel with and distant southerly a distance of 7,721.21 feet (2,350 m) to a point of terminus
- Shadbehr, Arnold; James, Brian; Planning & Community Development (September 11, 2018). Agenda Item No. 9 (Planning report) (Report). Agenda Bill. City of Hawthorne City Council.
- Musk, Elon [@elonmusk] (December 17, 2016). "Traffic is driving me nuts. Am going to build a tunnel boring machine and just start digging..." (Tweet) – via Twitter.
- Muoio, Danielle (April 27, 2017). "We just got our first glimpse of Elon Musk's new tunnel company". Business News.
- Parcel detail: 4048-011-032. Assessor Portal (Report). Los Angeles County. January 31, 2018.
3834 W 119TH PL Hawthorne CA 90250-3226 … TR=2603 E 60 FT EX OF ST of Lot 822 … Doc # 0104467 … DTT Sale Price: $485,004
- Parcel detail: 4046-008-027. Assessor Portal (Report). Los Angeles County. May 9, 2018.
12007 Prairie Ave, Hawthorne CA 90250-3107 … Corner Lot: Yes … *TR=Second add to Hawthorne*(ex of st) Lot 308 and (ex of sts) Lot 309 … Doc # 0456481 … DTT Sale Price: $1,995,019
- Parcel detail: 4046-008-028. Assessor Portal (Report). Los Angeles County. May 9, 2018.
4012 W 120th St, Hawthorne CA 90250-3107 … Corner Lot: No … M B 9-160 ex of st Lots 304 Thru 307 … Doc # 0456481 … DTT Sale Price: $1,995,019
- Huber, Norbert (October 5, 2017). Minutes of a Special Meeting of the City Council (PDF) (Report). City of Hawthorne.
- James, Brian; Palmer, Christopher (October 17, 2018). Administrative Color Approval – The Brick Store (staff report) (Report). Hawthorne Planning Commission.
Project Location: 12003 Prairie Avenue (APN # 4046-008-027) … Project Applicant: The Boring Company
- Brackett, Ed (October 22, 2018). "Rapid-transit test tunnel under LA will open to the public on December 10, Elon Musk says". CNBC.
- The Boring Company [@boringcompany] (December 6, 2018). "Tunnel opening now set for . Need another few days to finish the snail habitat. More details soon!" (Tweet). Retrieved December 13, 2018 – via Twitter.
- Lopatto, Elizabeth (December 19, 2018). "I took a ride through Elon Musk's new tunnel in California". The Verge. Retrieved April 18, 2020.
External links
- Official website
- Geographic data related to Boring Test Tunnel at OpenStreetMap
- Boring Company tunnel presentation before Hawthorne City Council. August 8, 2017 – via YouTube.
- King, Gayle (December 19, 2019). Elon Musk and Gayle King test drive his new Boring Company tunnel. CBS This Morning – via Youtube.
- LeBeau, Phil (December 19, 2018). Elon Musk unveils Boring Company loop tunnel for electric cars. CBNC News.