The Xi'an Metro, also known as the Xi'an Subway, is a rapid transit system in the city of Xi'an and the neighbouring city of Xianyang, in Shaanxi province, China.
Overview | |||
---|---|---|---|
Locale | Xi'an and Xianyang | ||
Transit type | Rapid transit | ||
Number of lines | 8 | ||
Number of stations | 100[lower-alpha 1] | ||
Daily ridership | 2.354 million (2018 average)[1] 4.0481 million (2020 record)[2] | ||
Annual ridership | 746.2 million (2018)[1] | ||
Operation | |||
Began operation | 16 September 2011 | ||
Operator(s) | Xi'an Rail Transit Group Co., Ltd.(Lines 1, 2, 3, 4, 5, 6, 9) Shaanxi Intercity Railway Co., Ltd. (subsidiary of Shaanxi Province Railway Group Co., Ltd) (Airport Intercity Railway) | ||
Technical | |||
System length | 245 km (152 mi) | ||
Track gauge | 1435 mm (standard gauge) | ||
|
Xi'an Metro | |||||||
---|---|---|---|---|---|---|---|
Traditional Chinese | 西安地鐵 | ||||||
Simplified Chinese | 西安地铁 | ||||||
|
The system has five lines in operation. Line 2 opened to the public on September 16, 2011.[3] Line 1 began operation on September 15, 2013. Line 3 began operation after months of delay on November 8, 2016. Line 4 opened on December 26, 2018. The Airport Intercity Railway opened on September 29, 2019.
History
Xi'an began its metro system plan in the mid-1980s. The plan was first submitted to the State Council in 1994, with four planned lines and a total length of 73.2 km (45.5 mi). In February 2004, the re-drafted plan was submitted to the State Government, which received final approval on September 13, 2006.
The first line, Line 2, began construction along Chang'an Street on 29 September 2006 and was completed in 2011. It runs north-south and passes under such historic sites as the Bell Tower and city wall. It is 26.6 km (17 mi) long with 23.5 km (15 mi) lying underground, approximately 20 meters below the surface. It is estimated to have cost 17.9 billion yuan (US$2.24 billion).[4] The route stretches from the Beikezhan to Weiqunan with 20 stops. The travel time is 39 minutes for the entire length, cutting the commute almost in half. Operations began on 28 September 2011.
Four other routes were planned to start construction in 2011 and to be finished by around 2020. When completed, the system will span 251.8 km (156.5 mi) and will mainly service the urban and suburban districts of Xi'an and part of Xianyang.[5]
On June 12, 2019, the NDRC approved the Phase III (2018-2024) Construction Plan of Xi'an Metro. The plan includes Line 1 (Phase 3), Line 2 (Phase 2), Line 8, Line 10 (Phase 1), Line 14, Line 15 (Phase 1), Line 16 (Phase 1). The total length of Xi'an Metro will be 423 kilometres (263 mi) in 2024.[6]
Lines in operation
Line | Terminals (District) |
Commencement | Newest Extension |
Length km |
Stations | Operators | |
---|---|---|---|---|---|---|---|
1 | Fenghesenlingongyuan (Qindu, Xianyang) |
Fangzhicheng (Baqiao) |
2013 | 2019 | 31.45[7] | 23 | |
2 | Beikezhan (Weiyang) |
Weiqunan (Chang'an) |
2011 | 2014 | 26.715[8] | 21 | |
3 | Yuhuazhai (Yanta) |
Baoshuiqu (Baqiao) |
2016 | — | 39.15 | 26 | |
4 | Beikezhan (Beiguangchang) (Weiyang) |
Hangtian Xincheng (Chang'an) |
2018 | — | 35.2 | 28[lower-alpha 2] | |
5 | Matengkong (Yanta) |
Chuangxingang (Chang'an) |
2020 | — | 45.5 | 34 | |
6 | Xi'anguojiyixuezhongxin (Chang'an) |
Xibeigongyedaxue (Lianhu) |
2020 | — | 20.1 | 15 | |
9 | Fangzhicheng (Baqiao) |
Qinlingxi (Lintong) |
2020 | — | 25.3 | 15 | |
Airport [lower-alpha 3] | Beikezhan (Beiguangchang) (Weiyang) |
Airport West (T1, T2, T3) (Weicheng, Xianyang) |
2019 | — | 29.31[9] | 9[lower-alpha 4] | |
Total | 245 | 171 |
- Discrepancies between these figures are explained by interchange stations. Currently there are 7 interchange stations. If interchange stations are counted once for each line they serve, there would be 107 stations.
- Huochezhan station is not opened.
- Through operation or merged into Line 14 (Xi'an Metro) in June 2021.
- Airport (T5) station is not opened.
Line 1
The second route, Line 1, was scheduled to start in late 2009 but was brought one year earlier as per Chinese government's response to the financial crisis of 2007–2010. Line 1 opened on 15 September 2013. The route runs from east to west. The line is 31.45 km (20 mi)[7] with 23 stations.
To accelerate the speed of overall economic development between Xi'an and Xianyang cities, the Transportation Department of Xi'an decided to extend Line 1 to promote business travel between the two cities, as well as improve the efficiency of land use alongside Line 1. The preparation phase for the extension Line 1 started with the compilation of a feasibility study on November 4, 2007.
Line 2
Line 2 opened on 16 September 2011. This line is 26.715 km (17 mi)[8] long with 21 stations.[10]
Line 3
Construction of Xi'an Metro's Line 3 broke ground in May 2011,[11] began public trial testing on September 20, 2016, and was opened at November 8, 2016. The line is currently 39.15 km (24.33 mi) long with 26 stations. When Phase 2 (still under planning) opens, the line will be 50.5 km (31.4 mi) long and with 31 stations.
Line 4
Construction of test section of Line 4 of Xi'an Metro started in late 2012.
Future Development
On June 12, 2019, the NDRC approved the Phase III (2018-2024) Construction Plan of Xi'an Metro. The plan includes Line 1 (Phase 3), Line 2 (Phase 2), Line 8, Line 10 (Phase 1), Line 14, Line 15 (Phase 1), Line 16 (Phase 1). The total length of Xi'an Metro will be 423 kilometres (263 mi) in 2024.[18]
in km |
||||||||
2021 | 2019 | 14 | Beikezhan (Beiguangchang) | Heshaocun | 13.65[17] | 8 | [17][19] | |
2022 | 2017 | 6 | Phase II | Xibeigongyedaxue[20] | Fangzhicheng | 19.8 | 16 | [21][22] |
2019 | 1 | Phase III | Qindu | Fenghesenlingongyuan | 10.61[23] | 7 | [23] | |
2 | Phase II (Northern extension) | Caotanbei | Beikezhan | 3.505[24] | 2 | [24] | ||
2 | Phase II (Southern extension) | Weiqunan | Changning | 3.417[24] | 2 | [24] | ||
2023 | 2019 | 16 | Phase I | Fengdongxiaozhen | Nengyuansanlu | 15.03[25] | 9[25] | [25] |
2024 | 2019 | 8 | Loop Line | 49.89[24] | 37[24] | [24] | ||
10 | Phase I | Yangjiazhuang | Shuijinggongyuan | 34.2[26] | 17[26] | [26] | ||
TBA | 2020 | 15 | Phase I | Xiliu | Hanjiawan | 19.5[27] | 13[27] | [27] |
Accidents
On 30 December 2008, a fire occurred that was extinguished within an hour; all workers evacuated safely. Just 66 hours later, on 2 January, another fire occurred at another station on Line 2.[28]
On 26 May 2009, an individual suffered minor injuries from a fire during infrastructure work on Line 1.
On 2 August 2009, 9:20am, a cave-in at the Sajinqiao section of Line 1 trapped migrant workers under 10 cubic meters of earth for over three hours, hospitalizing at least two who later died at the hospital.
See also
- List of rapid transit systems
References
- "2018年统计报告".
- "404.81万人次!西安地铁客运量昨日再创新高" (in Chinese). 西部网. 2021-01-01. Retrieved 2021-01-02.
- 西安地铁二号线开通 西安迈入"地铁时代" [Xi'an Metro line brings Xi'an into the "metro era"]. China National Radio (in Chinese). Beijing. September 16, 2006.
- "Xi'an: Ancient City Gets Own Metro System". China.org.cn. September 29, 2006.
- "Xian: the Building of Subway to Start This Year". Travel China Guide. September 14, 2006. Archived from the original on January 3, 2014.
- "国家发展改革委关于西安市城市轨道交通第三期建设规划(2018-2024年)的批复". 2019-06-12. Retrieved 2019-07-02.
- "西安市地铁一号线三期工程(秦都站~森林公园)环境影响报告书(征求意见稿)". 西安地铁官方网站. 2019-10-08. Retrieved 2019-10-08.
- "西安市地铁二号线二期工程(常宁~韦曲南、北客站~草滩北)环境影响报告书(征求意见稿)". 西安地铁官方网站. 2019-10-08. Retrieved 2019-10-08.
- "机场城际近日即将开通运营 全程需33分钟单程票价16元". 2019-09-23.
- 市政府召开西安地铁开通试运营新闻发布会. 2011-09-16. Archived from the original on November 14, 2011. Retrieved 2012-10-03.
- "Xi'an Subway Line 3 Breaks New Ground". eChinacities.com. May 19, 2011.
- http://o4g.xiancity.cn/system/2018/12/25/030623950.shtml
- "西安地铁4号线获批建设 与2号线构成南北向客流"双走廊"". wmxa.cn. May 6, 2014.
- 西安地铁四号线昨开始盾构 从南到北共设29站 新浪陕西
- "快讯!西安北至机场城际轨道9月29日通车试运营". 2019-09-27.
- "西安地铁8号线14号线年内开工 实现"六线齐发 九线共建"". 2019-02-16.
- "『西安』地铁14号线工程(北客站~贺韶村) 环境影响报告书公示". 2019-08-15.
- "国家发展改革委关于西安市城市轨道交通第三期建设规划(2018-2024年)的批复". 2019-06-12. Retrieved 2019-07-02.
- "西安地铁8号线14号线年内开工 实现"六线齐发 九线共建"". 2019-02-16.
- "关于西安地铁五号线一期、六号线、九号线车站和车辆基地命名方案的通告". 2019-10-18.
- "西安市城市轨道交通第二期建设规划调整方案(2013~2021年)获批复". 2016-02-23.
- "地铁六号线二期工程". 2016-10-12.
- "西安地铁1号线三期工程建设有序推进 线路长10.61公里设7座车站". 2020-06-12.
- "西安地铁2号线二期、8号线今日正式开工". 2019-10-31.
- "西安地铁16号线一期工程正式启动". 2019-12-13.
- "西安到高陵未来可以坐地铁了 10号线一期工程今天开工". 2020-07-01.
- "西安地铁15号线一期工程开工建设 线路全长约19.5千米共设车站13座". 2020-09-29.
- "Subway Collapse Kills Two in Xi'an". CRIENGLISH.com. China Radio International. August 3, 2009.