Biomass Energy Centre

Biomass Energy Centre is a biomass fired CHP power station located in the town of Chilton in County Durham. Opened in 2011, the plant was developed, and then owned and operated by Veolia Energy-Dalkia.

Biomass Energy Centre
Biomass Energy Centre, May 2011
CountryEngland
LocationChilton
Coordinates54°39′57″N 1°33′48″W
StatusOperational
Construction began2010
Commission date2011
Construction cost£40 million
Owner(s)Veolia Energy-Dalkia
Thermal power station
Primary fuelBiomass
Power generation
Nameplate capacity17.5 MW
External links
Websitewww.dalkia.co.uk

Development

In May 2009, Veolia Energy-Dalkia, who had a base in nearby Cramlington, Northumberland and had previously provided cogeneration (CHP) plants for the Newcastle General, Freeman and Royal Victoria Infirmary hospitals in Newcastle, announced their plans to build a biomass fueled CHP power station in the County Durham town of Chilton. The site chosen had previously been occupied by a feed mill and silo, which had been highly visible throughout the town and had come to be known locally as Chilton Cathedral. The new plant was expected to cost £40 million, half of which was to be spent within the North East region, on materials and components for the plant, aiding the local economy.[1]

Chilton Town Council voted unanimously in support of the plant, saying it would be a catalyst for the regeneration of the area, and this was supported by a 340 name petition from the local people.[1] Planning permission was granted later that June and construction commenced in January 2010.[2] 50 jobs were created during the construction of the plant, with 17 permanent jobs created following completion.[1] Commissioning of the plant began in June 2011, taking three to four weeks to complete.[2]

Operations

115,000 to 120,000 tonnes of wood are burned in the station per year, providing electricity for up to 20,000 homes through the National Grid. The plant is one of the first in the UK to burn domestic waste wood to provide electricity for the National Grid, rather than for an industrial site. It is the first of a number of similar sites which Dalkia are planning in the UK.[2]

The feedstock for the plant is wood which has reached the end of its useful life such as old shipping pallets, manufacturing offcuts, wood from the construction and demolition industries, and material from civic amenity sites. This wood is collected through a network set up by Dalkia[2] The fuel would other wise be sent to landfill.[1]

50,000 tonnes of wood pellets are produced on site each year, for use elsewhere.[1]

Design and specification

The plant has a generating capacity of 17.5 megawatts.[2]

References

  1. Henderson, Tony (20 May 2009). "Dalkia power plant scheme fuels hopes for Chilton". The Journal. Retrieved 19 August 2011.
  2. Quinault, Caealia (2 June 2011). "Dalkia's £40m biomass plant nears completion". letsrecycle.com. Retrieved 19 August 2011.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.