Bhadradri Thermal Power Plant

Bhadradri Thermal Power Station is a proposed power plant project located near Edulla Bayyaram at Manuguru in the Indian state of Telangana.

Bhadradri Thermal Power Station
CountryIndia
LocationNear Edulla Bayyaram, Manuguru, Khammam, Telangana
Coordinates17.937255°N 80.81852°E / 17.937255; 80.81852
StatusUnder COnstruction
Owner(s)TSGENCO
Operator(s)
Thermal power station
Primary fuelCoal
Power generation
Nameplate capacity1080 MW

History

Chief Minister of Telangana Kalvakuntla Chandrashekar Rao laid down foundation stone for this project on 28-March-2015. The project started to help resolve the power crisis in Telangana.[1] TS Govt is planning to make this plant operational within three years. Plant construction is by Bharat Heavy Electricals Limited.

MoEF has given environment clearance to the project on 15.03.2017[2] and BHEL has start EPC works on war footing to complete the first Unit by 2019. The first unit was synchronised on 19.09.2019, full load was achieved on 20.03.2020 and Trial run completed on 05.06.2020.

Capacity

UnitCapacity (In MW)Date of Commissioningstatus
127009 Jun 2020Commissioned[3]
2270Dec 2020 plannedUnder Erection
3270Dec 2020 plannedUnder Erection
4270Dec 2020 plannedUnder Erection