Bogor–Ciawi–Sukabumi Toll Road
Bogor-Ciawi–Sukabumi Toll Road or Bocimi Toll Road is a highway of 53.6-kilometer toll road link, which is under construction that will connect Bogor Regency, Bogor city, Sukabumi Regency and Sukabumi city in West Java, Indonesia. The 15.35-kilometer first section of the toll road between Ciawi and Cigombong was inaugurated by Indonesia's President Joko Widodo on 3 December 2018. [1]
Bogor-Ciawi-Sukabumi Bocimi | |
---|---|
Route information | |
Maintained by PT. Trans Jabar Toll | |
Length | 53.6 km (33.3 mi) |
Major junctions | |
From | Bogor |
Jagorawi Toll Road Depok–Antasari Toll Road | |
To | Sukabumi |
Location | |
Major cities | Bogor Regency, Bogor, Sukabumi Regency, Sukabumi |
Highway system | |
Roads and Highways in Indonesia |
Sections
Bocimi Toll Road consists of four sections, including
- Section I- Ciawi-Cigombong 15.3 km, formally opened on 1 December 2018.[2]
- Section II-Cigombong-Cibadak 12 km, in development
- Section III-Cibadak-West Sukabumi 14 km, pre-development, and
- Section IV- West Sukabumi-East Sukabumi 13 km, pre-development.
The toll road section I is expected to be fully operational by 2019.[3] The cost of this toll road is about Rp 7.7 trillion.
History
According to BPJT (Indonesian Toll Road Authority), a Concession Toll Road Agreement (PPJT) was initially signed by consortium PT. Bukaka Teknik Utama (PT Bukaka Teknik Utama 35%, PT. Graha Multitama Sejahtera 32.5%, PT. Karya Perkasa Insani 33.5%). In 2011, Bakrie group took over the majority shareholder of this toll road segment with PT. Trans Jabar Toll as operator. The composition of the shareholder were Bakrie Toll Road 60%, PT. Marga Sarana Jabar 25%, and PT. Bukaka Teknik Utama 15%. By the year 2014, MNC group acquired PT Bakrie Toll Road. Unfortunately, the Bocimi Toll Road project was not performed well. Finally, the progress of this project has been increasing significantly since PT. Waskita Toll Road become the shareholder majority of PT. Trans Jabar Toll in 2015. PT. Waskita Toll Road has 81.64% of shareholder while the rest are PT. Bukaka Mega Investama and PT. Jasa Sarana.[4]
Toll Gates
KM | Gate | Destination |
---|---|---|
Ciawi | Ciawi, Tajur, Cisarua Safari Park, Puncak | |
Cigombong | MNC Lido City, Mount Salak, Bodogol Nature Reserve, Cicurug | |
Cibadak | Cibadak, Cikidang, Palabuhanratu, Parungkuda | |
West Sukabumi | Sukabumi, Cisaat, Jampang Kulon, Ujung Genteng | |
East Sukabumi | Sukabumi, Sukaraja, Cianjur, Ciranjang, Bandung |
See also
References
- "This New Toll Road Drastically Cuts the Time It Takes You to Drive to Sukabumi". Jakarta Globe. Retrieved 4 December 2018.
- Sylke Febrina Laucereno (December 1, 2018). "Jokowi: Tol Bocimi akan Tersambung ke Bandung hingga Cilacap".
- "Tol Bocimi Akan Beroperasi pada 2019". Liputan 6. Retrieved 10 November 2017.
- R Adhi KSP (2010-10-05). "Tol Bogor-Sukabumi Dibangun Tahun 2011". Properti. KOMPAS.com. Retrieved 2017-11-10.