Baishiqiao Nan (S) station
Baishiqiao Nan (S) (simplified Chinese: 白石桥南站; traditional Chinese: 白石橋南站; pinyin: Báishíqiáonán Zhàn) is an interchange station on Line 6 and Line 9 of the Beijing Subway.[1][2] This station opened on December 30, 2012.[3]
Line 9 concourse | ||||||||||||||||
Location | West Chegongzhuang Road (车公庄西路) and South Shoudu Tiyuguan Road Haidian District, Beijing China | |||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Disabled access | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | December 30, 2012 | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
Location | ||||||||||||||||
Baishiqiao Nan (S) Location in central Beijing |
Station Layout
Both the line 6 and 9 stations have underground island platforms. The line 6 platforms are located a level under the line 9 platforms.
Exits
There are 5 exits, lettered A, B, C, E and G. Exits C and G are accessible.
Gallery
- Platform of line 9
- Platform sign of line 9
- line 9 Hall
- transfer to line 6
- line 6 platform
- Platform sign of line 6
- Baishiqiao Nan (S) station elevator
References
- 白石桥南 (in Chinese). Beijing Municipal Government. Archived from the original on 16 May 2012. Retrieved 29 April 2012.
- 北京地铁9号线将试运营 (in Chinese). Beijing Municipal Government. Retrieved 29 April 2012.
- (Chinese) 北京四地铁线30日开通 首末车时间确定. 新京报. Retrieved 26 December 2012.
Wikimedia Commons has media related to Baishiqiao South Station. |
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.